Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON4$127.43$119.46 to $567.45
Bids
  • 2026-02-10 · SCDOT · 5671010 · $119.46 per TON · qty 2860.0 · bid tab
  • 2026-02-10 · SCDOT · 5671010 · $120.46 per TON · qty 12230.0 · bid tab
  • 2026-02-10 · SCDOT · 5671010 · $567.45 per TON · qty 1317.0 · bid tab
  • 2026-02-10 · SCDOT · 5671010 · $134.40 per TON · qty 7290.0 · bid tab
curb gutterLF2$135.99$60.44 to $211.53
Bids
  • 2026-02-10 · SCDOT · 5671010 · $60.44 per LF · qty 269.0 · bid tab
  • 2026-02-10 · SCDOT · 5671010 · $211.53 per LF · qty 72.0 · bid tab
excavation embankmentCY2$33.59$26.87 to $40.30
Bids
  • 2026-02-10 · SCDOT · 5671010 · $26.87 per CY · qty 8539.0 · bid tab
  • 2026-02-10 · SCDOT · 5671010 · $40.30 per CY · qty 83657.0 · bid tab
excavation embankmentLS1$1.00$1.00 to $1.00
Bids
  • 2026-02-10 · SCDOT · 5671010 · $1.00 per LS · qty 1.0 · bid tab
inlet headwallEA3$6,043.70$4,477.56 to $6,169.09
Bids
  • 2026-02-10 · SCDOT · 5671010 · $4,477.56 per EA · qty 8.0 · bid tab
  • 2026-02-10 · SCDOT · 5671010 · $6,043.70 per EA · qty 2.0 · bid tab
  • 2026-02-10 · SCDOT · 5671010 · $6,169.09 per EA · qty 6.0 · bid tab
lime cement stabilizationLB1$0.41$0.41 to $0.41
Bids
  • 2026-02-10 · SCDOT · 5671010 · $0.41 per LB · qty 10280.0 · bid tab
lime cement stabilizationSY1$41.52$41.52 to $41.52
Bids
  • 2026-02-10 · SCDOT · 5671010 · $41.52 per SY · qty 1100.0 · bid tab
manholeEA1$6,169.09$6,169.09 to $6,169.09
Bids
  • 2026-02-10 · SCDOT · 5671010 · $6,169.09 per EA · qty 2.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.