| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 7 | $210.00 | $39.82 to $800.00 | Bids- 2025-03-21 · NDDOT · SS-6-018(090)183 · $39.82 per TON · qty 29487.0 · bid tab
- 2025-03-21 · NDDOT · SS-6-018(090)183 · $400.00 per TON · qty 1549.0 · bid tab
- 2024-08-09 · NDDOT · H-6-018(089)207 · $189.00 per TON · qty 161.0 · bid tab
- 2024-08-09 · NDDOT · H-6-018(089)207 · $800.00 per TON · qty 11.0 · bid tab
- 2023-12-08 · NDDOT · IM-6-029(164)163 · $690.00 per TON · qty 173.5 · bid tab
- 2023-12-08 · NDDOT · IM-6-029(164)163 · $160.00 per TON · qty 2894.0 · bid tab
- 2023-12-08 · NDDOT · IM-6-029(164)163 · $210.00 per TON · qty 200.0 · bid tab
|
| concrete pavement | SY | 2 | $117.78 | $117.37 to $118.20 | Bids- 2026-05-08 · NDDOT · HEC-0050(056) · $117.37 per SY · qty 1313.0 · bid tab
- 2026-05-08 · NDDOT · HEC-0050(056) · $118.20 per SY · qty 452.0 · bid tab
|
| curb gutter | LF | 3 | $117.71 | $47.96 to $220.00 | Bids- 2026-05-08 · NDDOT · HEC-0050(056) · $117.71 per LF · qty 90.0 · bid tab
- 2026-05-08 · NDDOT · HEC-0050(056) · $47.96 per LF · qty 135.0 · bid tab
- 2023-12-08 · NDDOT · IM-6-029(164)163 · $220.00 per LF · qty 120.0 · bid tab
|
| excavation embankment | CY | 12 | $28.88 | $21.00 to $48.94 | Bids- 2026-05-08 · NDDOT · HEC-0050(056) · $48.94 per CY · qty 23.0 · bid tab
- 2026-05-08 · NDDOT · HEC-0050(056) · $30.77 per CY · qty 534.0 · bid tab
- 2025-12-12 · NDDOT · BRJ-0050(059) · $34.00 per CY · qty 374.0 · bid tab
- 2025-12-12 · NDDOT · BRJ-0050(059) · $25.00 per CY · qty 85.0 · bid tab
- 2025-04-11 · NDDOT · BRJ-0050(061) · $31.50 per CY · qty 1199.0 · bid tab
- 2025-04-11 · NDDOT · BRJ-0050(061) · $27.00 per CY · qty 110.0 · bid tab
- 2024-12-13 · NDDOT · BRJ-0050(058) · $32.00 per CY · qty 20.0 · bid tab
- 2024-12-13 · NDDOT · BRJ-0050(058) · $21.00 per CY · qty 470.0 · bid tab
- 2024-12-13 · NDDOT · BRJ-0050(058) · $22.50 per CY · qty 3267.0 · bid tab
- 2024-12-13 · NDDOT · BRJ-0050(060) · $40.00 per CY · qty 224.0 · bid tab
(10 most recent of 12 shown; all in the Hubstake feed) |
| flexible base | CY | 1 | $150.00 | $150.00 to $150.00 | Bids- 2024-08-09 · NDDOT · H-6-018(089)207 · $150.00 per CY · qty 38.0 · bid tab
|
| flexible base | TON | 4 | $48.11 | $19.25 to $74.24 | Bids- 2026-05-08 · NDDOT · HEC-0050(056) · $43.73 per TON · qty 694.0 · bid tab
- 2026-05-08 · NDDOT · HEC-0050(056) · $74.24 per TON · qty 47.0 · bid tab
- 2025-03-21 · NDDOT · SS-6-018(090)183 · $19.25 per TON · qty 870.0 · bid tab
- 2023-12-08 · NDDOT · IM-6-029(164)163 · $52.50 per TON · qty 280.0 · bid tab
|
| sidewalk | SY | 2 | $186.59 | $132.21 to $240.98 | Bids- 2026-05-08 · NDDOT · HEC-0050(056) · $240.98 per SY · qty 10.0 · bid tab
- 2026-05-08 · NDDOT · HEC-0050(056) · $132.21 per SY · qty 19.0 · bid tab
|
| storm pipe 60-inch | LF | 1 | $1,100.00 | $1,100.00 to $1,100.00 | Bids- 2023-12-08 · NDDOT · IM-6-029(164)163 · $1,100.00 per LF · qty 320.0 · bid tab
|
| storm pipe (diameter not stated) | LF | 4 | $3,527.50 | $1,800.00 to $4,500.00 | Bids- 2025-12-12 · NDDOT · BRJ-0050(059) · $1,800.00 per LF · qty 52.0 · bid tab
- 2025-12-12 · NDDOT · BRJ-0050(059) · $3,050.00 per LF · qty 52.0 · bid tab
- 2024-12-13 · NDDOT · BRJ-0050(058) · $4,005.00 per LF · qty 44.0 · bid tab
- 2024-12-13 · NDDOT · BRJ-0050(060) · $4,500.00 per LF · qty 54.0 · bid tab
|