Site-work prices, Brookings County, SD

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTon9$170.00$0.10 to $605.00
Bids
  • 2025-09-03 · SDDOT · 0A3L · $450.00 per Ton · qty 37.2 · bid tab
  • 2025-03-19 · SDDOT · 09FX · $220.00 per Ton · qty 63.0 · bid tab
  • 2025-03-05 · SDDOT · 05EX · $40.00 per Ton · qty 28563.5 · bid tab
  • 2025-03-05 · SDDOT · 05EX · $170.00 per Ton · qty 446.8 · bid tab
  • 2025-03-05 · SDDOT · 05EX · $0.10 per Ton · qty 36114.5 · bid tab
  • 2025-03-05 · SDDOT · 05EX · $50.00 per Ton · qty 880.9 · bid tab
  • 2025-03-05 · SDDOT · 05EX · $605.00 per Ton · qty 1460.9 · bid tab
  • 2025-03-05 · SDDOT · 05EX · $8.00 per Ton · qty 1306.1 · bid tab
  • 2024-02-07 · SDDOT · 08MJ · $183.00 per Ton · qty 480.8 · bid tab
concrete pavementEach1$18.00$18.00 to $18.00
Bids
  • 2025-03-19 · SDDOT · 09FX · $18.00 per Each · qty 121.0 · bid tab
concrete pavementSqYd2$113.50$99.00 to $128.00
Bids
  • 2025-09-03 · SDDOT · 0A3L · $99.00 per SqYd · qty 112.6 · bid tab
  • 2025-09-03 · SDDOT · 0A3L · $128.00 per SqYd · qty 369.2 · bid tab
curb gutterFt2$35.50$26.00 to $45.00
Bids
  • 2025-09-03 · SDDOT · 0A3L · $45.00 per Ft · qty 344.0 · bid tab
  • 2025-03-19 · SDDOT · 09FX · $26.00 per Ft · qty 444.0 · bid tab
excavation embankmentCuYd9$13.42$3.21 to $59.00
Bids
  • 2025-09-03 · SDDOT · 0A3L · $59.00 per CuYd · qty 614.0 · bid tab
  • 2025-09-03 · SDDOT · 0A3L · $30.00 per CuYd · qty 590.0 · bid tab
  • 2025-03-19 · SDDOT · 09FX · $10.54 per CuYd · qty 932.0 · bid tab
  • 2025-03-05 · SDDOT · 05EX · $15.00 per CuYd · qty 294.0 · bid tab
  • 2025-03-05 · SDDOT · 05EX · $3.21 per CuYd · qty 268237.0 · bid tab
  • 2025-03-05 · SDDOT · 05EX · $4.50 per CuYd · qty 61599.0 · bid tab
  • 2024-02-07 · SDDOT · 084G · $15.25 per CuYd · qty 1283.0 · bid tab
  • 2024-02-07 · SDDOT · 08MJ · $13.42 per CuYd · qty 3179.0 · bid tab
  • 2024-02-07 · SDDOT · 08MJ · $11.90 per CuYd · qty 8929.0 · bid tab
flexible baseTon5$32.00$11.05 to $43.00
Bids
  • 2025-09-03 · SDDOT · 0A3L · $43.00 per Ton · qty 77.6 · bid tab
  • 2025-03-19 · SDDOT · 09FX · $32.00 per Ton · qty 129.3 · bid tab
  • 2025-03-05 · SDDOT · 05EX · $11.05 per Ton · qty 36114.5 · bid tab
  • 2025-03-05 · SDDOT · 05EX · $11.05 per Ton · qty 45276.9 · bid tab
  • 2024-02-07 · SDDOT · 08MJ · $32.15 per Ton · qty 1063.3 · bid tab
inlet headwallEach3$316.00$116.00 to $1,200.00
Bids
  • 2025-09-03 · SDDOT · 0A3L · $316.00 per Each · qty 5.0 · bid tab
  • 2025-09-03 · SDDOT · 0A3L · $116.00 per Each · qty 5.0 · bid tab
  • 2025-03-19 · SDDOT · 09FX · $1,200.00 per Each · qty 2.0 · bid tab
