Site-work prices, Ramsey County, ND

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON12$318.00$57.00 to $560.00
Bids
  • 2026-05-08 · NDDOT · SC-3600(100) · $63.00 per TON · qty 25436.0 · bid tab
  • 2026-05-08 · NDDOT · SC-3600(100) · $440.00 per TON · qty 1347.0 · bid tab
  • 2026-05-08 · NDDOT · SU-3-982(043) · $83.25 per TON · qty 6778.0 · bid tab
  • 2026-05-08 · NDDOT · SU-3-982(043) · $500.00 per TON · qty 407.0 · bid tab
  • 2026-04-10 · NDDOT · NH-3-002(181)278 · $57.00 per TON · qty 15750.0 · bid tab
  • 2026-04-10 · NDDOT · NH-3-002(181)278 · $560.00 per TON · qty 790.0 · bid tab
  • 2025-06-13 · NDDOT · CERP-3633(070) · $196.00 per TON · qty 514.0 · bid tab
  • 2025-04-25 · NDDOT · SU-3-982(042) · $67.00 per TON · qty 3812.0 · bid tab
  • 2025-04-25 · NDDOT · SU-3-982(042) · $476.00 per TON · qty 229.0 · bid tab
  • 2024-10-11 · NDDOT · NHU-CRP-3-020(143)102 · $480.00 per TON · qty 2.0 · bid tab
(10 most recent of 12 shown; all in the Hubstake feed)
curb gutterLF3$78.85$42.55 to $84.95
Bids
  • 2026-05-08 · NDDOT · SU-3-982(043) · $78.85 per LF · qty 404.0 · bid tab
  • 2024-10-11 · NDDOT · NHU-CRP-3-020(143)102 · $84.95 per LF · qty 18.0 · bid tab
  • 2024-05-10 · NDDOT · SU-CPU-3-982(040) · $42.55 per LF · qty 7163.0 · bid tab
excavation embankmentCY8$15.88$11.00 to $100.00
Bids
  • 2026-05-08 · NDDOT · SC-3600(100) · $100.00 per CY · qty 145.0 · bid tab
  • 2026-05-08 · NDDOT · SU-3-982(043) · $11.00 per CY · qty 268.0 · bid tab
  • 2025-06-13 · NDDOT · CERP-3633(070) · $16.25 per CY · qty 332.0 · bid tab
  • 2025-06-13 · NDDOT · CERP-3633(070) · $18.25 per CY · qty 680.0 · bid tab
  • 2024-10-11 · NDDOT · NHU-CRP-3-020(143)102 · $44.64 per CY · qty 143.0 · bid tab
  • 2024-05-10 · NDDOT · SU-CPU-3-982(040) · $14.00 per CY · qty 1574.0 · bid tab
  • 2024-05-10 · NDDOT · SU-CPU-3-982(040) · $14.00 per CY · qty 231.0 · bid tab
  • 2024-05-10 · NDDOT · SU-CPU-3-982(040) · $15.50 per CY · qty 1257.0 · bid tab
flexible baseSTA2$344.00$178.00 to $510.00
Bids
  • 2025-04-25 · NDDOT · SU-3-982(042) · $178.00 per STA · qty 47.0 · bid tab
  • 2024-05-10 · NDDOT · SU-CPU-3-982(040) · $510.00 per STA · qty 73.2 · bid tab
flexible baseTON6$35.38$19.35 to $189.07
Bids
  • 2026-05-08 · NDDOT · SC-3600(100) · $40.00 per TON · qty 994.0 · bid tab
  • 2026-05-08 · NDDOT · SU-3-982(043) · $30.75 per TON · qty 502.0 · bid tab
  • 2025-06-13 · NDDOT · CERP-3633(070) · $25.20 per TON · qty 1597.0 · bid tab
  • 2025-04-25 · NDDOT · SU-3-982(042) · $45.00 per TON · qty 1472.0 · bid tab
  • 2024-10-11 · NDDOT · NHU-CRP-3-020(143)102 · $189.07 per TON · qty 21.2 · bid tab
  • 2024-05-10 · NDDOT · SU-CPU-3-982(040) · $19.35 per TON · qty 8608.0 · bid tab
inlet headwallEA4$6,750.00$1,350.00 to $12,960.00
Bids
  • 2024-05-10 · NDDOT · SU-CPU-3-982(040) · $1,350.00 per EA · qty 2.0 · bid tab
  • 2024-05-10 · NDDOT · SU-CPU-3-982(040) · $12,960.00 per EA · qty 1.0 · bid tab
  • 2024-05-10 · NDDOT · SU-CPU-3-982(040) · $5,940.00 per EA · qty 1.0 · bid tab
  • 2024-05-10 · NDDOT · SU-CPU-3-982(040) · $7,560.00 per EA · qty 1.0 · bid tab
manholeEA1$5,400.00$5,400.00 to $5,400.00
Bids
  • 2024-05-10 · NDDOT · SU-CPU-3-982(040) · $5,400.00 per EA · qty 1.0 · bid tab
sidewalkEA1$73.50$73.50 to $73.50
Bids
  • 2026-05-08 · NDDOT · SU-3-982(043) · $73.50 per EA · qty 5.0 · bid tab
sidewalkSY3$167.79$127.45 to $236.00
Bids
  • 2026-05-08 · NDDOT · SU-3-982(043) · $236.00 per SY · qty 52.0 · bid tab
  • 2024-10-11 · NDDOT · NHU-CRP-3-020(143)102 · $167.79 per SY · qty 87.3 · bid tab
  • 2024-05-10 · NDDOT · SU-CPU-3-982(040) · $127.45 per SY · qty 930.0 · bid tab
storm pipe 15-inchLF1$96.80$96.80 to $96.80
Bids
  • 2024-05-10 · NDDOT · SU-CPU-3-982(040) · $96.80 per LF · qty 52.0 · bid tab
storm pipe 18-inchLF1$101.20$101.20 to $101.20
Bids
  • 2024-05-10 · NDDOT · SU-CPU-3-982(040) · $101.20 per LF · qty 358.0 · bid tab
storm pipe 54-inchLF1$506.10$506.10 to $506.10
Bids
  • 2025-06-13 · NDDOT · CERP-3633(070) · $506.10 per LF · qty 120.0 · bid tab
storm pipe 65-inchLF1$602.00$602.00 to $602.00
Bids
  • 2025-06-13 · NDDOT · CERP-3633(070) · $602.00 per LF · qty 138.0 · bid tab
storm pipe 72-inchLF1$714.00$714.00 to $714.00
Bids
  • 2025-06-13 · NDDOT · CERP-3633(070) · $714.00 per LF · qty 156.0 · bid tab
storm pipe 78-inchLF1$831.00$831.00 to $831.00
Bids
  • 2025-06-13 · NDDOT · CERP-3633(070) · $831.00 per LF · qty 156.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.