Site-work prices, Stark County, ND

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON11$573.04$92.00 to $850.00
Bids
  • 2026-05-08 · NDDOT · H-5-085(092)071 · $573.04 per TON · qty 119.0 · bid tab
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $121.33 per TON · qty 18516.0 · bid tab
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $659.38 per TON · qty 1101.0 · bid tab
  • 2026-02-06 · NDDOT · SU-5-983(068) · $160.00 per TON · qty 1902.0 · bid tab
  • 2026-02-06 · NDDOT · SU-5-983(068) · $710.00 per TON · qty 114.0 · bid tab
  • 2026-02-06 · NDDOT · SU-5-983(068) · $850.00 per TON · qty 14.0 · bid tab
  • 2025-11-14 · NDDOT · SS-5-022(146)075 · $650.00 per TON · qty 19.0 · bid tab
  • 2024-01-26 · NDDOT · NHU-5-022(135)069 · $545.00 per TON · qty 275.0 · bid tab
  • 2023-11-17 · NDDOT · NHU-5-022(136)073 · $700.00 per TON · qty 449.0 · bid tab
  • 2023-11-17 · NDDOT · NHU-5-022(136)073 · $92.00 per TON · qty 7488.0 · bid tab
(10 most recent of 11 shown; all in the Hubstake feed)
concrete pavementSY6$142.69$92.84 to $330.00
Bids
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $173.02 per SY · qty 884.0 · bid tab
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $92.84 per SY · qty 128.0 · bid tab
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $120.27 per SY · qty 4584.0 · bid tab
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $156.14 per SY · qty 802.0 · bid tab
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $129.24 per SY · qty 4909.0 · bid tab
  • 2023-11-17 · NDDOT · NHU-5-022(136)073 · $330.00 per SY · qty 17.0 · bid tab
curb gutterLF12$63.48$21.50 to $155.00
Bids
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $39.04 per LF · qty 4104.0 · bid tab
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $27.43 per LF · qty 17116.0 · bid tab
  • 2026-02-06 · NDDOT · SU-5-983(068) · $60.00 per LF · qty 692.0 · bid tab
  • 2026-02-06 · NDDOT · SU-5-983(068) · $40.00 per LF · qty 1193.0 · bid tab
  • 2026-02-06 · NDDOT · SU-5-983(068) · $45.00 per LF · qty 47.0 · bid tab
  • 2025-12-12 · NDDOT · BRI-5-094(173)084 · $75.00 per LF · qty 60.0 · bid tab
  • 2024-01-26 · NDDOT · NHU-5-022(135)069 · $77.00 per LF · qty 2948.0 · bid tab
  • 2024-01-26 · NDDOT · NHU-5-022(135)069 · $21.50 per LF · qty 705.0 · bid tab
  • 2023-11-17 · NDDOT · NHU-5-022(136)073 · $155.00 per LF · qty 42.0 · bid tab
  • 2023-11-17 · NDDOT · TAC-0045(071) · $66.96 per LF · qty 275.0 · bid tab
(10 most recent of 12 shown; all in the Hubstake feed)
curb gutterSF1$1,500.00$1,500.00 to $1,500.00
Bids
  • 2025-12-12 · NDDOT · BRI-5-094(173)084 · $1,500.00 per SF · qty 4.0 · bid tab
excavation embankmentCY12$19.19$4.18 to $78.35
Bids
  • 2026-05-08 · NDDOT · H-5-085(092)071 · $23.31 per CY · qty 580.0 · bid tab
  • 2026-05-08 · NDDOT · H-5-085(092)071 · $20.37 per CY · qty 2178.0 · bid tab
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $14.08 per CY · qty 28238.0 · bid tab
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $12.58 per CY · qty 29818.0 · bid tab
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $10.84 per CY · qty 62294.0 · bid tab
  • 2026-02-06 · NDDOT · SU-5-983(068) · $18.00 per CY · qty 1527.0 · bid tab
  • 2026-02-06 · NDDOT · SU-5-983(068) · $25.00 per CY · qty 286.0 · bid tab
  • 2025-11-14 · NDDOT · SS-5-022(146)075 · $37.00 per CY · qty 458.0 · bid tab
  • 2024-08-09 · NDDOT · BRJ-0045(075) · $6.69 per CY · qty 5173.0 · bid tab
  • 2024-08-09 · NDDOT · BRJ-0045(075) · $4.18 per CY · qty 5797.0 · bid tab
(10 most recent of 12 shown; all in the Hubstake feed)
