Site-work prices, Codington, Hamlin County, SD

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTon8$119.50$7.10 to $1,850.00
Bids
  • 2025-01-22 · SDDOT · 07YW · $150.00 per Ton · qty 315.2 · bid tab
  • 2025-01-22 · SDDOT · 07YW · $89.00 per Ton · qty 15441.7 · bid tab
  • 2025-01-22 · SDDOT · 07YW · $655.00 per Ton · qty 963.3 · bid tab
  • 2025-01-22 · SDDOT · 07YW · $1,850.00 per Ton · qty 49.9 · bid tab
  • 2025-01-22 · SDDOT · 07YW · $605.00 per Ton · qty 1384.1 · bid tab
  • 2025-01-22 · SDDOT · 07YW · $44.70 per Ton · qty 26846.9 · bid tab
  • 2025-01-22 · SDDOT · 07YW · $7.10 per Ton · qty 3303.7 · bid tab
  • 2025-01-22 · SDDOT · 07YW · $55.10 per Ton · qty 1787.7 · bid tab
excavation embankmentCuYd3$12.00$5.10 to $15.00
Bids
  • 2025-01-22 · SDDOT · 07YW · $12.00 per CuYd · qty 10704.0 · bid tab
  • 2025-01-22 · SDDOT · 07YW · $15.00 per CuYd · qty 518.0 · bid tab
  • 2025-01-22 · SDDOT · 07YW · $5.10 per CuYd · qty 7075.0 · bid tab
flexible baseTon1$21.00$21.00 to $21.00
Bids
  • 2025-01-22 · SDDOT · 07YW · $21.00 per Ton · qty 2616.6 · bid tab
lime cement stabilizationTon1$350.00$350.00 to $350.00
Bids
  • 2025-01-22 · SDDOT · 07YW · $350.00 per Ton · qty 273.1 · bid tab
storm pipe 24-inchFt2$98.30$86.60 to $110.00
Bids
  • 2025-01-22 · SDDOT · 07YW · $110.00 per Ft · qty 8.0 · bid tab
  • 2025-01-22 · SDDOT · 07YW · $86.60 per Ft · qty 8.0 · bid tab
storm pipe 42-inchFt2$162.50$130.00 to $195.00
Bids
  • 2025-01-22 · SDDOT · 07YW · $130.00 per Ft · qty 18.0 · bid tab
  • 2025-01-22 · SDDOT · 07YW · $195.00 per Ft · qty 18.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.