Site-work prices, Bon Homme, Hutchinson County, SD
Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.
| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | Ton | 4 | $121.20 | $48.16 to $817.59 | Bids- 2024-03-20 · SDDOT · 06PN · $181.00 per Ton · qty 346.0 · bid tab
- 2024-03-20 · SDDOT · 06PN · $61.40 per Ton · qty 1786.0 · bid tab
- 2024-03-20 · SDDOT · 06PN · $48.16 per Ton · qty 28163.0 · bid tab
- 2024-03-20 · SDDOT · 06PN · $817.59 per Ton · qty 1443.1 · bid tab
|
| excavation embankment | CuYd | 3 | $15.00 | $12.07 to $41.63 | Bids- 2024-03-20 · SDDOT · 06PN · $12.07 per CuYd · qty 1229.0 · bid tab
- 2024-03-20 · SDDOT · 06PN · $41.63 per CuYd · qty 1332.0 · bid tab
- 2024-03-20 · SDDOT · 06PN · $15.00 per CuYd · qty 595.0 · bid tab
|
| flexible base | Ton | 1 | $36.20 | $36.20 to $36.20 | Bids- 2024-03-20 · SDDOT · 06PN · $36.20 per Ton · qty 2624.0 · bid tab
|
| lime cement stabilization | Ton | 1 | $390.96 | $390.96 to $390.96 | Bids- 2024-03-20 · SDDOT · 06PN · $390.96 per Ton · qty 296.6 · bid tab
|
| storm pipe 36-inch | Ft | 2 | $147.81 | $114.63 to $181.00 | Bids- 2024-03-20 · SDDOT · 06PN · $114.63 per Ft · qty 74.0 · bid tab
- 2024-03-20 · SDDOT · 06PN · $181.00 per Ft · qty 74.0 · bid tab
|
| storm pipe 48-inch | Ft | 2 | $241.34 | $241.34 to $241.34 | Bids- 2024-03-20 · SDDOT · 06PN · $241.34 per Ft · qty 62.0 · bid tab
- 2024-03-20 · SDDOT · 06PN · $241.34 per Ft · qty 62.0 · bid tab
|
| storm pipe (diameter not stated) | Ft | 2 | $23.53 | $14.48 to $32.58 | Bids- 2024-03-20 · SDDOT · 06PN · $32.58 per Ft · qty 308.0 · bid tab
- 2024-03-20 · SDDOT · 06PN · $14.48 per Ft · qty 308.0 · bid tab
|
Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.