| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 3 | $360.00 | $44.52 to $572.63 | Bids- 2026-02-06 · NDDOT · SS-3-017(038)000 · $44.52 per TON · qty 22708.0 · bid tab
- 2026-02-06 · NDDOT · SS-3-017(038)000 · $572.63 per TON · qty 1351.0 · bid tab
- 2025-01-10 · NDDOT · NH-3-003(030)202 · $360.00 per TON · qty 100.0 · bid tab
|
| concrete pavement | SY | 1 | $145.00 | $145.00 to $145.00 | Bids- 2025-01-10 · NDDOT · NH-3-003(030)202 · $145.00 per SY · qty 9687.0 · bid tab
|
| curb gutter | LF | 3 | $76.00 | $72.00 to $150.00 | Bids- 2025-01-10 · NDDOT · NH-3-003(030)202 · $76.00 per LF · qty 104.0 · bid tab
- 2025-01-10 · NDDOT · NH-3-003(030)202 · $72.00 per LF · qty 3983.0 · bid tab
- 2025-01-10 · NDDOT · NH-3-003(030)202 · $150.00 per LF · qty 109.0 · bid tab
|
| excavation embankment | CY | 3 | $40.00 | $21.19 to $58.00 | Bids- 2026-02-06 · NDDOT · SS-3-017(038)000 · $21.19 per CY · qty 1225.0 · bid tab
- 2025-01-10 · NDDOT · NH-3-003(030)202 · $40.00 per CY · qty 331.0 · bid tab
- 2025-01-10 · NDDOT · NH-3-003(030)202 · $58.00 per CY · qty 2319.0 · bid tab
|
| fire hydrant | EA | 1 | $14,300.00 | $14,300.00 to $14,300.00 | Bids- 2025-01-10 · NDDOT · NH-3-003(030)202 · $14,300.00 per EA · qty 4.0 · bid tab
|
| flexible base | TON | 3 | $58.00 | $34.48 to $71.50 | Bids- 2026-02-06 · NDDOT · SS-3-017(038)000 · $34.48 per TON · qty 1654.0 · bid tab
- 2025-01-10 · NDDOT · NH-3-003(030)202 · $71.50 per TON · qty 729.0 · bid tab
- 2025-01-10 · NDDOT · NH-3-003(030)202 · $58.00 per TON · qty 8838.0 · bid tab
|
| inlet headwall | EA | 8 | $10,677.50 | $5,520.00 to $21,400.00 | Bids- 2025-01-10 · NDDOT · NH-3-003(030)202 · $14,800.00 per EA · qty 1.0 · bid tab
- 2025-01-10 · NDDOT · NH-3-003(030)202 · $10,730.00 per EA · qty 3.0 · bid tab
- 2025-01-10 · NDDOT · NH-3-003(030)202 · $21,400.00 per EA · qty 2.0 · bid tab
- 2025-01-10 · NDDOT · NH-3-003(030)202 · $10,625.00 per EA · qty 5.0 · bid tab
- 2025-01-10 · NDDOT · NH-3-003(030)202 · $7,975.00 per EA · qty 7.0 · bid tab
- 2025-01-10 · NDDOT · NH-3-003(030)202 · $5,520.00 per EA · qty 1.0 · bid tab
- 2025-01-10 · NDDOT · NH-3-003(030)202 · $9,630.00 per EA · qty 1.0 · bid tab
- 2025-01-10 · NDDOT · NH-3-003(030)202 · $20,850.00 per EA · qty 2.0 · bid tab
|
| manhole | EA | 5 | $15,300.00 | $11,450.00 to $23,000.00 | Bids- 2025-01-10 · NDDOT · NH-3-003(030)202 · $15,300.00 per EA · qty 6.0 · bid tab
- 2025-01-10 · NDDOT · NH-3-003(030)202 · $12,550.00 per EA · qty 4.0 · bid tab
- 2025-01-10 · NDDOT · NH-3-003(030)202 · $23,000.00 per EA · qty 1.0 · bid tab
- 2025-01-10 · NDDOT · NH-3-003(030)202 · $11,450.00 per EA · qty 4.0 · bid tab
- 2025-01-10 · NDDOT · NH-3-003(030)202 · $17,500.00 per EA · qty 2.0 · bid tab
|
| sewer main 10-inch | LF | 1 | $68.20 | $68.20 to $68.20 | Bids- 2025-01-10 · NDDOT · NH-3-003(030)202 · $68.20 per LF · qty 494.0 · bid tab
|
| sewer main 15-inch | LF | 1 | $108.00 | $108.00 to $108.00 | Bids- 2025-01-10 · NDDOT · NH-3-003(030)202 · $108.00 per LF · qty 97.0 · bid tab
|
| sewer main 8-inch | LF | 1 | $82.50 | $82.50 to $82.50 | Bids- 2025-01-10 · NDDOT · NH-3-003(030)202 · $82.50 per LF · qty 218.0 · bid tab
|
| sewer service | EA | 1 | $5,500.00 | $5,500.00 to $5,500.00 | Bids- 2025-01-10 · NDDOT · NH-3-003(030)202 · $5,500.00 per EA · qty 5.0 · bid tab
|
| sidewalk | EA | 1 | $50.00 | $50.00 to $50.00 | Bids- 2025-01-10 · NDDOT · NH-3-003(030)202 · $50.00 per EA · qty 36.0 · bid tab
|
| sidewalk | LF | 1 | $75.00 | $75.00 to $75.00 | Bids- 2025-01-10 · NDDOT · NH-3-003(030)202 · $75.00 per LF · qty 250.0 · bid tab
|
| sidewalk | SY | 3 | $158.00 | $155.00 to $160.00 | Bids- 2025-01-10 · NDDOT · NH-3-003(030)202 · $155.00 per SY · qty 55.0 · bid tab
- 2025-01-10 · NDDOT · NH-3-003(030)202 · $160.00 per SY · qty 626.0 · bid tab
- 2025-01-10 · NDDOT · NH-3-003(030)202 · $158.00 per SY · qty 1337.0 · bid tab
|
| water main 6-inch | LF | 1 | $62.70 | $62.70 to $62.70 | Bids- 2025-01-10 · NDDOT · NH-3-003(030)202 · $62.70 per LF · qty 855.0 · bid tab
|
| water service | EA | 1 | $7,425.00 | $7,425.00 to $7,425.00 | Bids- 2025-01-10 · NDDOT · NH-3-003(030)202 · $7,425.00 per EA · qty 5.0 · bid tab
|