Site-work prices, Mckenzie County, ND

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON14$327.60$36.25 to $710.00
Bids
  • 2026-07-02 · NDDOT · H-7-016(011)133 · $340.20 per TON · qty 169.0 · bid tab
  • 2026-03-27 · NDDOT · NH-7-085(137)138 · $36.25 per TON · qty 118299.0 · bid tab
  • 2026-03-27 · NDDOT · NH-7-085(137)138 · $611.00 per TON · qty 5323.0 · bid tab
  • 2025-11-21 · NDDOT · RSG-ARP-FTF-5-085(085)107 · $72.63 per TON · qty 217105.0 · bid tab
  • 2025-11-21 · NDDOT · RSG-ARP-FTF-5-085(085)107 · $131.09 per TON · qty 1349.0 · bid tab
  • 2025-11-21 · NDDOT · RSG-ARP-FTF-5-085(085)107 · $506.00 per TON · qty 5231.0 · bid tab
  • 2025-11-21 · NDDOT · RSG-ARP-FTF-5-085(085)107 · $621.00 per TON · qty 7793.0 · bid tab
  • 2025-11-07 · NDDOT · XB-ARP-FTF-7-085(127)120 · $172.00 per TON · qty 5086.0 · bid tab
  • 2025-11-07 · NDDOT · XB-ARP-FTF-7-085(127)120 · $79.40 per TON · qty 103769.0 · bid tab
  • 2025-11-07 · NDDOT · XB-ARP-FTF-7-085(127)120 · $523.00 per TON · qty 2858.0 · bid tab
(10 most recent of 14 shown; all in the Hubstake feed)
concrete pavementSY1$182.00$182.00 to $182.00
Bids
  • 2023-11-17 · NDDOT · RBD-SS-7-806(014)306 · $182.00 per SY · qty 577.0 · bid tab
curb gutterLF2$43.25$41.50 to $45.00
Bids
  • 2026-02-06 · NDDOT · HEN-7-023(068)043 · $45.00 per LF · qty 1366.0 · bid tab
  • 2023-11-17 · NDDOT · RBD-SS-7-806(014)306 · $41.50 per LF · qty 10668.0 · bid tab
excavation embankmentCY19$25.00$3.93 to $130.00
Bids
  • 2026-07-02 · NDDOT · H-7-016(011)133 · $41.20 per CY · qty 775.0 · bid tab
  • 2026-02-06 · NDDOT · HEN-7-023(068)043 · $40.00 per CY · qty 271.0 · bid tab
  • 2025-11-21 · NDDOT · RSG-ARP-FTF-5-085(085)107 · $3.93 per CY · qty 676896.0 · bid tab
  • 2025-11-21 · NDDOT · RSG-ARP-FTF-5-085(085)107 · $7.07 per CY · qty 860234.0 · bid tab
  • 2025-11-07 · NDDOT · XB-ARP-FTF-7-085(127)120 · $11.00 per CY · qty 4612.0 · bid tab
  • 2025-11-07 · NDDOT · XB-ARP-FTF-7-085(127)120 · $6.10 per CY · qty 2664962.0 · bid tab
  • 2024-03-15 · NDDOT · BRJ-0027(052) · $40.00 per CY · qty 980.0 · bid tab
  • 2024-03-15 · NDDOT · BRJ-0027(052) · $30.00 per CY · qty 3460.0 · bid tab
  • 2024-03-15 · NDDOT · BRJ-0027(052) · $130.00 per CY · qty 25.0 · bid tab
  • 2024-03-15 · NDDOT · BRJ-0027(052) · $35.00 per CY · qty 489.0 · bid tab
(10 most recent of 19 shown; all in the Hubstake feed)
flexible baseTON8$42.86$17.19 to $100.00
Bids
  • 2026-07-02 · NDDOT · H-7-016(011)133 · $39.71 per TON · qty 266.0 · bid tab
  • 2026-02-06 · NDDOT · HEN-7-023(068)043 · $72.00 per TON · qty 756.0 · bid tab
  • 2025-11-21 · NDDOT · RSG-ARP-FTF-5-085(085)107 · $17.19 per TON · qty 525026.0 · bid tab
  • 2025-11-07 · NDDOT · XB-ARP-FTF-7-085(127)120 · $30.00 per TON · qty 265543.0 · bid tab
  • 2024-03-15 · NDDOT · BRJ-0027(052) · $52.00 per TON · qty 916.0 · bid tab
  • 2024-02-16 · NDDOT · BRP-BRC-2700(053) · $46.00 per TON · qty 378.0 · bid tab
