Site-work prices, Abbeville County, SC
Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.
| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 4 | $349.00 | $91.00 to $710.00 | Bids- 2024-09-10 · SCDOT · 0168561 · $710.00 per TON · qty 85.007 · bid tab
- 2024-09-10 · SCDOT · 0168561 · $91.00 per TON · qty 1217.307 · bid tab
- 2023-11-14 · SCDOT · 0150490 · $432.00 per TON · qty 5.0 · bid tab
- 2023-11-14 · SCDOT · 0150490 · $266.00 per TON · qty 73.0 · bid tab
|
| curb gutter | LF | 3 | $50.75 | $24.75 to $61.75 | Bids- 2023-11-14 · SCDOT · 0150490 · $61.75 per LF · qty 12.0 · bid tab
- 2023-11-14 · SCDOT · 0150490 · $50.75 per LF · qty 88.0 · bid tab
- 2023-11-14 · SCDOT · 0150490 · $24.75 per LF · qty 860.0 · bid tab
|
| excavation embankment | CY | 1 | $84.00 | $84.00 to $84.00 | Bids- 2024-09-10 · SCDOT · 0168561 · $84.00 per CY · qty 148.0 · bid tab
|
| inlet headwall | EA | 1 | $5,521.00 | $5,521.00 to $5,521.00 | Bids- 2023-11-14 · SCDOT · 0150490 · $5,521.00 per EA · qty 2.0 · bid tab
|
| lime cement stabilization | SY | 1 | $5.50 | $5.50 to $5.50 | Bids- 2023-11-14 · SCDOT · 0150490 · $5.50 per SY · qty 550.0 · bid tab
|
| manhole | EA | 1 | $5,947.00 | $5,947.00 to $5,947.00 | Bids- 2023-11-14 · SCDOT · 0150490 · $5,947.00 per EA · qty 2.0 · bid tab
|
| sidewalk | SY | 3 | $93.50 | $60.50 to $125.75 | Bids- 2023-11-14 · SCDOT · 0150490 · $60.50 per SY · qty 370.0 · bid tab
- 2023-11-14 · SCDOT · 0150490 · $93.50 per SY · qty 170.0 · bid tab
- 2023-11-14 · SCDOT · 0150490 · $125.75 per SY · qty 100.0 · bid tab
|
Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.