fire hydrantEA5$9,000.00$1,582.50 to $16,500.00
Bids
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $13,715.00 per EA · qty 1.0 · bid tab
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $4,747.50 per EA · qty 2.0 · bid tab
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $1,582.50 per EA · qty 2.0 · bid tab
  • 2026-02-06 · NDDOT · SU-5-983(068) · $9,000.00 per EA · qty 2.0 · bid tab
  • 2023-11-17 · NDDOT · TAC-0045(071) · $16,500.00 per EA · qty 1.0 · bid tab
flexible baseTON8$55.07$37.59 to $75.00
Bids
  • 2026-05-08 · NDDOT · H-5-085(092)071 · $50.14 per TON · qty 1335.0 · bid tab
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $41.51 per TON · qty 11040.0 · bid tab
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $37.59 per TON · qty 46267.0 · bid tab
  • 2026-02-06 · NDDOT · SU-5-983(068) · $68.00 per TON · qty 2024.0 · bid tab
  • 2025-11-14 · NDDOT · SS-5-022(146)075 · $75.00 per TON · qty 49.0 · bid tab
  • 2024-01-26 · NDDOT · NHU-5-022(135)069 · $49.14 per TON · qty 913.0 · bid tab
  • 2023-11-17 · NDDOT · NHU-5-022(136)073 · $60.00 per TON · qty 13.0 · bid tab
  • 2023-11-17 · NDDOT · TAC-0045(071) · $61.38 per TON · qty 346.0 · bid tab
inlet headwallEA12$6,592.50$325.00 to $12,501.75
Bids
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $8,044.38 per EA · qty 1.0 · bid tab
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $8,440.00 per EA · qty 31.0 · bid tab
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $5,723.38 per EA · qty 2.0 · bid tab
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $12,501.75 per EA · qty 1.0 · bid tab
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $5,327.75 per EA · qty 13.0 · bid tab
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $3,798.00 per EA · qty 4.0 · bid tab
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $7,385.00 per EA · qty 2.0 · bid tab
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $10,972.00 per EA · qty 1.0 · bid tab
  • 2026-02-06 · NDDOT · SU-5-983(068) · $5,800.00 per EA · qty 2.0 · bid tab
  • 2026-02-06 · NDDOT · SU-5-983(068) · $3,900.00 per EA · qty 1.0 · bid tab
(10 most recent of 12 shown; all in the Hubstake feed)
inlet headwallLF1$400.90$400.90 to $400.90
Bids
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $400.90 per LF · qty 20.0 · bid tab
lime cement stabilizationACRE2$919.00$918.00 to $920.00
Bids
  • 2026-05-08 · NDDOT · H-5-085(092)071 · $918.00 per ACRE · qty 1.5 · bid tab
  • 2025-11-14 · NDDOT · SS-5-022(146)075 · $920.00 per ACRE · qty 9.0 · bid tab
lime cement stabilizationSF1$316.50$316.50 to $316.50
Bids
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $316.50 per SF · qty 108.0 · bid tab
manholeEA9$8,400.00$5,064.00 to $26,500.00
Bids
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $8,123.50 per EA · qty 12.0 · bid tab
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $6,541.00 per EA · qty 6.0 · bid tab
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $20,045.00 per EA · qty 1.0 · bid tab
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $10,339.00 per EA · qty 4.0 · bid tab
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $5,064.00 per EA · qty 2.0 · bid tab
  • 2026-02-06 · NDDOT · SU-5-983(068) · $8,400.00 per EA · qty 1.0 · bid tab
  • 2026-02-06 · NDDOT · SU-5-983(068) · $5,700.00 per EA · qty 1.0 · bid tab
  • 2026-02-06 · NDDOT · SU-5-983(068) · $10,500.00 per EA · qty 3.0 · bid tab
  • 2026-02-06 · NDDOT · SU-5-983(068) · $26,500.00 per EA · qty 1.0 · bid tab
sewer main 8-inchLF1$124.00$124.00 to $124.00
Bids
  • 2026-02-06 · NDDOT · SU-5-983(068) · $124.00 per LF · qty 548.0 · bid tab