  • 2024-01-26 · NDDOT · NH-7-023(064)003 · $100.00 per TON · qty 694.0 · bid tab
  • 2023-11-17 · NDDOT · RBD-SS-7-806(014)306 · $39.15 per TON · qty 61494.0 · bid tab
inlet headwallEA5$13,300.00$5,675.00 to $20,255.00
Bids
  • 2026-02-06 · NDDOT · HEN-7-023(068)043 · $13,500.00 per EA · qty 2.0 · bid tab
  • 2025-11-07 · NDDOT · XB-ARP-FTF-7-085(127)120 · $13,300.00 per EA · qty 1.0 · bid tab
  • 2023-11-17 · NDDOT · RBD-SS-7-806(014)306 · $8,965.00 per EA · qty 22.0 · bid tab
  • 2023-11-17 · NDDOT · RBD-SS-7-806(014)306 · $5,675.00 per EA · qty 13.0 · bid tab
  • 2023-11-17 · NDDOT · RBD-SS-7-806(014)306 · $20,255.00 per EA · qty 2.0 · bid tab
lime cement stabilizationACRE3$762.90$400.00 to $1,100.00
Bids
  • 2026-07-02 · NDDOT · H-7-016(011)133 · $762.90 per ACRE · qty 2.0 · bid tab
  • 2025-11-21 · NDDOT · RSG-ARP-FTF-5-085(085)107 · $400.00 per ACRE · qty 635.0 · bid tab
  • 2025-11-07 · NDDOT · XB-ARP-FTF-7-085(127)120 · $1,100.00 per ACRE · qty 178.7 · bid tab
lime cement stabilizationEA2$4,000.00$3,000.00 to $5,000.00
Bids
  • 2025-11-07 · NDDOT · XB-ARP-FTF-7-085(127)120 · $5,000.00 per EA · qty 6.0 · bid tab
  • 2025-11-07 · NDDOT · XB-ARP-FTF-7-085(127)120 · $3,000.00 per EA · qty 6.0 · bid tab
manholeEA13$14,700.00$3,500.00 to $175,000.00
Bids
  • 2026-07-02 · NDDOT · H-7-016(011)133 · $14,305.68 per EA · qty 1.0 · bid tab
  • 2026-02-06 · NDDOT · HEN-7-023(068)043 · $3,500.00 per EA · qty 1.0 · bid tab
  • 2025-11-21 · NDDOT · RSG-ARP-FTF-5-085(085)107 · $8,620.02 per EA · qty 4.0 · bid tab
  • 2025-11-07 · NDDOT · XB-ARP-FTF-7-085(127)120 · $14,700.00 per EA · qty 11.0 · bid tab
  • 2025-11-07 · NDDOT · XB-ARP-FTF-7-085(127)120 · $18,400.00 per EA · qty 2.0 · bid tab
  • 2025-11-07 · NDDOT · XB-ARP-FTF-7-085(127)120 · $6,080.00 per EA · qty 1.0 · bid tab
  • 2025-11-07 · NDDOT · XB-ARP-FTF-7-085(127)120 · $26,000.00 per EA · qty 2.0 · bid tab
  • 2025-11-07 · NDDOT · XB-ARP-FTF-7-085(127)120 · $16,200.00 per EA · qty 3.0 · bid tab
  • 2024-01-26 · NDDOT · NH-7-023(064)003 · $88,000.00 per EA · qty 1.0 · bid tab
  • 2024-01-26 · NDDOT · NH-7-023(064)003 · $175,000.00 per EA · qty 1.0 · bid tab
(10 most recent of 13 shown; all in the Hubstake feed)
sidewalkEA1$65.00$65.00 to $65.00
Bids
  • 2026-02-06 · NDDOT · HEN-7-023(068)043 · $65.00 per EA · qty 12.0 · bid tab
sidewalkLF1$14.00$14.00 to $14.00
Bids
  • 2026-02-06 · NDDOT · HEN-7-023(068)043 · $14.00 per LF · qty 782.0 · bid tab
sidewalkSY2$110.25$85.50 to $135.00
Bids
  • 2026-02-06 · NDDOT · HEN-7-023(068)043 · $135.00 per SY · qty 152.0 · bid tab
  • 2026-02-06 · NDDOT · HEN-7-023(068)043 · $85.50 per SY · qty 3182.0 · bid tab
storm pipe 12-inchLF1$400.00$400.00 to $400.00
Bids
  • 2024-01-26 · NDDOT · NH-7-023(064)003 · $400.00 per LF · qty 34.0 · bid tab
storm pipe 24-inchLF2$526.52$195.04 to $858.00
Bids
  • 2025-11-21 · NDDOT · RSG-ARP-FTF-5-085(085)107 · $195.04 per LF · qty 663.0 · bid tab
  • 2025-11-07 · NDDOT · XB-ARP-FTF-7-085(127)120 · $858.00 per LF · qty 13.0 · bid tab
