Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON13$162.00$31.02 to $892.00
Bids
  • 2026-02-27 · NDDOT · NH-4-083(157)181 · $38.78 per TON · qty 39583.0 · bid tab
  • 2026-02-27 · NDDOT · NH-4-083(157)181 · $580.00 per TON · qty 1781.0 · bid tab
  • 2026-02-27 · NDDOT · TAU-4-989(137) · $220.00 per TON · qty 180.0 · bid tab
  • 2025-05-09 · NDDOT · SC-5132(061) · $50.00 per TON · qty 72276.0 · bid tab
  • 2025-05-09 · NDDOT · SC-5132(061) · $500.00 per TON · qty 3614.0 · bid tab
  • 2025-04-11 · NDDOT · NH-CPU-4-083(142)198 · $727.00 per TON · qty 66.8 · bid tab
  • 2025-04-11 · NDDOT · NH-CPU-4-083(142)198 · $119.00 per TON · qty 430.0 · bid tab
  • 2025-04-11 · NDDOT · NH-CPU-4-083(142)198 · $89.00 per TON · qty 1113.0 · bid tab
  • 2025-03-21 · NDDOT · TAU-4-989(131) · $232.62 per TON · qty 160.0 · bid tab
  • 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $162.00 per TON · qty 864.0 · bid tab
(10 most recent of 13 shown; all in the Hubstake feed)
concrete pavementSY2$114.50$112.00 to $117.00
Bids
  • 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $112.00 per SY · qty 20923.0 · bid tab
  • 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $117.00 per SY · qty 1369.0 · bid tab
curb gutterLF10$63.50$3.10 to $107.00
Bids
  • 2026-02-27 · NDDOT · TAU-4-989(137) · $62.00 per LF · qty 813.0 · bid tab
  • 2026-02-27 · NDDOT · TAU-4-989(137) · $48.38 per LF · qty 176.0 · bid tab
  • 2025-04-11 · NDDOT · NH-CPU-4-083(142)198 · $72.16 per LF · qty 1632.0 · bid tab
  • 2025-04-11 · NDDOT · NH-CPU-4-083(142)198 · $3.10 per LF · qty 1580.0 · bid tab
  • 2025-03-21 · NDDOT · TAU-4-989(131) · $107.00 per LF · qty 228.0 · bid tab
  • 2025-03-21 · NDDOT · TAU-4-989(131) · $61.25 per LF · qty 1300.0 · bid tab
  • 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $49.70 per LF · qty 6552.0 · bid tab
  • 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $74.10 per LF · qty 70.0 · bid tab
  • 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $67.30 per LF · qty 591.0 · bid tab
  • 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $65.00 per LF · qty 685.0 · bid tab
excavation embankmentCY9$28.73$7.00 to $80.04
Bids
  • 2026-02-27 · NDDOT · TAU-4-989(137) · $80.04 per CY · qty 376.0 · bid tab
  • 2025-04-11 · NDDOT · NH-CPU-4-083(142)198 · $55.00 per CY · qty 1212.0 · bid tab
  • 2025-04-11 · NDDOT · NH-CPU-4-083(142)198 · $20.00 per CY · qty 3297.0 · bid tab
  • 2025-04-11 · NDDOT · NH-CPU-4-083(142)198 · $50.00 per CY · qty 10801.0 · bid tab
  • 2025-03-21 · NDDOT · TAU-4-989(131) · $51.50 per CY · qty 338.0 · bid tab
  • 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $7.00 per CY · qty 63822.0 · bid tab
  • 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $12.50 per CY · qty 2500.0 · bid tab
  • 2025-02-07 · NDDOT · BRJ-0051(057) · $28.73 per CY · qty 14.0 · bid tab
  • 2025-02-07 · NDDOT · BRJ-0051(057) · $14.89 per CY · qty 1731.0 · bid tab
fire hydrantEA1$9,270.00$9,270.00 to $9,270.00
Bids
  • 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $9,270.00 per EA · qty 4.0 · bid tab
flexible baseCY2$54.85$52.00 to $57.70
Bids
  • 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $57.70 per CY · qty 14244.0 · bid tab
  • 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $52.00 per CY · qty 84.0 · bid tab
flexible baseTON4$45.14$32.00 to $60.00
Bids
  • 2026-02-27 · NDDOT · TAU-4-989(137) · $56.03 per TON · qty 1143.0 · bid tab
  • 2025-05-09 · NDDOT · SC-5132(061) · $60.00 per TON · qty 675.0 · bid tab
  • 2025-04-11 · NDDOT · NH-CPU-4-083(142)198 · $32.00 per TON · qty 4846.0 · bid tab
  • 2025-03-21 · NDDOT · TAU-4-989(131) · $34.25 per TON · qty 831.0 · bid tab
inlet headwallEA10$7,827.50$2,506.00 to $159,000.00
Bids
  • 2025-04-11 · NDDOT · NH-CPU-4-083(142)198 · $7,675.00 per EA · qty 1.0 · bid tab
  • 2025-03-21 · NDDOT · TAU-4-989(131) · $3,050.50 per EA · qty 3.0 · bid tab
  • 2025-03-21 · NDDOT · TAU-4-989(131) · $2,506.00 per EA · qty 1.0 · bid tab
  • 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $6,940.00 per EA · qty 1.0 · bid tab
  • 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $4,870.00 per EA · qty 21.0 · bid tab
  • 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $7,980.00 per EA · qty 22.0 · bid tab
  • 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $41,200.00 per EA · qty 3.0 · bid tab
  • 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $13,700.00 per EA · qty 3.0 · bid tab
  • 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $18,400.00 per EA · qty 3.0 · bid tab
