Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTon10$194.32$7.69 to $850.00
Bids
  • 2025-03-26 · SDDOT · 05JN · $7.69 per Ton · qty 5612.5 · bid tab
  • 2025-03-26 · SDDOT · 05JN · $320.00 per Ton · qty 612.0 · bid tab
  • 2025-03-26 · SDDOT · 05JN · $201.00 per Ton · qty 3189.2 · bid tab
  • 2025-03-26 · SDDOT · X06P · $335.00 per Ton · qty 16.8 · bid tab
  • 2025-03-19 · SDDOT · 07M9 · $187.64 per Ton · qty 428.0 · bid tab
  • 2024-05-15 · SDDOT · 09J7 · $625.00 per Ton · qty 6.8 · bid tab
  • 2024-02-07 · SDDOT · 0749 · $160.00 per Ton · qty 729.0 · bid tab
  • 2024-02-07 · SDDOT · 08CW · $850.00 per Ton · qty 668.0 · bid tab
  • 2024-02-07 · SDDOT · 08CW · $10.95 per Ton · qty 22688.7 · bid tab
  • 2024-02-07 · SDDOT · 08CW · $55.00 per Ton · qty 11529.2 · bid tab
concrete pavementEach1$12.00$12.00 to $12.00
Bids
  • 2025-03-26 · SDDOT · 05JN · $12.00 per Each · qty 260.0 · bid tab
concrete pavementSqYd1$79.14$79.14 to $79.14
Bids
  • 2025-03-26 · SDDOT · 05JN · $79.14 per SqYd · qty 60488.6 · bid tab
curb gutterFt9$41.22$23.66 to $84.33
Bids
  • 2025-03-26 · SDDOT · 05JN · $41.22 per Ft · qty 47.0 · bid tab
  • 2025-03-26 · SDDOT · 05JN · $23.66 per Ft · qty 2321.0 · bid tab
  • 2025-03-26 · SDDOT · 05JN · $84.33 per Ft · qty 9.0 · bid tab
  • 2025-03-26 · SDDOT · 05JN · $84.33 per Ft · qty 87.0 · bid tab
  • 2025-03-26 · SDDOT · 05JN · $41.22 per Ft · qty 175.0 · bid tab
  • 2025-03-26 · SDDOT · 05JN · $41.22 per Ft · qty 4230.0 · bid tab
  • 2025-03-26 · SDDOT · 05JN · $41.22 per Ft · qty 12614.0 · bid tab
  • 2025-03-26 · SDDOT · X06P · $40.00 per Ft · qty 146.0 · bid tab
  • 2024-02-07 · SDDOT · 0749 · $30.00 per Ft · qty 2107.0 · bid tab
excavation embankmentCuYd9$12.44$3.78 to $203.71
Bids
  • 2025-03-26 · SDDOT · 05JN · $6.87 per CuYd · qty 83962.0 · bid tab
  • 2025-03-26 · SDDOT · 05JN · $13.66 per CuYd · qty 25365.0 · bid tab
  • 2025-03-19 · SDDOT · 07M9 · $12.44 per CuYd · qty 9256.0 · bid tab
  • 2025-03-19 · SDDOT · 07M9 · $203.71 per CuYd · qty 28.0 · bid tab
  • 2025-03-19 · SDDOT · 07M9 · $3.78 per CuYd · qty 1392.0 · bid tab
  • 2024-02-07 · SDDOT · 0749 · $22.00 per CuYd · qty 1115.0 · bid tab
  • 2024-02-07 · SDDOT · 0749 · $11.00 per CuYd · qty 1401.0 · bid tab
  • 2024-02-07 · SDDOT · 08CW · $6.40 per CuYd · qty 65575.0 · bid tab
  • 2024-02-07 · SDDOT · 08CW · $12.50 per CuYd · qty 29787.0 · bid tab
fire hydrantEach1$7,775.00$7,775.00 to $7,775.00
Bids
  • 2025-03-26 · SDDOT · X06P · $7,775.00 per Each · qty 7.0 · bid tab
flexible baseTon8$23.50$6.77 to $150.00
Bids
  • 2025-03-26 · SDDOT · 05JN · $6.77 per Ton · qty 2321.0 · bid tab
  • 2025-03-26 · SDDOT · 05JN · $19.33 per Ton · qty 2778.0 · bid tab
  • 2025-03-26 · SDDOT · X06P · $35.00 per Ton · qty 79.9 · bid tab
  • 2025-03-19 · SDDOT · 07M9 · $38.94 per Ton · qty 424.0 · bid tab
  • 2024-05-15 · SDDOT · 09J7 · $150.00 per Ton · qty 20.0 · bid tab
  • 2024-02-07 · SDDOT · 0749 · $20.00 per Ton · qty 1307.0 · bid tab
