Site-work prices, Campbell, Edmunds, Mcpherson, Potter County, SD
Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.
| Category | Unit | Winning items | Median | Range | Receipts |
|---|---|---|---|---|---|
| excavation embankment | CuYd | 1 | $22.75 | $22.75 to $22.75 | Bids
|
| flexible base | Ton | 1 | $29.25 | $29.25 to $29.25 | Bids
|
| storm pipe 18-inch | Ft | 2 | $80.00 | $55.00 to $105.00 | |
| storm pipe 24-inch | Ft | 2 | $55.50 | $41.00 to $70.00 | |
| storm pipe 30-inch | Ft | 2 | $70.00 | $55.00 to $85.00 |
Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.