sewer serviceEA1$2,150.00$2,150.00 to $2,150.00
Bids
  • 2026-02-06 · NDDOT · SU-5-983(068) · $2,150.00 per EA · qty 2.0 · bid tab
sewer serviceLF1$115.00$115.00 to $115.00
Bids
  • 2026-02-06 · NDDOT · SU-5-983(068) · $115.00 per LF · qty 64.0 · bid tab
sidewalkEA6$95.00$55.00 to $6,915.00
Bids
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $68.58 per EA · qty 10.0 · bid tab
  • 2026-02-06 · NDDOT · SU-5-983(068) · $70.00 per EA · qty 25.0 · bid tab
  • 2025-02-07 · NDDOT · NHU-CRP-5-022(145)070 · $120.00 per EA · qty 6.0 · bid tab
  • 2024-01-26 · NDDOT · NHU-5-022(135)069 · $55.00 per EA · qty 20.0 · bid tab
  • 2024-01-26 · NDDOT · NHU-5-022(135)069 · $6,915.00 per EA · qty 1.0 · bid tab
  • 2023-11-17 · NDDOT · TAC-0045(071) · $1,312.73 per EA · qty 1.0 · bid tab
sidewalkLF2$13.33$12.66 to $14.00
Bids
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $12.66 per LF · qty 1735.0 · bid tab
  • 2026-02-06 · NDDOT · SU-5-983(068) · $14.00 per LF · qty 340.0 · bid tab
sidewalkSY10$130.94$59.61 to $235.00
Bids
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $131.88 per SY · qty 11.0 · bid tab
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $107.61 per SY · qty 756.0 · bid tab
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $59.61 per SY · qty 6709.0 · bid tab
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $137.15 per SY · qty 92.0 · bid tab
  • 2026-02-06 · NDDOT · SU-5-983(068) · $91.00 per SY · qty 652.0 · bid tab
  • 2024-01-26 · NDDOT · NHU-5-022(135)069 · $130.00 per SY · qty 2033.0 · bid tab
  • 2024-01-26 · NDDOT · NHU-5-022(135)069 · $212.00 per SY · qty 22.0 · bid tab
  • 2023-11-17 · NDDOT · NHU-5-022(136)073 · $235.00 per SY · qty 19.0 · bid tab
  • 2023-11-17 · NDDOT · TAC-0045(071) · $127.22 per SY · qty 756.0 · bid tab
  • 2023-11-17 · NDDOT · TAC-0045(071) · $170.19 per SY · qty 148.0 · bid tab
storm pipe 12-inchLF1$205.73$205.73 to $205.73
Bids
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $205.73 per LF · qty 9.0 · bid tab
storm pipe 15-inchLF1$205.73$205.73 to $205.73
Bids
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $205.73 per LF · qty 10.0 · bid tab
storm pipe 18-inchLF1$220.00$220.00 to $220.00
Bids
  • 2023-11-17 · NDDOT · TAC-0045(071) · $220.00 per LF · qty 8.0 · bid tab
storm pipe 24-inchLF1$328.30$328.30 to $328.30
Bids
  • 2024-08-09 · NDDOT · BRJ-0045(075) · $328.30 per LF · qty 100.0 · bid tab
storm pipe 30-inchLF1$311.23$311.23 to $311.23
Bids
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $311.23 per LF · qty 20.0 · bid tab
storm pipe (diameter not stated)LF1$4,082.44$4,082.44 to $4,082.44
Bids
  • 2024-08-09 · NDDOT · BRJ-0045(075) · $4,082.44 per LF · qty 55.0 · bid tab
water main 12-inchLF1$474.75$474.75 to $474.75
Bids
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $474.75 per LF · qty 166.0 · bid tab
water main 6-inchLF2$178.60$104.00 to $253.20
Bids
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $253.20 per LF · qty 33.0 · bid tab
  • 2026-02-06 · NDDOT · SU-5-983(068) · $104.00 per LF · qty 28.0 · bid tab
water main 8-inchLF3$290.13$108.00 to $342.88
Bids
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $342.88 per LF · qty 84.0 · bid tab
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $290.13 per LF · qty 374.0 · bid tab
  • 2026-02-06 · NDDOT · SU-5-983(068) · $108.00 per LF · qty 794.0 · bid tab
water serviceEA1$1,582.50$1,582.50 to $1,582.50
Bids
  • 2026-02-27 · NDDOT · NHU-CRP-IM-5-094(160)903 · $1,582.50 per EA · qty 1.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.