Site-work prices, Richland County, ND
Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.
| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 8 | $347.00 | $42.00 to $780.00 | Bids- 2025-04-11 · NDDOT · SS-8-018(115)025 · $42.00 per TON · qty 59181.0 · bid tab
- 2025-04-11 · NDDOT · SS-8-018(115)025 · $600.00 per TON · qty 2722.3 · bid tab
- 2024-01-26 · NDDOT · HEN-8-013(063)374 · $80.00 per TON · qty 2588.0 · bid tab
- 2024-01-26 · NDDOT · HEN-8-013(063)374 · $700.00 per TON · qty 155.0 · bid tab
- 2023-11-17 · NDDOT · IM-8-029(212)022 · $700.00 per TON · qty 2848.0 · bid tab
- 2023-11-17 · NDDOT · IM-8-029(212)022 · $780.00 per TON · qty 1221.0 · bid tab
- 2023-11-17 · NDDOT · IM-8-029(212)022 · $51.00 per TON · qty 48187.0 · bid tab
- 2023-11-17 · NDDOT · IM-8-029(212)022 · $94.00 per TON · qty 20354.0 · bid tab
|
| concrete pavement | SY | 1 | $0.61 | $0.61 to $0.61 | Bids- 2023-11-17 · NDDOT · IM-8-029(212)022 · $0.61 per SY · qty 246802.0 · bid tab
|
| excavation embankment | CY | 5 | $14.00 | $10.00 to $70.00 | Bids- 2024-11-15 · NDDOT · BRP-BRJ-0039(049) · $12.00 per CY · qty 428.0 · bid tab
- 2024-11-15 · NDDOT · BRP-BRJ-0039(049) · $10.00 per CY · qty 250.0 · bid tab
- 2024-01-26 · NDDOT · HEN-8-013(063)374 · $14.00 per CY · qty 2165.0 · bid tab
- 2024-01-26 · NDDOT · HEN-8-013(063)374 · $28.00 per CY · qty 7838.0 · bid tab
- 2023-11-17 · NDDOT · IM-8-029(212)022 · $70.00 per CY · qty 488.0 · bid tab
|
| flexible base | TON | 3 | $35.00 | $24.00 to $37.00 | Bids- 2025-04-11 · NDDOT · SS-8-018(115)025 · $35.00 per TON · qty 648.0 · bid tab
- 2024-01-26 · NDDOT · HEN-8-013(063)374 · $24.00 per TON · qty 9372.0 · bid tab
- 2023-11-17 · NDDOT · IM-8-029(212)022 · $37.00 per TON · qty 3132.0 · bid tab
|
| storm pipe (diameter not stated) | LF | 2 | $1,413.50 | $1,390.00 to $1,437.00 | Bids- 2024-11-15 · NDDOT · BRP-BRJ-0039(049) · $1,437.00 per LF · qty 112.0 · bid tab
- 2024-11-15 · NDDOT · BRP-BRJ-0039(049) · $1,390.00 per LF · qty 96.0 · bid tab
|
Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.