| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 13 | $162.00 | $31.02 to $892.00 | Bids- 2026-02-27 · NDDOT · NH-4-083(157)181 · $38.78 per TON · qty 39583.0 · bid tab
- 2026-02-27 · NDDOT · NH-4-083(157)181 · $580.00 per TON · qty 1781.0 · bid tab
- 2026-02-27 · NDDOT · TAU-4-989(137) · $220.00 per TON · qty 180.0 · bid tab
- 2025-05-09 · NDDOT · SC-5132(061) · $50.00 per TON · qty 72276.0 · bid tab
- 2025-05-09 · NDDOT · SC-5132(061) · $500.00 per TON · qty 3614.0 · bid tab
- 2025-04-11 · NDDOT · NH-CPU-4-083(142)198 · $727.00 per TON · qty 66.8 · bid tab
- 2025-04-11 · NDDOT · NH-CPU-4-083(142)198 · $119.00 per TON · qty 430.0 · bid tab
- 2025-04-11 · NDDOT · NH-CPU-4-083(142)198 · $89.00 per TON · qty 1113.0 · bid tab
- 2025-03-21 · NDDOT · TAU-4-989(131) · $232.62 per TON · qty 160.0 · bid tab
- 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $162.00 per TON · qty 864.0 · bid tab
(10 most recent of 13 shown; all in the Hubstake feed) |
| concrete pavement | SY | 2 | $114.50 | $112.00 to $117.00 | Bids- 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $112.00 per SY · qty 20923.0 · bid tab
- 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $117.00 per SY · qty 1369.0 · bid tab
|
| curb gutter | LF | 10 | $63.50 | $3.10 to $107.00 | Bids- 2026-02-27 · NDDOT · TAU-4-989(137) · $62.00 per LF · qty 813.0 · bid tab
- 2026-02-27 · NDDOT · TAU-4-989(137) · $48.38 per LF · qty 176.0 · bid tab
- 2025-04-11 · NDDOT · NH-CPU-4-083(142)198 · $72.16 per LF · qty 1632.0 · bid tab
- 2025-04-11 · NDDOT · NH-CPU-4-083(142)198 · $3.10 per LF · qty 1580.0 · bid tab
- 2025-03-21 · NDDOT · TAU-4-989(131) · $107.00 per LF · qty 228.0 · bid tab
- 2025-03-21 · NDDOT · TAU-4-989(131) · $61.25 per LF · qty 1300.0 · bid tab
- 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $49.70 per LF · qty 6552.0 · bid tab
- 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $74.10 per LF · qty 70.0 · bid tab
- 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $67.30 per LF · qty 591.0 · bid tab
- 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $65.00 per LF · qty 685.0 · bid tab
|
| excavation embankment | CY | 9 | $28.73 | $7.00 to $80.04 | Bids- 2026-02-27 · NDDOT · TAU-4-989(137) · $80.04 per CY · qty 376.0 · bid tab
- 2025-04-11 · NDDOT · NH-CPU-4-083(142)198 · $55.00 per CY · qty 1212.0 · bid tab
- 2025-04-11 · NDDOT · NH-CPU-4-083(142)198 · $20.00 per CY · qty 3297.0 · bid tab
- 2025-04-11 · NDDOT · NH-CPU-4-083(142)198 · $50.00 per CY · qty 10801.0 · bid tab
- 2025-03-21 · NDDOT · TAU-4-989(131) · $51.50 per CY · qty 338.0 · bid tab
- 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $7.00 per CY · qty 63822.0 · bid tab
- 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $12.50 per CY · qty 2500.0 · bid tab
- 2025-02-07 · NDDOT · BRJ-0051(057) · $28.73 per CY · qty 14.0 · bid tab
- 2025-02-07 · NDDOT · BRJ-0051(057) · $14.89 per CY · qty 1731.0 · bid tab
|
| fire hydrant | EA | 1 | $9,270.00 | $9,270.00 to $9,270.00 | Bids- 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $9,270.00 per EA · qty 4.0 · bid tab
|
| flexible base | CY | 2 | $54.85 | $52.00 to $57.70 | Bids- 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $57.70 per CY · qty 14244.0 · bid tab
- 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $52.00 per CY · qty 84.0 · bid tab
|
| flexible base | TON | 4 | $45.14 | $32.00 to $60.00 | Bids- 2026-02-27 · NDDOT · TAU-4-989(137) · $56.03 per TON · qty 1143.0 · bid tab
- 2025-05-09 · NDDOT · SC-5132(061) · $60.00 per TON · qty 675.0 · bid tab
- 2025-04-11 · NDDOT · NH-CPU-4-083(142)198 · $32.00 per TON · qty 4846.0 · bid tab
- 2025-03-21 · NDDOT · TAU-4-989(131) · $34.25 per TON · qty 831.0 · bid tab
|
| inlet headwall | EA | 10 | $7,827.50 | $2,506.00 to $159,000.00 | Bids- 2025-04-11 · NDDOT · NH-CPU-4-083(142)198 · $7,675.00 per EA · qty 1.0 · bid tab
- 2025-03-21 · NDDOT · TAU-4-989(131) · $3,050.50 per EA · qty 3.0 · bid tab
- 2025-03-21 · NDDOT · TAU-4-989(131) · $2,506.00 per EA · qty 1.0 · bid tab
- 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $6,940.00 per EA · qty 1.0 · bid tab
- 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $4,870.00 per EA · qty 21.0 · bid tab
- 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $7,980.00 per EA · qty 22.0 · bid tab
- 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $41,200.00 per EA · qty 3.0 · bid tab
- 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $13,700.00 per EA · qty 3.0 · bid tab
- 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $18,400.00 per EA · qty 3.0 · bid tab
- 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $159,000.00 per EA · qty 1.0 · bid tab
