| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 12 | $349.50 | $52.00 to $750.00 | Bids- 2026-04-10 · NDDOT · HES-7-804(077)340 · $720.00 per TON · qty 126.0 · bid tab
- 2026-04-10 · NDDOT · HES-7-804(077)340 · $122.00 per TON · qty 2091.0 · bid tab
- 2026-02-27 · NDDOT · NH-7-002(172)053 · $335.00 per TON · qty 142.0 · bid tab
- 2025-07-18 · NDDOT · HES-7-804(075)330 · $750.00 per TON · qty 248.0 · bid tab
- 2025-07-18 · NDDOT · HES-7-804(075)330 · $99.75 per TON · qty 4116.0 · bid tab
- 2025-05-09 · NDDOT · BRP-BRC-5300(018) · $364.00 per TON · qty 382.0 · bid tab
- 2025-01-10 · NDDOT · NHU-SU-CPU-7-002(178)019 · $190.00 per TON · qty 2275.0 · bid tab
- 2024-12-20 · NDDOT · SU-7-993(061) · $124.00 per TON · qty 1305.0 · bid tab
- 2024-12-20 · NDDOT · SU-7-993(061) · $500.00 per TON · qty 78.0 · bid tab
- 2024-10-11 · NDDOT · TAC-0053(084) · $440.00 per TON · qty 20.0 · bid tab
(10 most recent of 12 shown; all in the Hubstake feed) |
| concrete pavement | SY | 5 | $95.51 | $4.25 to $169.50 | Bids- 2026-06-12 · NDDOT · NH-7-002(193)012 · $5.78 per SY · qty 83691.0 · bid tab
- 2026-05-15 · NDDOT · NH-7-002(195)022 · $4.25 per SY · qty 76778.0 · bid tab
- 2025-07-18 · NDDOT · HES-7-804(075)330 · $169.50 per SY · qty 227.0 · bid tab
- 2025-01-10 · NDDOT · NHU-SU-CPU-7-002(178)019 · $112.00 per SY · qty 61855.0 · bid tab
- 2024-02-16 · NDDOT · HEN-7-002(176)000 · $95.51 per SY · qty 19962.0 · bid tab
|
| curb gutter | LF | 13 | $70.00 | $14.14 to $90.00 | Bids- 2026-02-27 · NDDOT · NH-7-002(172)053 · $85.85 per LF · qty 75.0 · bid tab
- 2026-02-27 · NDDOT · NH-7-002(172)053 · $85.85 per LF · qty 18.0 · bid tab
- 2026-02-06 · NDDOT · TAU-7-993(062) · $59.35 per LF · qty 99.0 · bid tab
- 2025-01-10 · NDDOT · NHU-SU-CPU-7-002(178)019 · $45.00 per LF · qty 14675.0 · bid tab
- 2025-01-10 · NDDOT · NHU-SU-CPU-7-002(178)019 · $90.00 per LF · qty 50.0 · bid tab
- 2025-01-10 · NDDOT · NHU-SU-CPU-7-002(178)019 · $75.00 per LF · qty 164.0 · bid tab
- 2024-12-20 · NDDOT · SU-7-993(061) · $70.00 per LF · qty 420.0 · bid tab
- 2024-10-11 · NDDOT · TAC-0053(084) · $86.51 per LF · qty 14.0 · bid tab
- 2024-10-11 · NDDOT · TAC-0053(084) · $59.61 per LF · qty 129.0 · bid tab
- 2024-10-11 · NDDOT · TAC-0053(084) · $14.14 per LF · qty 50.0 · bid tab
(10 most recent of 13 shown; all in the Hubstake feed) |
| excavation embankment | CY | 21 | $22.00 | $3.98 to $175.00 | Bids- 2026-04-10 · NDDOT · HES-7-804(077)340 · $36.00 per CY · qty 1505.0 · bid tab
- 2026-04-10 · NDDOT · HES-7-804(077)340 · $29.00 per CY · qty 2261.0 · bid tab
- 2026-02-06 · NDDOT · TAU-7-993(062) · $19.36 per CY · qty 888.0 · bid tab
- 2025-07-18 · NDDOT · HES-7-804(075)330 · $34.90 per CY · qty 782.0 · bid tab
- 2025-07-18 · NDDOT · HES-7-804(075)330 · $12.35 per CY · qty 3347.0 · bid tab
- 2025-05-09 · NDDOT · BRP-BRC-5300(018) · $18.00 per CY · qty 200.0 · bid tab
- 2025-05-09 · NDDOT · BRP-BRC-5300(018) · $12.00 per CY · qty 1518.0 · bid tab
