Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON14$193.00$53.00 to $5,000.00
Bids
  • 2026-06-12 · NDDOT · H-6-032(078)168 · $228.00 per TON · qty 193.0 · bid tab
  • 2026-04-10 · NDDOT · IM-6-029(172)136 · $96.15 per TON · qty 4610.0 · bid tab
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $140.00 per TON · qty 3288.0 · bid tab
  • 2026-02-27 · NDDOT · NHU-6-297(015)002 · $924.00 per TON · qty 31.0 · bid tab
  • 2026-02-27 · NDDOT · NHU-6-297(015)002 · $124.43 per TON · qty 580.0 · bid tab
  • 2026-02-27 · NDDOT · NHU-6-297(015)002 · $512.40 per TON · qty 18.0 · bid tab
  • 2025-05-09 · NDDOT · H-6-002(148)342 · $520.00 per TON · qty 150.0 · bid tab
  • 2025-05-09 · NDDOT · H-6-002(148)342 · $75.00 per TON · qty 2811.0 · bid tab
  • 2024-12-13 · NDDOT · BRC-1802(058) · $158.00 per TON · qty 727.0 · bid tab
  • 2024-02-16 · NDDOT · SC-1800(023) · $360.00 per TON · qty 1408.0 · bid tab
(10 most recent of 14 shown; all in the Hubstake feed)
concrete pavementSY10$142.50$4.07 to $625.00
Bids
  • 2026-04-10 · NDDOT · IM-6-029(172)136 · $4.07 per SY · qty 382951.0 · bid tab
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $109.50 per SY · qty 43562.0 · bid tab
  • 2026-02-27 · NDDOT · NHU-6-297(015)002 · $169.07 per SY · qty 254.0 · bid tab
  • 2026-02-27 · NDDOT · NHU-6-297(015)002 · $4.14 per SY · qty 15800.0 · bid tab
  • 2025-02-07 · NDDOT · UGP-6-986(142) · $103.50 per SY · qty 2049.0 · bid tab
  • 2025-02-07 · NDDOT · UGP-6-986(142) · $128.00 per SY · qty 128.0 · bid tab
  • 2024-11-15 · NDDOT · HEN-NHU-6-081(114)942 · $157.00 per SY · qty 317.0 · bid tab
  • 2024-05-10 · NDDOT · UGP-6-986(139) · $625.00 per SY · qty 266.0 · bid tab
  • 2024-05-10 · NDDOT · UGP-6-986(139) · $189.00 per SY · qty 1582.0 · bid tab
  • 2024-01-26 · NDDOT · NHU-NH-6-081(098)943 · $200.00 per SY · qty 7639.0 · bid tab
curb gutterEA1$4,100.00$4,100.00 to $4,100.00
Bids
  • 2024-05-10 · NDDOT · UGP-6-986(139) · $4,100.00 per EA · qty 1.0 · bid tab
curb gutterLF15$70.00$6.20 to $170.00
Bids
  • 2026-04-10 · NDDOT · IM-6-029(172)136 · $101.50 per LF · qty 360.0 · bid tab
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $39.00 per LF · qty 12432.0 · bid tab
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $38.30 per LF · qty 9034.0 · bid tab
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $40.50 per LF · qty 833.0 · bid tab
  • 2026-02-27 · NDDOT · NHU-6-297(015)002 · $64.29 per LF · qty 470.0 · bid tab
  • 2026-02-27 · NDDOT · NHU-6-297(015)002 · $33.08 per LF · qty 35.0 · bid tab
  • 2026-02-27 · NDDOT · NHU-6-297(015)002 · $76.87 per LF · qty 186.0 · bid tab
  • 2025-02-07 · NDDOT · UGP-6-986(142) · $44.00 per LF · qty 921.0 · bid tab
  • 2025-02-07 · NDDOT · UGP-6-986(142) · $6.20 per LF · qty 93.0 · bid tab
  • 2024-11-15 · NDDOT · HEN-NHU-6-081(114)942 · $72.00 per LF · qty 288.0 · bid tab
(10 most recent of 15 shown; all in the Hubstake feed)
excavation embankmentCY16$19.00$10.20 to $75.00
Bids
  • 2026-05-08 · NDDOT · BRJ-0018(039) · $11.00 per CY · qty 6428.0 · bid tab
  • 2026-05-08 · NDDOT · BRJ-0018(039) · $24.00 per CY · qty 6092.0 · bid tab
  • 2026-03-27 · NDDOT · BRJ-0018(041) · $12.20 per CY · qty 926.0 · bid tab
  • 2026-03-27 · NDDOT · BRJ-0018(041) · $10.20 per CY · qty 651.0 · bid tab
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $18.00 per CY · qty 29972.0 · bid tab