|
| inlet headwall | LF | 1 | $119.00 | $119.00 to $119.00 | Bids- 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $119.00 per LF · qty 115.0 · bid tab
|
| lime cement stabilization | EA | 2 | $3,245.00 | $1,390.00 to $5,100.00 | Bids- 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $5,100.00 per EA · qty 4.0 · bid tab
- 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $1,390.00 per EA · qty 4.0 · bid tab
|
| lime cement stabilization | SY | 1 | $3.00 | $3.00 to $3.00 | Bids- 2025-05-09 · NDDOT · SC-5132(061) · $3.00 per SY · qty 123605.0 · bid tab
|
| manhole | EA | 7 | $13,200.00 | $5,800.00 to $34,400.00 | Bids- 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $34,400.00 per EA · qty 1.0 · bid tab
- 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $5,800.00 per EA · qty 1.0 · bid tab
- 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $13,200.00 per EA · qty 5.0 · bid tab
- 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $21,500.00 per EA · qty 1.0 · bid tab
- 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $30,800.00 per EA · qty 2.0 · bid tab
- 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $9,060.00 per EA · qty 2.0 · bid tab
- 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $11,100.00 per EA · qty 7.0 · bid tab
|
| sidewalk | EA | 1 | $74.00 | $74.00 to $74.00 | Bids- 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $74.00 per EA · qty 8.0 · bid tab
|
| sidewalk | LF | 2 | $16.32 | $14.50 to $18.15 | Bids- 2026-02-27 · NDDOT · TAU-4-989(137) · $18.15 per LF · qty 300.0 · bid tab
- 2025-03-21 · NDDOT · TAU-4-989(131) · $14.50 per LF · qty 298.0 · bid tab
|
| sidewalk | SY | 9 | $140.00 | $94.60 to $154.00 | Bids- 2026-02-27 · NDDOT · TAU-4-989(137) · $142.39 per SY · qty 1454.0 · bid tab
- 2026-02-27 · NDDOT · TAU-4-989(137) · $142.39 per SY · qty 589.0 · bid tab
- 2026-02-27 · NDDOT · TAU-4-989(137) · $94.60 per SY · qty 1600.0 · bid tab
- 2025-03-21 · NDDOT · TAU-4-989(131) · $122.50 per SY · qty 436.0 · bid tab
- 2025-03-21 · NDDOT · TAU-4-989(131) · $148.00 per SY · qty 528.0 · bid tab
- 2025-03-21 · NDDOT · TAU-4-989(131) · $110.50 per SY · qty 1453.0 · bid tab
- 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $154.00 per SY · qty 288.0 · bid tab
- 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $94.90 per SY · qty 3151.0 · bid tab
- 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $140.00 per SY · qty 268.0 · bid tab
|
| storm pipe 15-inch | LF | 1 | $88.10 | $88.10 to $88.10 | Bids- 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $88.10 per LF · qty 1011.0 · bid tab
|
| storm pipe 18-inch | LF | 1 | $104.00 | $104.00 to $104.00 | Bids- 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $104.00 per LF · qty 593.0 · bid tab
|
| storm pipe 24-inch | LF | 1 | $140.00 | $140.00 to $140.00 | Bids- 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $140.00 per LF · qty 1010.0 · bid tab
|
| storm pipe 30-inch | LF | 1 | $197.00 | $197.00 to $197.00 | Bids- 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $197.00 per LF · qty 1486.0 · bid tab
|
| storm pipe 36-inch | LF | 1 | $269.00 | $269.00 to $269.00 | Bids- 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $269.00 per LF · qty 466.0 · bid tab
|
| storm pipe 48-inch | LF | 1 | $425.00 | $425.00 to $425.00 | Bids- 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $425.00 per LF · qty 281.0 · bid tab
|
| storm pipe 54-inch | LF | 1 | $580.00 | $580.00 to $580.00 | Bids- 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $580.00 per LF · qty 20.0 · bid tab
|
| storm pipe 58-inch | LF | 1 | $684.00 | $684.00 to $684.00 | Bids- 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $684.00 per LF · qty 149.0 · bid tab
|
| storm pipe 60-inch | LF | 1 | $715.00 | $715.00 to $715.00 | Bids- 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $715.00 per LF · qty 137.0 · bid tab
|
| storm pipe 72-inch | LF | 2 | $943.81 | $837.62 to $1,050.00 | Bids- 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $1,050.00 per LF · qty 62.0 · bid tab
- 2025-02-07 · NDDOT · BRJ-0051(057) · $837.62 per LF · qty 372.0 · bid tab
|
| storm pipe (diameter not stated) | LF | 1 | $2,515.00 | $2,515.00 to $2,515.00 | Bids- 2025-04-11 · NDDOT · NH-CPU-4-083(142)198 · $2,515.00 per LF · qty 228.0 · bid tab
|
| water main 6-inch | LF | 1 | $130.00 | $130.00 to $130.00 | Bids- 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $130.00 per LF · qty 111.0 · bid tab
|
| water main 8-inch | LF | 1 | $104.00 | $104.00 to $104.00 | Bids- 2025-03-14 · NDDOT · SU-NHU-CRP-4-989(134) · $104.00 per LF · qty 42.0 · bid tab
|