  • 2024-02-07 · SDDOT · 08CW · $27.00 per Ton · qty 2861.6 · bid tab
  • 2024-02-07 · SDDOT · 08CW · $8.50 per Ton · qty 22688.7 · bid tab
inlet headwallEach10$3,850.00$100.00 to $26,000.00
Bids
  • 2025-03-26 · SDDOT · 05JN · $7,006.08 per Each · qty 31.0 · bid tab
  • 2025-03-26 · SDDOT · 05JN · $1,601.02 per Each · qty 57.0 · bid tab
  • 2025-03-26 · SDDOT · 05JN · $7,494.00 per Each · qty 36.0 · bid tab
  • 2025-03-26 · SDDOT · 05JN · $26,000.00 per Each · qty 4.0 · bid tab
  • 2025-03-26 · SDDOT · 05JN · $11,344.00 per Each · qty 6.0 · bid tab
  • 2025-03-26 · SDDOT · 05JN · $100.00 per Each · qty 77.0 · bid tab
  • 2024-05-15 · SDDOT · 09J7 · $1,050.00 per Each · qty 2.0 · bid tab
  • 2024-02-07 · SDDOT · 0749 · $200.00 per Each · qty 11.0 · bid tab
  • 2024-02-07 · SDDOT · 0749 · $5,200.00 per Each · qty 7.0 · bid tab
  • 2024-02-07 · SDDOT · 08CW · $2,500.00 per Each · qty 2.0 · bid tab
inlet headwallFt1$3.47$3.47 to $3.47
Bids
  • 2025-03-26 · SDDOT · 05JN · $3.47 per Ft · qty 760.0 · bid tab
lime cement stabilizationAcre1$174.00$174.00 to $174.00
Bids
  • 2025-03-26 · SDDOT · 05JN · $174.00 per Acre · qty 3.5 · bid tab
manholeEach8$1,538.65$839.00 to $29,000.00
Bids
  • 2025-03-26 · SDDOT · 05JN · $1,089.00 per Each · qty 3.0 · bid tab
  • 2025-03-26 · SDDOT · 05JN · $1,469.00 per Each · qty 2.0 · bid tab
  • 2025-03-26 · SDDOT · 05JN · $29,000.00 per Each · qty 1.0 · bid tab
  • 2025-03-26 · SDDOT · 05JN · $839.00 per Each · qty 36.0 · bid tab
  • 2025-03-26 · SDDOT · X06P · $7,800.00 per Each · qty 7.0 · bid tab
  • 2025-03-19 · SDDOT · 07M9 · $1,608.31 per Each · qty 1.0 · bid tab
  • 2024-02-07 · SDDOT · 0749 · $1,000.00 per Each · qty 1.0 · bid tab
  • 2024-02-07 · SDDOT · 0749 · $5,800.00 per Each · qty 1.0 · bid tab
sewer main 10-inchFt1$110.00$110.00 to $110.00
Bids
  • 2025-03-26 · SDDOT · X06P · $110.00 per Ft · qty 59.0 · bid tab
sewer main 12-inchFt1$145.00$145.00 to $145.00
Bids
  • 2025-03-26 · SDDOT · X06P · $145.00 per Ft · qty 10.0 · bid tab
sewer main 15-inchFt1$225.00$225.00 to $225.00
Bids
  • 2025-03-26 · SDDOT · X06P · $225.00 per Ft · qty 122.0 · bid tab
sewer main 8-inchFt2$82.50$75.00 to $90.00
Bids
  • 2025-03-26 · SDDOT · X06P · $75.00 per Ft · qty 196.0 · bid tab
  • 2025-03-26 · SDDOT · X06P · $90.00 per Ft · qty 300.0 · bid tab
sewer main (diameter not stated)Ft1$4.50$4.50 to $4.50
Bids
  • 2025-03-26 · SDDOT · X06P · $4.50 per Ft · qty 687.0 · bid tab
sewer serviceEach1$550.00$550.00 to $550.00
Bids
  • 2025-03-26 · SDDOT · X06P · $550.00 per Each · qty 2.0 · bid tab
sewer serviceFt1$55.00$55.00 to $55.00
Bids
  • 2025-03-26 · SDDOT · X06P · $55.00 per Ft · qty 109.0 · bid tab
storm pipe 18-inchFt14$37.37$26.00 to $95.00
Bids
  • 2025-03-26 · SDDOT · 05JN · $31.47 per Ft · qty 3984.0 · bid tab
  • 2025-03-26 · SDDOT · 05JN · $67.94 per Ft · qty 556.0 · bid tab
  • 2025-03-26 · SDDOT · 05JN · $48.04 per Ft · qty 556.0 · bid tab