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $14.00 per CY · qty 95749.0 · bid tab
  • 2025-02-07 · NDDOT · UGP-6-986(142) · $18.00 per CY · qty 1152.0 · bid tab
  • 2024-12-13 · NDDOT · BRC-1802(058) · $40.00 per CY · qty 14.0 · bid tab
  • 2024-12-13 · NDDOT · BRC-1802(058) · $11.80 per CY · qty 4899.0 · bid tab
  • 2024-11-15 · NDDOT · HEN-NHU-6-081(114)942 · $36.00 per CY · qty 142.0 · bid tab
(10 most recent of 16 shown; all in the Hubstake feed)
fire hydrantEA4$11,900.00$1,000.00 to $14,500.00
Bids
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $1,000.00 per EA · qty 1.0 · bid tab
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $14,500.00 per EA · qty 3.0 · bid tab
  • 2025-02-07 · NDDOT · UGP-6-986(142) · $14,500.00 per EA · qty 2.0 · bid tab
  • 2024-01-26 · NDDOT · NHU-NH-6-081(098)943 · $9,300.00 per EA · qty 1.0 · bid tab
flexible baseTON11$40.00$14.00 to $75.09
Bids
  • 2026-06-12 · NDDOT · H-6-032(078)168 · $15.50 per TON · qty 416.0 · bid tab
  • 2026-04-10 · NDDOT · IM-6-029(172)136 · $49.00 per TON · qty 719.0 · bid tab
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $26.00 per TON · qty 38140.0 · bid tab
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $27.00 per TON · qty 7366.0 · bid tab
  • 2026-02-27 · NDDOT · NHU-6-297(015)002 · $75.09 per TON · qty 409.0 · bid tab
  • 2025-02-07 · NDDOT · UGP-6-986(142) · $31.00 per TON · qty 1865.0 · bid tab
  • 2024-12-13 · NDDOT · BRC-1802(058) · $14.00 per TON · qty 1268.0 · bid tab
  • 2024-11-15 · NDDOT · HEN-NHU-6-081(114)942 · $40.00 per TON · qty 158.0 · bid tab
  • 2024-05-10 · NDDOT · UGP-6-986(139) · $48.00 per TON · qty 1683.0 · bid tab
  • 2024-02-16 · NDDOT · SC-1800(023) · $40.00 per TON · qty 404.0 · bid tab
(10 most recent of 11 shown; all in the Hubstake feed)
inlet headwallEA13$6,880.00$3,580.00 to $11,150.00
Bids
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $7,500.00 per EA · qty 3.0 · bid tab
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $4,300.00 per EA · qty 45.0 · bid tab
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $4,400.00 per EA · qty 2.0 · bid tab
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $11,000.00 per EA · qty 1.0 · bid tab
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $11,150.00 per EA · qty 1.0 · bid tab
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $6,650.00 per EA · qty 19.0 · bid tab
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $4,800.00 per EA · qty 6.0 · bid tab
  • 2025-02-07 · NDDOT · UGP-6-986(142) · $7,000.00 per EA · qty 5.0 · bid tab
  • 2024-05-10 · NDDOT · UGP-6-986(139) · $7,500.00 per EA · qty 2.0 · bid tab
  • 2024-01-26 · NDDOT · NHU-NH-6-081(098)943 · $6,880.00 per EA · qty 1.0 · bid tab
(10 most recent of 13 shown; all in the Hubstake feed)
lime cement stabilizationACRE1$1,170.00$1,170.00 to $1,170.00
Bids
  • 2026-06-12 · NDDOT · H-6-032(078)168 · $1,170.00 per ACRE · qty 0.64 · bid tab
lime cement stabilizationEA2$6,650.00$800.00 to $12,500.00
Bids
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $12,500.00 per EA · qty 4.0 · bid tab
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $800.00 per EA · qty 4.0 · bid tab
lime cement stabilizationLF2$105.00$95.00 to $115.00
Bids
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $95.00 per LF · qty 4620.0 · bid tab