  • 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $159,000.00 per EA · qty 1.0 · bid tab
inlet headwallLF1$119.00$119.00 to $119.00
Bids
  • 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $119.00 per LF · qty 115.0 · bid tab
lime cement stabilizationEA2$3,245.00$1,390.00 to $5,100.00
Bids
  • 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $5,100.00 per EA · qty 4.0 · bid tab
  • 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $1,390.00 per EA · qty 4.0 · bid tab
lime cement stabilizationSY1$3.00$3.00 to $3.00
Bids
  • 2025-05-09 · NDDOT · SC-5132(061) · $3.00 per SY · qty 123605.0 · bid tab
manholeEA7$13,200.00$5,800.00 to $34,400.00
Bids
  • 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $34,400.00 per EA · qty 1.0 · bid tab
  • 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $5,800.00 per EA · qty 1.0 · bid tab
  • 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $13,200.00 per EA · qty 5.0 · bid tab
  • 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $21,500.00 per EA · qty 1.0 · bid tab
  • 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $30,800.00 per EA · qty 2.0 · bid tab
  • 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $9,060.00 per EA · qty 2.0 · bid tab
  • 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $11,100.00 per EA · qty 7.0 · bid tab
sidewalkEA1$74.00$74.00 to $74.00
Bids
  • 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $74.00 per EA · qty 8.0 · bid tab
sidewalkLF2$16.32$14.50 to $18.15
Bids
  • 2026-02-27 · NDDOT · TAU-4-989(137) · $18.15 per LF · qty 300.0 · bid tab
  • 2025-03-21 · NDDOT · TAU-4-989(131) · $14.50 per LF · qty 298.0 · bid tab
sidewalkSY9$140.00$94.60 to $154.00
Bids
  • 2026-02-27 · NDDOT · TAU-4-989(137) · $142.39 per SY · qty 1454.0 · bid tab
  • 2026-02-27 · NDDOT · TAU-4-989(137) · $142.39 per SY · qty 589.0 · bid tab
  • 2026-02-27 · NDDOT · TAU-4-989(137) · $94.60 per SY · qty 1600.0 · bid tab
  • 2025-03-21 · NDDOT · TAU-4-989(131) · $122.50 per SY · qty 436.0 · bid tab
  • 2025-03-21 · NDDOT · TAU-4-989(131) · $148.00 per SY · qty 528.0 · bid tab
  • 2025-03-21 · NDDOT · TAU-4-989(131) · $110.50 per SY · qty 1453.0 · bid tab
  • 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $154.00 per SY · qty 288.0 · bid tab
  • 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $94.90 per SY · qty 3151.0 · bid tab
  • 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $140.00 per SY · qty 268.0 · bid tab
storm pipe 15-inchLF1$88.10$88.10 to $88.10
Bids
  • 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $88.10 per LF · qty 1011.0 · bid tab
storm pipe 18-inchLF1$104.00$104.00 to $104.00
Bids
  • 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $104.00 per LF · qty 593.0 · bid tab
storm pipe 24-inchLF1$140.00$140.00 to $140.00
Bids
  • 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $140.00 per LF · qty 1010.0 · bid tab
storm pipe 30-inchLF1$197.00$197.00 to $197.00
Bids
  • 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $197.00 per LF · qty 1486.0 · bid tab
storm pipe 36-inchLF1$269.00$269.00 to $269.00
Bids
  • 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $269.00 per LF · qty 466.0 · bid tab
storm pipe 48-inchLF1$425.00$425.00 to $425.00
Bids
  • 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $425.00 per LF · qty 281.0 · bid tab
storm pipe 54-inchLF1$580.00$580.00 to $580.00
Bids
  • 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $580.00 per LF · qty 20.0 · bid tab
storm pipe 58-inchLF1$684.00$684.00 to $684.00
Bids
  • 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $684.00 per LF · qty 149.0 · bid tab
storm pipe 60-inchLF1$715.00$715.00 to $715.00
Bids
  • 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $715.00 per LF · qty 137.0 · bid tab
storm pipe 72-inchLF2$943.81$837.62 to $1,050.00
Bids
  • 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $1,050.00 per LF · qty 62.0 · bid tab
  • 2025-02-07 · NDDOT · BRJ-0051(057) · $837.62 per LF · qty 372.0 · bid tab
storm pipe (diameter not stated)LF1$2,515.00$2,515.00 to $2,515.00
Bids
  • 2025-04-11 · NDDOT · NH-CPU-4-083(142)198 · $2,515.00 per LF · qty 228.0 · bid tab
water main 6-inchLF1$130.00$130.00 to $130.00
Bids
  • 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $130.00 per LF · qty 111.0 · bid tab
water main 8-inchLF1$104.00$104.00 to $104.00
Bids
  • 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $104.00 per LF · qty 42.0 · bid tab