PadstakeGet the fee reports
Menu

Site-work prices, Davison County, SD

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTon3$181.50$152.25 to $414.00
Bids
  • 2026-03-04 · SDDOT · 06WT · $414.00 per Ton · qty 11.6 · bid tab
  • 2025-12-10 · SDDOT · 091U · $181.50 per Ton · qty 191.0 · bid tab
  • 2025-10-01 · SDDOT · 07W7 · $152.25 per Ton · qty 4970.5 · bid tab
concrete pavementEach3$21.90$12.65 to $27.00
Bids
  • 2026-03-04 · SDDOT · 06WT · $21.90 per Each · qty 186.0 · bid tab
  • 2025-12-10 · SDDOT · 091U · $12.65 per Each · qty 1848.0 · bid tab
  • 2025-10-01 · SDDOT · 07W7 · $27.00 per Each · qty 96.0 · bid tab
concrete pavementSqYd2$97.88$86.00 to $109.75
Bids
  • 2025-12-10 · SDDOT · 091U · $109.75 per SqYd · qty 4561.0 · bid tab
  • 2025-10-01 · SDDOT · 07W7 · $86.00 per SqYd · qty 19066.6 · bid tab
curb gutterFt1$40.00$40.00 to $40.00
Bids
  • 2026-03-04 · SDDOT · 06WT · $40.00 per Ft · qty 248.0 · bid tab
excavation embankmentCuYd6$9.32$4.04 to $22.75
Bids
  • 2026-03-04 · SDDOT · 06WT · $4.95 per CuYd · qty 3728.0 · bid tab
  • 2026-03-04 · SDDOT · 06WT · $22.75 per CuYd · qty 2234.0 · bid tab
  • 2025-12-10 · SDDOT · 091U · $19.85 per CuYd · qty 11172.0 · bid tab
  • 2025-12-10 · SDDOT · 091U · $10.25 per CuYd · qty 8786.0 · bid tab
  • 2025-10-01 · SDDOT · 07W7 · $8.40 per CuYd · qty 52097.0 · bid tab
  • 2025-10-01 · SDDOT · 07W7 · $4.04 per CuYd · qty 33217.0 · bid tab
flexible baseTon2$27.21$19.43 to $35.00
Bids
  • 2025-12-10 · SDDOT · 091U · $35.00 per Ton · qty 63.0 · bid tab
  • 2025-10-01 · SDDOT · 07W7 · $19.43 per Ton · qty 8721.8 · bid tab
inlet headwallEach4$380.00$101.00 to $1,850.00
Bids
  • 2026-03-04 · SDDOT · 06WT · $101.00 per Each · qty 29.0 · bid tab
  • 2026-03-04 · SDDOT · 06WT · $360.00 per Each · qty 1.0 · bid tab
  • 2025-12-10 · SDDOT · 091U · $1,850.00 per Each · qty 1.0 · bid tab
  • 2025-12-10 · SDDOT · 091U · $400.00 per Each · qty 1.0 · bid tab
inlet headwallFt1$4.50$4.50 to $4.50
Bids
  • 2026-03-04 · SDDOT · 06WT · $4.50 per Ft · qty 13.0 · bid tab
manholeEach3$788.00$788.00 to $1,690.00
Bids
  • 2026-03-04 · SDDOT · 06WT · $788.00 per Each · qty 4.0 · bid tab
  • 2026-03-04 · SDDOT · 06WT · $1,690.00 per Each · qty 1.0 · bid tab
  • 2026-03-04 · SDDOT · 06WT · $788.00 per Each · qty 11.0 · bid tab
storm pipe 15-inchFt4$31.24$19.95 to $98.70
Bids
  • 2025-10-01 · SDDOT · 07W7 · $19.95 per Ft · qty 1442.0 · bid tab
  • 2025-10-01 · SDDOT · 07W7 · $23.10 per Ft · qty 1442.0 · bid tab
  • 2025-10-01 · SDDOT · 07W7 · $39.38 per Ft · qty 590.0 · bid tab
  • 2025-10-01 · SDDOT · 07W7 · $98.70 per Ft · qty 590.0 · bid tab
storm pipe 18-inchFt6$59.59$40.43 to $94.00
Bids
  • 2026-03-04 · SDDOT · 06WT · $45.00 per Ft · qty 6.0 · bid tab
  • 2026-03-04 · SDDOT · 06WT · $63.00 per Ft · qty 48.0 · bid tab
  • 2026-03-04 · SDDOT · 06WT · $82.00 per Ft · qty 48.0 · bid tab
  • 2026-03-04 · SDDOT · 06WT · $94.00 per Ft · qty 6.0 · bid tab
  • 2025-10-01 · SDDOT · 07W7 · $40.43 per Ft · qty 82.0 · bid tab
  • 2025-10-01 · SDDOT · 07W7 · $56.18 per Ft · qty 82.0 · bid tab
storm pipe 24-inchFt2$61.84$43.89 to $79.80
Bids
  • 2025-10-01 · SDDOT · 07W7 · $79.80 per Ft · qty 232.0 · bid tab
  • 2025-10-01 · SDDOT · 07W7 · $43.89 per Ft · qty 232.0 · bid tab
storm pipe 30-inchFt2$120.50$120.00 to $121.00
Bids
  • 2026-03-04 · SDDOT · 06WT · $120.00 per Ft · qty 28.0 · bid tab
  • 2026-03-04 · SDDOT · 06WT · $121.00 per Ft · qty 28.0 · bid tab
storm pipe 48-inchFt2$166.95$69.30 to $264.60
Bids
  • 2025-10-01 · SDDOT · 07W7 · $69.30 per Ft · qty 60.0 · bid tab
  • 2025-10-01 · SDDOT · 07W7 · $264.60 per Ft · qty 60.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.