- 2025-05-09 · NDDOT · BRP-BRC-5300(018) · $9.60 per CY · qty 1045.0 · bid tab
- 2025-05-09 · NDDOT · BRP-BRC-5300(018) · $26.19 per CY · qty 1468.0 · bid tab
- 2025-02-07 · NDDOT · BRJ-0053(079) · $22.00 per CY · qty 178.0 · bid tab
(10 most recent of 21 shown; all in the Hubstake feed) |
| flexible base | CY | 2 | $117.03 | $89.07 to $145.00 | Bids- 2024-12-20 · NDDOT · SU-7-993(061) · $145.00 per CY · qty 67.0 · bid tab
- 2024-10-11 · NDDOT · TAC-0053(084) · $89.07 per CY · qty 394.0 · bid tab
|
| flexible base | TON | 8 | $32.50 | $18.00 to $72.50 | Bids- 2026-04-10 · NDDOT · HES-7-804(077)340 · $32.00 per TON · qty 5904.0 · bid tab
- 2026-02-27 · NDDOT · NH-7-002(172)053 · $72.50 per TON · qty 167.0 · bid tab
- 2026-02-06 · NDDOT · TAU-7-993(062) · $58.45 per TON · qty 450.0 · bid tab
- 2025-07-18 · NDDOT · HES-7-804(075)330 · $27.60 per TON · qty 12151.0 · bid tab
- 2025-05-09 · NDDOT · BRP-BRC-5300(018) · $33.00 per TON · qty 748.0 · bid tab
- 2025-01-10 · NDDOT · NHU-SU-CPU-7-002(178)019 · $18.00 per TON · qty 37154.0 · bid tab
- 2024-02-16 · NDDOT · HEN-7-002(176)000 · $23.13 per TON · qty 28309.0 · bid tab
- 2023-11-17 · NDDOT · TAU-7-993(060) · $48.08 per TON · qty 326.0 · bid tab
|
| inlet headwall | EA | 12 | $4,500.00 | $2,400.00 to $11,700.00 | Bids- 2025-01-10 · NDDOT · NHU-SU-CPU-7-002(178)019 · $4,600.00 per EA · qty 3.0 · bid tab
- 2025-01-10 · NDDOT · NHU-SU-CPU-7-002(178)019 · $4,400.00 per EA · qty 1.0 · bid tab
- 2025-01-10 · NDDOT · NHU-SU-CPU-7-002(178)019 · $2,600.00 per EA · qty 3.0 · bid tab
- 2025-01-10 · NDDOT · NHU-SU-CPU-7-002(178)019 · $4,300.00 per EA · qty 1.0 · bid tab
- 2025-01-10 · NDDOT · NHU-SU-CPU-7-002(178)019 · $7,600.00 per EA · qty 7.0 · bid tab
- 2025-01-10 · NDDOT · NHU-SU-CPU-7-002(178)019 · $8,200.00 per EA · qty 2.0 · bid tab
- 2025-01-10 · NDDOT · NHU-SU-CPU-7-002(178)019 · $2,400.00 per EA · qty 1.0 · bid tab
- 2025-01-10 · NDDOT · NHU-SU-CPU-7-002(178)019 · $4,700.00 per EA · qty 1.0 · bid tab
- 2025-01-10 · NDDOT · NHU-SU-CPU-7-002(178)019 · $11,700.00 per EA · qty 1.0 · bid tab
- 2025-01-10 · NDDOT · NHU-SU-CPU-7-002(178)019 · $5,250.00 per EA · qty 1.0 · bid tab
(10 most recent of 12 shown; all in the Hubstake feed) |
| inlet headwall | L SUM | 1 | $4,950.00 | $4,950.00 to $4,950.00 | Bids- 2024-10-11 · NDDOT · TAC-0053(084) · $4,950.00 per L SUM · qty 1.0 · bid tab
|
| manhole | EA | 7 | $9,500.00 | $2,100.00 to $30,000.00 | Bids- 2025-07-18 · NDDOT · HES-7-804(075)330 · $10,025.26 per EA · qty 1.0 · bid tab
- 2025-01-10 · NDDOT · NHU-SU-CPU-7-002(178)019 · $5,200.00 per EA · qty 1.0 · bid tab
- 2025-01-10 · NDDOT · NHU-SU-CPU-7-002(178)019 · $30,000.00 per EA · qty 1.0 · bid tab
- 2025-01-10 · NDDOT · NHU-SU-CPU-7-002(178)019 · $16,000.00 per EA · qty 4.0 · bid tab
- 2025-01-10 · NDDOT · NHU-SU-CPU-7-002(178)019 · $9,500.00 per EA · qty 1.0 · bid tab
- 2025-01-10 · NDDOT · NHU-SU-CPU-7-002(178)019 · $5,200.00 per EA · qty 8.0 · bid tab