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $115.00 per LF · qty 4032.0 · bid tab
manholeEA11$5,350.00$1,500.00 to $17,500.00
Bids
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $4,150.00 per EA · qty 10.0 · bid tab
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $5,350.00 per EA · qty 17.0 · bid tab
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $1,500.00 per EA · qty 7.0 · bid tab
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $7,300.00 per EA · qty 3.0 · bid tab
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $5,950.00 per EA · qty 2.0 · bid tab
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $17,500.00 per EA · qty 1.0 · bid tab
  • 2024-05-10 · NDDOT · UGP-6-986(139) · $16,000.00 per EA · qty 2.0 · bid tab
  • 2024-01-26 · NDDOT · NHU-NH-6-081(098)943 · $3,420.00 per EA · qty 16.0 · bid tab
  • 2024-01-26 · NDDOT · NHU-NH-6-081(098)943 · $5,000.00 per EA · qty 1.0 · bid tab
  • 2024-01-26 · NDDOT · NHU-NH-6-081(098)943 · $4,200.00 per EA · qty 5.0 · bid tab
(10 most recent of 11 shown; all in the Hubstake feed)
sewer main 12-inchLF1$135.00$135.00 to $135.00
Bids
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $135.00 per LF · qty 133.0 · bid tab
sewer main 15-inchLF1$137.00$137.00 to $137.00
Bids
  • 2024-01-26 · NDDOT · NHU-NH-6-081(098)943 · $137.00 per LF · qty 49.0 · bid tab
sidewalkEA5$65.00$26.25 to $80.00
Bids
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $75.00 per EA · qty 7.0 · bid tab
  • 2026-02-27 · NDDOT · NHU-6-297(015)002 · $26.25 per EA · qty 6.0 · bid tab
  • 2025-02-07 · NDDOT · UGP-6-986(142) · $50.00 per EA · qty 12.0 · bid tab
  • 2024-05-10 · NDDOT · UGP-6-986(139) · $80.00 per EA · qty 8.0 · bid tab
  • 2024-02-16 · NDDOT · TAU-6-986(140) · $65.00 per EA · qty 2.0 · bid tab
sidewalkLF3$16.00$8.00 to $16.00
Bids
  • 2026-04-10 · NDDOT · IM-6-029(172)136 · $16.00 per LF · qty 550.0 · bid tab
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $16.00 per LF · qty 524.0 · bid tab
  • 2025-02-07 · NDDOT · UGP-6-986(142) · $8.00 per LF · qty 1195.0 · bid tab
sidewalkSF1$16.75$16.75 to $16.75
Bids
  • 2025-02-07 · NDDOT · UGP-6-986(142) · $16.75 per SF · qty 802.0 · bid tab
sidewalkSY14$137.00$72.50 to $420.00
Bids
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $125.00 per SY · qty 156.0 · bid tab
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $79.50 per SY · qty 6978.0 · bid tab
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $120.00 per SY · qty 791.0 · bid tab
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $73.00 per SY · qty 416.0 · bid tab
  • 2026-02-27 · NDDOT · NHU-6-297(015)002 · $114.87 per SY · qty 138.0 · bid tab
  • 2025-02-07 · NDDOT · UGP-6-986(142) · $208.00 per SY · qty 1092.0 · bid tab
  • 2025-02-07 · NDDOT · UGP-6-986(142) · $100.00 per SY · qty 186.0 · bid tab
  • 2024-05-10 · NDDOT · UGP-6-986(139) · $149.00 per SY · qty 69.0 · bid tab
  • 2024-05-10 · NDDOT · UGP-6-986(139) · $420.00 per SY · qty 307.0 · bid tab
  • 2024-05-10 · NDDOT · UGP-6-986(139) · $179.00 per SY · qty 135.0 · bid tab
(10 most recent of 14 shown; all in the Hubstake feed)
storm pipe 12-inchLF2$142.50$115.00 to $170.00
Bids
  • 2025-02-07 · NDDOT · UGP-6-986(142) · $115.00 per LF · qty 156.0 · bid tab
  • 2024-05-10 · NDDOT · UGP-6-986(139) · $170.00 per LF · qty 16.0 · bid tab
storm pipe 15-inchLF1$115.00$115.00 to $115.00
Bids
