| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 5 | $135.00 | $92.00 to $800.00 | Bids- 2024-01-26 · NDDOT · IM-X-5-094(150)000 · $135.00 per TON · qty 3026.0 · bid tab
- 2024-01-26 · NDDOT · IM-X-5-094(150)000 · $100.00 per TON · qty 12045.0 · bid tab
- 2024-01-26 · NDDOT · IM-X-5-094(150)000 · $800.00 per TON · qty 522.0 · bid tab
- 2023-11-17 · NDDOT · SC-1728(056) · $525.00 per TON · qty 742.0 · bid tab
- 2023-11-17 · NDDOT · SC-1728(056) · $92.00 per TON · qty 11400.0 · bid tab
|
| concrete pavement | SY | 1 | $62.18 | $62.18 to $62.18 | Bids- 2024-01-26 · NDDOT · IM-X-5-094(150)000 · $62.18 per SY · qty 222374.0 · bid tab
|
| curb gutter | LF | 1 | $157.66 | $157.66 to $157.66 | Bids- 2024-01-26 · NDDOT · IM-X-5-094(150)000 · $157.66 per LF · qty 15.0 · bid tab
|
| excavation embankment | CY | 4 | $18.78 | $10.74 to $94.00 | Bids- 2024-01-26 · NDDOT · IM-X-5-094(150)000 · $10.74 per CY · qty 47578.0 · bid tab
- 2024-01-26 · NDDOT · IM-X-5-094(150)000 · $15.18 per CY · qty 11609.0 · bid tab
- 2024-01-26 · NDDOT · IM-X-5-094(150)000 · $22.38 per CY · qty 1490.0 · bid tab
- 2023-11-17 · NDDOT · SC-1728(056) · $94.00 per CY · qty 120.0 · bid tab
|
| flexible base | CY | 1 | $205.00 | $205.00 to $205.00 | Bids- 2023-11-17 · NDDOT · SC-1728(056) · $205.00 per CY · qty 120.0 · bid tab
|
| flexible base | TON | 1 | $18.89 | $18.89 to $18.89 | Bids- 2024-01-26 · NDDOT · IM-X-5-094(150)000 · $18.89 per TON · qty 172886.0 · bid tab
|
| inlet headwall | EA | 2 | $12,722.63 | $11,043.16 to $14,402.10 | Bids- 2024-01-26 · NDDOT · IM-X-5-094(150)000 · $11,043.16 per EA · qty 2.0 · bid tab
- 2024-01-26 · NDDOT · IM-X-5-094(150)000 · $14,402.10 per EA · qty 1.0 · bid tab
|
| lime cement stabilization | ACRE | 1 | $475.00 | $475.00 to $475.00 | Bids- 2024-01-26 · NDDOT · IM-X-5-094(150)000 · $475.00 per ACRE · qty 363.3 · bid tab
|
| manhole | EA | 2 | $13,258.95 | $12,951.32 to $13,566.59 | Bids- 2024-01-26 · NDDOT · IM-X-5-094(150)000 · $13,566.59 per EA · qty 1.0 · bid tab
- 2024-01-26 · NDDOT · IM-X-5-094(150)000 · $12,951.32 per EA · qty 1.0 · bid tab
|
| sidewalk | SY | 1 | $197.01 | $197.01 to $197.01 | Bids- 2024-01-26 · NDDOT · IM-X-5-094(150)000 · $197.01 per SY · qty 22.0 · bid tab
|
| storm pipe 18-inch | LF | 1 | $784.70 | $784.70 to $784.70 | Bids- 2024-01-26 · NDDOT · IM-X-5-094(150)000 · $784.70 per LF · qty 62.0 · bid tab
|
| storm pipe 24-inch | LF | 1 | $334.95 | $334.95 to $334.95 | Bids- 2024-01-26 · NDDOT · IM-X-5-094(150)000 · $334.95 per LF · qty 109.5 · bid tab
|
| storm pipe 30-inch | LF | 1 | $425.60 | $425.60 to $425.60 | Bids- 2024-01-26 · NDDOT · IM-X-5-094(150)000 · $425.60 per LF · qty 280.0 · bid tab
|
| storm pipe 36-inch | LF | 1 | $555.10 | $555.10 to $555.10 | Bids- 2024-01-26 · NDDOT · IM-X-5-094(150)000 · $555.10 per LF · qty 90.0 · bid tab
|
| storm pipe 48-inch | LF | 1 | $554.13 | $554.13 to $554.13 | Bids- 2024-01-26 · NDDOT · IM-X-5-094(150)000 · $554.13 per LF · qty 192.0 · bid tab
|
| storm pipe (diameter not stated) | LF | 1 | $5,657.68 | $5,657.68 to $5,657.68 | Bids- 2024-01-26 · NDDOT · IM-X-5-094(150)000 · $5,657.68 per LF · qty 180.0 · bid tab
|