- 2025-01-10 · NDDOT · NHU-SU-CPU-7-002(178)019 · $2,100.00 per EA · qty 5.0 · bid tab
|
| sewer main 15-inch | LF | 1 | $315.00 | $315.00 to $315.00 | Bids- 2025-01-10 · NDDOT · NHU-SU-CPU-7-002(178)019 · $315.00 per LF · qty 1214.0 · bid tab
|
| sidewalk | EA | 4 | $73.27 | $50.00 to $82.50 | Bids- 2026-02-06 · NDDOT · TAU-7-993(062) · $80.53 per EA · qty 4.0 · bid tab
- 2024-12-20 · NDDOT · SU-7-993(061) · $50.00 per EA · qty 28.0 · bid tab
- 2024-10-11 · NDDOT · TAC-0053(084) · $82.50 per EA · qty 4.0 · bid tab
- 2023-11-17 · NDDOT · TAU-7-993(060) · $66.00 per EA · qty 1.0 · bid tab
|
| sidewalk | SY | 9 | $144.42 | $74.59 to $217.38 | Bids- 2026-02-06 · NDDOT · TAU-7-993(062) · $74.59 per SY · qty 1439.0 · bid tab
- 2025-01-10 · NDDOT · NHU-SU-CPU-7-002(178)019 · $90.00 per SY · qty 3772.0 · bid tab
- 2025-01-10 · NDDOT · NHU-SU-CPU-7-002(178)019 · $120.00 per SY · qty 652.0 · bid tab
- 2025-01-10 · NDDOT · NHU-SU-CPU-7-002(178)019 · $160.00 per SY · qty 89.0 · bid tab
- 2024-12-20 · NDDOT · SU-7-993(061) · $180.00 per SY · qty 338.0 · bid tab
- 2024-10-11 · NDDOT · TAC-0053(084) · $217.38 per SY · qty 115.0 · bid tab
- 2024-10-11 · NDDOT · TAC-0053(084) · $144.42 per SY · qty 942.0 · bid tab
- 2023-11-17 · NDDOT · TAU-7-993(060) · $148.93 per SY · qty 22.0 · bid tab
- 2023-11-17 · NDDOT · TAU-7-993(060) · $127.98 per SY · qty 1026.0 · bid tab
|
| storm pipe 24-inch | LF | 3 | $440.00 | $314.78 to $820.25 | Bids- 2025-07-18 · NDDOT · HES-7-804(075)330 · $820.25 per LF · qty 8.0 · bid tab
- 2024-10-11 · NDDOT · TAC-0053(084) · $440.00 per LF · qty 6.0 · bid tab
- 2024-02-16 · NDDOT · HEN-7-002(176)000 · $314.78 per LF · qty 72.0 · bid tab
|
| storm pipe 30-inch | LF | 2 | $511.25 | $397.25 to $625.25 | Bids- 2025-07-18 · NDDOT · HES-7-804(075)330 · $625.25 per LF · qty 10.0 · bid tab
- 2024-02-16 · NDDOT · HEN-7-002(176)000 · $397.25 per LF · qty 116.0 · bid tab
|
| storm pipe 36-inch | LF | 1 | $537.39 | $537.39 to $537.39 | Bids- 2024-02-16 · NDDOT · HEN-7-002(176)000 · $537.39 per LF · qty 12.0 · bid tab
|
| storm pipe 54-inch | LF | 1 | $790.69 | $790.69 to $790.69 | Bids- 2024-02-16 · NDDOT · HEN-7-002(176)000 · $790.69 per LF · qty 20.0 · bid tab
|
| storm pipe (diameter not stated) | LF | 4 | $3,377.50 | $1,260.00 to $4,935.00 | Bids- 2025-05-09 · NDDOT · BRP-BRC-5300(018) · $4,445.00 per LF · qty 52.0 · bid tab
- 2025-02-07 · NDDOT · BRJ-0053(079) · $4,935.00 per LF · qty 55.0 · bid tab
- 2025-01-10 · NDDOT · NHU-SU-CPU-7-002(178)019 · $2,310.00 per LF · qty 62.0 · bid tab
- 2025-01-10 · NDDOT · NHU-SU-CPU-7-002(178)019 · $1,260.00 per LF · qty 62.0 · bid tab
|
| water main 8-inch | LF | 1 | $350.00 | $350.00 to $350.00 | Bids- 2025-01-10 · NDDOT · NHU-SU-CPU-7-002(178)019 · $350.00 per LF · qty 500.0 · bid tab
|
| water service | LF | 1 | $80.00 | $80.00 to $80.00 | Bids- 2025-01-10 · NDDOT · NHU-SU-CPU-7-002(178)019 · $80.00 per LF · qty 86.0 · bid tab
|