PadstakeGet the fee reports
Menu

Site-work prices, Bennett, Gregory, Tripp County, SD

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTon4$402.50$75.00 to $700.00
Bids
  • 2024-03-06 · SDDOT · 08RN · $105.00 per Ton · qty 9211.1 · bid tab
  • 2024-03-06 · SDDOT · 08RN · $700.00 per Ton · qty 1986.6 · bid tab
  • 2024-03-06 · SDDOT · 08RN · $75.00 per Ton · qty 32567.9 · bid tab
  • 2024-03-06 · SDDOT · 08RN · $700.00 per Ton · qty 561.9 · bid tab
concrete pavementEach1$25.00$25.00 to $25.00
Bids
  • 2024-03-06 · SDDOT · 08RN · $25.00 per Each · qty 4194.0 · bid tab
concrete pavementFt3$2.35$1.45 to $2.65
Bids
  • 2024-03-06 · SDDOT · 08RN · $2.65 per Ft · qty 34683.0 · bid tab
  • 2024-03-06 · SDDOT · 08RN · $1.45 per Ft · qty 223887.0 · bid tab
  • 2024-03-06 · SDDOT · 08RN · $2.35 per Ft · qty 251474.0 · bid tab
concrete pavementSqYd1$4.95$4.95 to $4.95
Bids
  • 2024-03-06 · SDDOT · 08RN · $4.95 per SqYd · qty 543787.0 · bid tab
excavation embankmentCuYd1$15.00$15.00 to $15.00
Bids
  • 2024-03-06 · SDDOT · 08RN · $15.00 per CuYd · qty 750.0 · bid tab
flexible baseTon1$19.50$19.50 to $19.50
Bids
  • 2024-03-06 · SDDOT · 08RN · $19.50 per Ton · qty 2460.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.