Site-work prices, Faulk, Spink County, SD
Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.
| Category | Unit | Winning items | Median | Range | Receipts |
|---|---|---|---|---|---|
| asphalt pavement | Ton | 4 | $115.25 | $59.53 to $700.00 | |
| excavation embankment | CuYd | 3 | $15.00 | $4.00 to $21.00 | |
| excavation embankment | LS | 1 | $27,000.00 | $27,000.00 to $27,000.00 | Bids
|
| flexible base | Ton | 1 | $35.75 | $35.75 to $35.75 | Bids
|
| lime cement stabilization | Ton | 1 | $315.00 | $315.00 to $315.00 | Bids
|
| storm pipe 18-inch | Ft | 4 | $50.50 | $36.50 to $185.00 | |
| storm pipe 24-inch | Ft | 2 | $65.00 | $41.00 to $89.00 | |
| storm pipe 30-inch | Ft | 2 | $77.00 | $56.00 to $98.00 | |
| storm pipe 42-inch | Ft | 2 | $96.50 | $38.00 to $155.00 | |
| storm pipe 60-inch | Ft | 2 | $192.50 | $100.00 to $285.00 |
Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.