  • 2025-03-26 · SDDOT · 05JN · $48.39 per Ft · qty 3984.0 · bid tab
  • 2025-03-19 · SDDOT · 07M9 · $38.74 per Ft · qty 162.0 · bid tab
  • 2025-03-19 · SDDOT · 07M9 · $48.64 per Ft · qty 162.0 · bid tab
  • 2024-02-07 · SDDOT · 0749 · $33.00 per Ft · qty 106.0 · bid tab
  • 2024-02-07 · SDDOT · 0749 · $62.00 per Ft · qty 106.0 · bid tab
  • 2024-02-07 · SDDOT · 08CW · $36.00 per Ft · qty 126.0 · bid tab
  • 2024-02-07 · SDDOT · 08CW · $30.00 per Ft · qty 68.0 · bid tab
(10 most recent of 14 shown; all in the Hubstake feed)
storm pipe 24-inchFt12$58.27$33.00 to $275.00
Bids
  • 2025-03-26 · SDDOT · 05JN · $66.32 per Ft · qty 280.0 · bid tab
  • 2025-03-26 · SDDOT · 05JN · $70.01 per Ft · qty 280.0 · bid tab
  • 2025-03-26 · SDDOT · 05JN · $45.21 per Ft · qty 576.0 · bid tab
  • 2025-03-26 · SDDOT · 05JN · $54.03 per Ft · qty 576.0 · bid tab
  • 2025-03-19 · SDDOT · 07M9 · $46.49 per Ft · qty 158.0 · bid tab
  • 2025-03-19 · SDDOT · 07M9 · $62.50 per Ft · qty 158.0 · bid tab
  • 2024-02-07 · SDDOT · 0749 · $65.00 per Ft · qty 22.0 · bid tab
  • 2024-02-07 · SDDOT · 0749 · $33.00 per Ft · qty 22.0 · bid tab
  • 2024-02-07 · SDDOT · 0749 · $45.00 per Ft · qty 68.0 · bid tab
  • 2024-02-07 · SDDOT · 0749 · $66.00 per Ft · qty 68.0 · bid tab
(10 most recent of 12 shown; all in the Hubstake feed)
storm pipe 30-inchFt6$86.50$55.47 to $285.00
Bids
  • 2025-03-26 · SDDOT · 05JN · $55.47 per Ft · qty 1382.0 · bid tab
  • 2025-03-26 · SDDOT · 05JN · $60.47 per Ft · qty 1382.0 · bid tab
  • 2024-02-07 · SDDOT · 08CW · $78.00 per Ft · qty 130.0 · bid tab
  • 2024-02-07 · SDDOT · 08CW · $270.00 per Ft · qty 164.0 · bid tab
  • 2024-02-07 · SDDOT · 08CW · $285.00 per Ft · qty 130.0 · bid tab
  • 2024-02-07 · SDDOT · 08CW · $95.00 per Ft · qty 164.0 · bid tab
storm pipe 36-inchFt2$88.14$80.41 to $95.87
Bids
  • 2025-03-26 · SDDOT · 05JN · $80.41 per Ft · qty 1394.0 · bid tab
  • 2025-03-26 · SDDOT · 05JN · $95.87 per Ft · qty 1394.0 · bid tab
storm pipe 42-inchFt2$138.05$103.00 to $173.10
Bids
  • 2025-03-26 · SDDOT · 05JN · $173.10 per Ft · qty 704.0 · bid tab
  • 2025-03-26 · SDDOT · 05JN · $103.00 per Ft · qty 704.0 · bid tab
storm pipe 48-inchFt2$159.66$128.11 to $191.21
Bids
  • 2025-03-26 · SDDOT · 05JN · $128.11 per Ft · qty 2730.0 · bid tab
  • 2025-03-26 · SDDOT · 05JN · $191.21 per Ft · qty 2730.0 · bid tab
water main 4-inchFt1$78.00$78.00 to $78.00
Bids
  • 2025-03-26 · SDDOT · X06P · $78.00 per Ft · qty 11.0 · bid tab
water main 6-inchFt2$73.50$64.00 to $83.00
Bids
  • 2025-03-26 · SDDOT · X06P · $83.00 per Ft · qty 1628.0 · bid tab
  • 2025-03-26 · SDDOT · X06P · $64.00 per Ft · qty 3185.0 · bid tab
water main 8-inchFt2$110.00$110.00 to $110.00
Bids
  • 2025-03-26 · SDDOT · X06P · $110.00 per Ft · qty 143.0 · bid tab
  • 2025-03-26 · SDDOT · X06P · $110.00 per Ft · qty 23.0 · bid tab
water serviceEach1$1,100.00$1,100.00 to $1,100.00
Bids
  • 2025-03-26 · SDDOT · X06P · $1,100.00 per Each · qty 23.0 · bid tab