Site-work prices, Newberry, Saluda County, SC
Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.
| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 18 | $85.50 | $68.80 to $718.00 | Bids- 2026-03-10 · SCDOT · 5273760 · $92.50 per TON · qty 7822.935 · bid tab
- 2026-03-10 · SCDOT · 5273760 · $83.00 per TON · qty 4399.174 · bid tab
- 2026-03-10 · SCDOT · 5273760 · $96.00 per TON · qty 3446.08 · bid tab
- 2026-03-10 · SCDOT · 5273760 · $88.00 per TON · qty 22462.787 · bid tab
- 2026-03-10 · SCDOT · 5273760 · $660.00 per TON · qty 2251.624 · bid tab
- 2025-03-11 · SCDOT · 5269890 · $708.00 per TON · qty 2148.978 · bid tab
- 2025-03-11 · SCDOT · 5269890 · $84.00 per TON · qty 5096.801 · bid tab
- 2025-03-11 · SCDOT · 5269890 · $81.50 per TON · qty 17013.852 · bid tab
- 2025-03-11 · SCDOT · 5269890 · $172.00 per TON · qty 25.0 · bid tab
- 2025-03-11 · SCDOT · 5269890 · $165.00 per TON · qty 55.0 · bid tab
(10 most recent of 18 shown; all in the Hubstake feed) |
| curb gutter | LF | 1 | $1.68 | $1.68 to $1.68 | Bids- 2025-03-11 · SCDOT · 5269890 · $1.68 per LF · qty 916.0 · bid tab
|
| excavation embankment | CY | 3 | $38.00 | $38.00 to $59.50 | Bids- 2026-03-10 · SCDOT · 5273760 · $59.50 per CY · qty 11988.0 · bid tab
- 2025-03-11 · SCDOT · 5269890 · $38.00 per CY · qty 6826.0 · bid tab
- 2023-11-14 · SCDOT · 5266150 · $38.00 per CY · qty 2745.6 · bid tab
|
| lime cement stabilization | SY | 1 | $9.75 | $9.75 to $9.75 | Bids- 2026-03-10 · SCDOT · 5273760 · $9.75 per SY · qty 21900.0 · bid tab
|
| lime cement stabilization | TON | 1 | $270.00 | $270.00 to $270.00 | Bids- 2026-03-10 · SCDOT · 5273760 · $270.00 per TON · qty 822.0 · bid tab
|
| sidewalk | SY | 2 | $371.70 | $358.40 to $385.00 | Bids- 2026-03-10 · SCDOT · 5273760 · $385.00 per SY · qty 25.0 · bid tab
- 2025-03-11 · SCDOT · 5269890 · $358.40 per SY · qty 550.0 · bid tab
|
Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.