inlet headwallFt1$19.69$19.69 to $19.69
Bids
  • 2025-03-19 · SDDOT · 09FX · $19.69 per Ft · qty 104.0 · bid tab
lime cement stabilizationTon1$335.00$335.00 to $335.00
Bids
  • 2025-03-05 · SDDOT · 05EX · $335.00 per Ton · qty 284.4 · bid tab
manholeEach4$1,491.35$1,265.00 to $5,000.00
Bids
  • 2025-09-03 · SDDOT · 0A3L · $5,000.00 per Each · qty 1.0 · bid tab
  • 2025-09-03 · SDDOT · 0A3L · $1,400.00 per Each · qty 1.0 · bid tab
  • 2025-03-19 · SDDOT · 09FX · $1,265.00 per Each · qty 2.0 · bid tab
  • 2025-03-19 · SDDOT · 09FX · $1,582.70 per Each · qty 1.0 · bid tab
storm pipe 18-inchFt6$35.49$21.00 to $92.00
Bids
  • 2025-09-03 · SDDOT · 0A3L · $36.00 per Ft · qty 104.0 · bid tab
  • 2025-09-03 · SDDOT · 0A3L · $92.00 per Ft · qty 104.0 · bid tab
  • 2025-03-19 · SDDOT · 09FX · $59.13 per Ft · qty 42.0 · bid tab
  • 2025-03-19 · SDDOT · 09FX · $34.98 per Ft · qty 42.0 · bid tab
  • 2025-03-05 · SDDOT · 05EX · $22.00 per Ft · qty 2260.0 · bid tab
  • 2025-03-05 · SDDOT · 05EX · $21.00 per Ft · qty 2260.0 · bid tab
storm pipe 24-inchFt8$56.06$27.00 to $75.00
Bids
  • 2025-03-05 · SDDOT · 05EX · $56.00 per Ft · qty 140.0 · bid tab
  • 2025-03-05 · SDDOT · 05EX · $75.00 per Ft · qty 68.0 · bid tab
  • 2025-03-05 · SDDOT · 05EX · $43.00 per Ft · qty 68.0 · bid tab
  • 2025-03-05 · SDDOT · 05EX · $75.00 per Ft · qty 140.0 · bid tab
  • 2025-03-05 · SDDOT · 05EX · $28.00 per Ft · qty 338.0 · bid tab
  • 2025-03-05 · SDDOT · 05EX · $27.00 per Ft · qty 338.0 · bid tab
  • 2024-02-07 · SDDOT · 08MJ · $56.12 per Ft · qty 70.0 · bid tab
  • 2024-02-07 · SDDOT · 08MJ · $73.20 per Ft · qty 70.0 · bid tab
storm pipe 36-inchFt4$80.00$75.00 to $101.00
Bids
  • 2025-03-05 · SDDOT · 05EX · $75.00 per Ft · qty 336.0 · bid tab
  • 2025-03-05 · SDDOT · 05EX · $80.00 per Ft · qty 168.0 · bid tab
  • 2025-03-05 · SDDOT · 05EX · $101.00 per Ft · qty 168.0 · bid tab
  • 2025-03-05 · SDDOT · 05EX · $80.00 per Ft · qty 336.0 · bid tab
storm pipe 48-inchFt4$104.50$85.00 to $148.00
Bids
  • 2025-03-05 · SDDOT · 05EX · $85.00 per Ft · qty 84.0 · bid tab
  • 2025-03-05 · SDDOT · 05EX · $85.00 per Ft · qty 168.0 · bid tab
  • 2025-03-05 · SDDOT · 05EX · $148.00 per Ft · qty 84.0 · bid tab
  • 2025-03-05 · SDDOT · 05EX · $124.00 per Ft · qty 168.0 · bid tab
storm pipe 60-inchFt2$156.00$90.00 to $222.00
Bids
  • 2025-03-05 · SDDOT · 05EX · $222.00 per Ft · qty 336.0 · bid tab
  • 2025-03-05 · SDDOT · 05EX · $90.00 per Ft · qty 336.0 · bid tab
water main 8-inchFt1$150.00$150.00 to $150.00
Bids
  • 2025-09-03 · SDDOT · 0A3L · $150.00 per Ft · qty 30.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.