storm pipe 30-inchLF6$438.50$223.14 to $543.00
Bids
  • 2025-11-21 · NDDOT · RSG-ARP-FTF-5-085(085)107 · $223.14 per LF · qty 892.0 · bid tab
  • 2025-11-21 · NDDOT · RSG-ARP-FTF-5-085(085)107 · $232.18 per LF · qty 272.0 · bid tab
  • 2025-11-07 · NDDOT · XB-ARP-FTF-7-085(127)120 · $500.00 per LF · qty 28.0 · bid tab
  • 2025-11-07 · NDDOT · XB-ARP-FTF-7-085(127)120 · $543.00 per LF · qty 574.0 · bid tab
  • 2024-01-26 · NDDOT · NH-7-023(064)003 · $500.00 per LF · qty 40.0 · bid tab
  • 2023-11-17 · NDDOT · RBD-SS-7-806(014)306 · $377.00 per LF · qty 156.0 · bid tab
storm pipe 36-inchLF5$453.00$250.81 to $600.00
Bids
  • 2025-11-21 · NDDOT · RSG-ARP-FTF-5-085(085)107 · $250.81 per LF · qty 196.0 · bid tab
  • 2025-11-21 · NDDOT · RSG-ARP-FTF-5-085(085)107 · $259.29 per LF · qty 122.0 · bid tab
  • 2025-11-07 · NDDOT · XB-ARP-FTF-7-085(127)120 · $467.00 per LF · qty 138.0 · bid tab
  • 2024-01-26 · NDDOT · NH-7-023(064)003 · $600.00 per LF · qty 16.0 · bid tab
  • 2023-11-17 · NDDOT · RBD-SS-7-806(014)306 · $453.00 per LF · qty 126.0 · bid tab
storm pipe 42-inchLF1$294.21$294.21 to $294.21
Bids
  • 2025-11-21 · NDDOT · RSG-ARP-FTF-5-085(085)107 · $294.21 per LF · qty 200.0 · bid tab
storm pipe 44-inchLF1$503.00$503.00 to $503.00
Bids
  • 2023-11-17 · NDDOT · RBD-SS-7-806(014)306 · $503.00 per LF · qty 60.0 · bid tab
storm pipe 48-inchLF5$655.00$339.40 to $967.00
Bids
  • 2025-11-21 · NDDOT · RSG-ARP-FTF-5-085(085)107 · $339.40 per LF · qty 146.0 · bid tab
  • 2025-11-21 · NDDOT · RSG-ARP-FTF-5-085(085)107 · $351.83 per LF · qty 100.0 · bid tab
  • 2025-11-07 · NDDOT · XB-ARP-FTF-7-085(127)120 · $967.00 per LF · qty 34.0 · bid tab
  • 2024-01-26 · NDDOT · NH-7-023(064)003 · $775.00 per LF · qty 32.0 · bid tab
  • 2023-11-17 · NDDOT · RBD-SS-7-806(014)306 · $655.00 per LF · qty 46.0 · bid tab
storm pipe 54-inchLF2$663.78$452.57 to $875.00
Bids
  • 2025-11-21 · NDDOT · RSG-ARP-FTF-5-085(085)107 · $452.57 per LF · qty 102.0 · bid tab
  • 2024-01-26 · NDDOT · NH-7-023(064)003 · $875.00 per LF · qty 24.0 · bid tab
storm pipe 66-inchLF1$722.15$722.15 to $722.15
Bids
  • 2025-11-21 · NDDOT · RSG-ARP-FTF-5-085(085)107 · $722.15 per LF · qty 184.0 · bid tab
storm pipe 72-inchLF1$667.52$667.52 to $667.52
Bids
  • 2025-11-21 · NDDOT · RSG-ARP-FTF-5-085(085)107 · $667.52 per LF · qty 98.0 · bid tab
storm pipe (diameter not stated)LF6$3,780.00$5.00 to $5,850.00
Bids
  • 2025-11-21 · NDDOT · RSG-ARP-FTF-5-085(085)107 · $5.00 per LF · qty 104.0 · bid tab
  • 2025-11-07 · NDDOT · XB-ARP-FTF-7-085(127)120 · $4,250.00 per LF · qty 136.0 · bid tab
  • 2024-03-15 · NDDOT · BRJ-0027(052) · $2,850.00 per LF · qty 76.0 · bid tab
  • 2024-03-15 · NDDOT · BRJ-0027(052) · $5,850.00 per LF · qty 76.0 · bid tab
  • 2024-03-15 · NDDOT · BRJ-0027(052) · $4,820.00 per LF · qty 76.0 · bid tab
  • 2024-02-16 · NDDOT · BRP-BRC-2700(053) · $3,310.00 per LF · qty 90.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.