Site-work prices, Berkeley, Charleston County, SC
Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.
| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 5 | $77.50 | $76.75 to $682.50 | Bids- 2023-11-14 · SCDOT · 5666390 · $85.25 per TON · qty 6850.779 · bid tab
- 2023-11-14 · SCDOT · 5666390 · $76.75 per TON · qty 2307.36 · bid tab
- 2023-11-14 · SCDOT · 5666390 · $77.50 per TON · qty 9515.358 · bid tab
- 2023-11-14 · SCDOT · 5666390 · $682.50 per TON · qty 2644.911 · bid tab
- 2023-11-14 · SCDOT · 5666390 · $77.00 per TON · qty 27478.474 · bid tab
|
| curb gutter | LF | 2 | $20.25 | $2.50 to $38.00 | Bids- 2023-11-14 · SCDOT · 5666390 · $2.50 per LF · qty 106.0 · bid tab
- 2023-11-14 · SCDOT · 5666390 · $38.00 per LF · qty 50.0 · bid tab
|
| excavation embankment | CY | 2 | $47.00 | $44.00 to $50.00 | Bids- 2023-11-14 · SCDOT · 5666390 · $44.00 per CY · qty 578.0 · bid tab
- 2023-11-14 · SCDOT · 5666390 · $50.00 per CY · qty 3409.92 · bid tab
|
| sidewalk | SY | 2 | $53.00 | $48.00 to $58.00 | Bids- 2023-11-14 · SCDOT · 5666390 · $48.00 per SY · qty 1470.15 · bid tab
- 2023-11-14 · SCDOT · 5666390 · $58.00 per SY · qty 344.66 · bid tab
|
Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.