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $115.00 per LF · qty 1452.0 · bid tab
storm pipe 18-inchLF2$122.50$120.00 to $125.00
Bids
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $125.00 per LF · qty 94.0 · bid tab
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $120.00 per LF · qty 1537.0 · bid tab
storm pipe 22-inchLF1$180.00$180.00 to $180.00
Bids
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $180.00 per LF · qty 52.0 · bid tab
storm pipe 24-inchLF1$155.00$155.00 to $155.00
Bids
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $155.00 per LF · qty 1113.0 · bid tab
storm pipe 30-inchLF2$342.50$190.00 to $495.00
Bids
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $190.00 per LF · qty 280.0 · bid tab
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $495.00 per LF · qty 148.0 · bid tab
storm pipe 36-inchLF2$270.00$235.00 to $305.00
Bids
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $235.00 per LF · qty 64.0 · bid tab
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $305.00 per LF · qty 116.0 · bid tab
storm pipe 44-inchLF1$395.00$395.00 to $395.00
Bids
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $395.00 per LF · qty 158.0 · bid tab
storm pipe 51-inchLF1$365.00$365.00 to $365.00
Bids
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $365.00 per LF · qty 610.0 · bid tab
storm pipe 54-inchLF1$755.00$755.00 to $755.00
Bids
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $755.00 per LF · qty 14.0 · bid tab
storm pipe 72-inchLF1$895.00$895.00 to $895.00
Bids
  • 2026-05-08 · NDDOT · BRJ-0018(039) · $895.00 per LF · qty 100.0 · bid tab
storm pipe (diameter not stated)LF9$4,030.00$2,736.70 to $6,900.00
Bids
  • 2026-05-08 · NDDOT · BRJ-0018(039) · $4,230.00 per LF · qty 52.0 · bid tab
  • 2026-05-08 · NDDOT · BRJ-0018(039) · $4,640.00 per LF · qty 54.0 · bid tab
  • 2026-05-08 · NDDOT · BRJ-0018(039) · $4,030.00 per LF · qty 52.0 · bid tab
  • 2026-05-08 · NDDOT · BRJ-0018(039) · $2,860.00 per LF · qty 52.0 · bid tab
  • 2026-05-08 · NDDOT · BRJ-0018(039) · $2,736.70 per LF · qty 52.0 · bid tab
  • 2026-05-08 · NDDOT · BRJ-0018(039) · $6,900.00 per LF · qty 124.0 · bid tab
  • 2026-05-08 · NDDOT · BRJ-0018(039) · $3,100.00 per LF · qty 54.0 · bid tab
  • 2026-03-27 · NDDOT · BRJ-0018(041) · $2,800.00 per LF · qty 54.0 · bid tab
  • 2026-03-27 · NDDOT · BRJ-0018(041) · $4,355.00 per LF · qty 54.0 · bid tab
water main 14-inchLF1$145.00$145.00 to $145.00
Bids
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $145.00 per LF · qty 791.0 · bid tab
water main 16-inchLF1$750.00$750.00 to $750.00
Bids
  • 2025-02-07 · NDDOT · UGP-6-986(142) · $750.00 per LF · qty 26.0 · bid tab
water main 20-inchLF1$235.00$235.00 to $235.00
Bids
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $235.00 per LF · qty 2553.0 · bid tab
water main 30-inchLF1$575.00$575.00 to $575.00
Bids
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $575.00 per LF · qty 1583.0 · bid tab
water main 6-inchLF2$123.00$86.00 to $160.00
Bids
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $160.00 per LF · qty 39.0 · bid tab
  • 2024-01-26 · NDDOT · NHU-NH-6-081(098)943 · $86.00 per LF · qty 74.0 · bid tab
water main 8-inchLF1$165.00$165.00 to $165.00
Bids
  • 2026-03-13 · NDDOT · RCE-FTF-NHU-SU-6-297(014)000 · $165.00 per LF · qty 20.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.