Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.
| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | Ton | 8 | $115.00 | $31.50 to $765.00 | Bids- 2026-04-15 · SDDOT · 02R1 · $120.00 per Ton · qty 1371.3 · bid tab
- 2026-04-15 · SDDOT · 02R1 · $62.50 per Ton · qty 15399.3 · bid tab
- 2026-04-15 · SDDOT · 02R1 · $110.00 per Ton · qty 264.2 · bid tab
- 2026-04-15 · SDDOT · 02R1 · $765.00 per Ton · qty 101.5 · bid tab
- 2026-04-15 · SDDOT · 02R1 · $650.00 per Ton · qty 81.7 · bid tab
- 2026-04-15 · SDDOT · 02R1 · $650.00 per Ton · qty 785.1 · bid tab
- 2026-04-15 · SDDOT · 02R1 · $93.00 per Ton · qty 1608.1 · bid tab
- 2026-04-15 · SDDOT · 02R1 · $31.50 per Ton · qty 1975.7 · bid tab
|
| excavation embankment | CuYd | 3 | $15.00 | $11.00 to $48.00 | Bids- 2026-04-15 · SDDOT · 02R1 · $11.00 per CuYd · qty 705.0 · bid tab
- 2026-04-15 · SDDOT · 02R1 · $48.00 per CuYd · qty 1746.0 · bid tab
- 2026-04-15 · SDDOT · 02R1 · $15.00 per CuYd · qty 457.0 · bid tab
|
| flexible base | Ton | 2 | $22.85 | $4.20 to $41.50 | Bids- 2026-04-15 · SDDOT · 02R1 · $4.20 per Ton · qty 16652.0 · bid tab
- 2026-04-15 · SDDOT · 02R1 · $41.50 per Ton · qty 1583.2 · bid tab
|
| lime cement stabilization | Ton | 3 | $260.00 | $260.00 to $265.00 | Bids- 2026-04-15 · SDDOT · 02R1 · $260.00 per Ton · qty 16.1 · bid tab
- 2026-04-15 · SDDOT · 02R1 · $260.00 per Ton · qty 153.2 · bid tab
- 2026-04-15 · SDDOT · 02R1 · $265.00 per Ton · qty 13.7 · bid tab
|
| storm pipe 18-inch | Ft | 2 | $72.00 | $31.00 to $113.00 | Bids- 2026-04-15 · SDDOT · 02R1 · $31.00 per Ft · qty 36.0 · bid tab
- 2026-04-15 · SDDOT · 02R1 · $113.00 per Ft · qty 36.0 · bid tab
|
| storm pipe 24-inch | Ft | 4 | $106.50 | $58.00 to $123.00 | Bids- 2026-04-15 · SDDOT · 02R1 · $100.00 per Ft · qty 100.0 · bid tab
- 2026-04-15 · SDDOT · 02R1 · $58.00 per Ft · qty 54.0 · bid tab
- 2026-04-15 · SDDOT · 02R1 · $123.00 per Ft · qty 100.0 · bid tab
- 2026-04-15 · SDDOT · 02R1 · $113.00 per Ft · qty 54.0 · bid tab
|