Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON5$89.00$58.00 to $639.50
Bids
  • 2026-04-17 · NDDOT · NH-5-200(035)102 · $639.50 per TON · qty 5468.0 · bid tab
  • 2026-04-17 · NDDOT · NH-5-200(035)102 · $58.00 per TON · qty 121221.0 · bid tab
  • 2024-01-26 · NDDOT · RBD-XA-SS-5-022(142)109 · $74.50 per TON · qty 72414.0 · bid tab
  • 2024-01-26 · NDDOT · RBD-XA-SS-5-022(142)109 · $590.00 per TON · qty 5322.0 · bid tab
  • 2024-01-26 · NDDOT · RBD-XA-SS-5-022(142)109 · $89.00 per TON · qty 19413.0 · bid tab
curb gutterLF4$76.00$57.00 to $81.10
Bids
  • 2026-04-17 · NDDOT · NH-5-200(035)102 · $81.10 per LF · qty 589.0 · bid tab
  • 2024-01-26 · NDDOT · RBD-XA-SS-5-022(142)109 · $57.00 per LF · qty 1134.0 · bid tab
  • 2024-01-26 · NDDOT · RBD-XA-SS-5-022(142)109 · $78.00 per LF · qty 1509.0 · bid tab
  • 2024-01-26 · NDDOT · RBD-XA-SS-5-022(142)109 · $74.00 per LF · qty 110.0 · bid tab
excavation embankmentCY8$30.75$5.25 to $63.00
Bids
  • 2026-04-17 · NDDOT · NH-5-200(035)102 · $9.00 per CY · qty 15285.0 · bid tab
  • 2026-04-17 · NDDOT · NH-5-200(035)102 · $35.00 per CY · qty 1469.0 · bid tab
  • 2026-04-17 · NDDOT · NH-5-200(035)102 · $29.50 per CY · qty 4352.0 · bid tab
  • 2026-04-17 · NDDOT · NH-5-200(035)102 · $32.00 per CY · qty 11584.0 · bid tab
  • 2026-01-16 · NDDOT · SERP-5-022(150)123 · $43.00 per CY · qty 2527.0 · bid tab
  • 2026-01-16 · NDDOT · SERP-5-022(150)123 · $63.00 per CY · qty 1954.0 · bid tab
  • 2024-01-26 · NDDOT · RBD-XA-SS-5-022(142)109 · $5.25 per CY · qty 3196.0 · bid tab
  • 2024-01-26 · NDDOT · RBD-XA-SS-5-022(142)109 · $16.50 per CY · qty 3846.0 · bid tab
flexible baseTON2$44.20$40.40 to $48.00
Bids
  • 2026-04-17 · NDDOT · NH-5-200(035)102 · $40.40 per TON · qty 6506.0 · bid tab
  • 2024-01-26 · NDDOT · RBD-XA-SS-5-022(142)109 · $48.00 per TON · qty 10787.0 · bid tab
inlet headwallEA1$9,031.34$9,031.34 to $9,031.34
Bids
  • 2026-04-17 · NDDOT · NH-5-200(035)102 · $9,031.34 per EA · qty 3.0 · bid tab
inlet headwallLF1$442.02$442.02 to $442.02
Bids
  • 2026-04-17 · NDDOT · NH-5-200(035)102 · $442.02 per LF · qty 20.0 · bid tab
lime cement stabilizationACRE2$294.51$189.03 to $400.00
Bids
  • 2026-04-17 · NDDOT · NH-5-200(035)102 · $189.03 per ACRE · qty 99.003 · bid tab
  • 2026-01-16 · NDDOT · SERP-5-022(150)123 · $400.00 per ACRE · qty 3.9 · bid tab
lime cement stabilizationEA2$1,250.00$1,000.00 to $1,500.00
Bids
  • 2026-01-16 · NDDOT · SERP-5-022(150)123 · $1,500.00 per EA · qty 2.0 · bid tab
  • 2026-01-16 · NDDOT · SERP-5-022(150)123 · $1,000.00 per EA · qty 2.0 · bid tab
lime cement stabilizationSY1$2.32$2.32 to $2.32
Bids
  • 2026-04-17 · NDDOT · NH-5-200(035)102 · $2.32 per SY · qty 419170.0 · bid tab
sidewalkEA3$75.00$65.00 to $6,848.83
Bids
  • 2026-04-17 · NDDOT · NH-5-200(035)102 · $65.00 per EA · qty 13.0 · bid tab
  • 2026-04-17 · NDDOT · NH-5-200(035)102 · $6,848.83 per EA · qty 1.0 · bid tab
  • 2024-01-26 · NDDOT · RBD-XA-SS-5-022(142)109 · $75.00 per EA · qty 230.0 · bid tab
sidewalkLF2$16.38$14.75 to $18.00
Bids
  • 2026-04-17 · NDDOT · NH-5-200(035)102 · $18.00 per LF · qty 274.0 · bid tab
  • 2024-01-26 · NDDOT · RBD-XA-SS-5-022(142)109 · $14.75 per LF · qty 75.0 · bid tab
sidewalkSY5$156.00$113.86 to $240.00
Bids
  • 2026-04-17 · NDDOT · NH-5-200(035)102 · $113.86 per SY · qty 521.0 · bid tab
  • 2024-01-26 · NDDOT · RBD-XA-SS-5-022(142)109 · $156.00 per SY · qty 135.0 · bid tab
  • 2024-01-26 · NDDOT · RBD-XA-SS-5-022(142)109 · $135.00 per SY · qty 1067.0 · bid tab
  • 2024-01-26 · NDDOT · RBD-XA-SS-5-022(142)109 · $240.00 per SY · qty 147.0 · bid tab
  • 2024-01-26 · NDDOT · RBD-XA-SS-5-022(142)109 · $187.00 per SY · qty 36.0 · bid tab
storm pipe 24-inchLF2$584.00$318.00 to $850.00
Bids
  • 2026-04-17 · NDDOT · NH-5-200(035)102 · $318.00 per LF · qty 24.0 · bid tab
  • 2024-01-26 · NDDOT · RBD-XA-SS-5-022(142)109 · $850.00 per LF · qty 4.0 · bid tab
storm pipe 30-inchLF2$296.00$294.00 to $298.00
Bids
  • 2026-04-17 · NDDOT · NH-5-200(035)102 · $298.00 per LF · qty 30.0 · bid tab
  • 2026-04-17 · NDDOT · NH-5-200(035)102 · $294.00 per LF · qty 36.0 · bid tab
storm pipe 60-inchLF1$687.00$687.00 to $687.00
Bids
  • 2026-04-17 · NDDOT · NH-5-200(035)102 · $687.00 per LF · qty 42.0 · bid tab
storm pipe (diameter not stated)LF3$3,485.00$3,300.00 to $3,550.00
Bids
  • 2026-04-17 · NDDOT · NH-5-200(035)102 · $3,550.00 per LF · qty 110.0 · bid tab
  • 2026-04-17 · NDDOT · NH-5-200(035)102 · $3,485.00 per LF · qty 112.0 · bid tab
  • 2026-04-17 · NDDOT · NH-5-200(035)102 · $3,300.00 per LF · qty 148.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.