| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 5 | $89.00 | $58.00 to $639.50 | Bids- 2026-04-17 · NDDOT · NH-5-200(035)102 · $639.50 per TON · qty 5468.0 · bid tab
- 2026-04-17 · NDDOT · NH-5-200(035)102 · $58.00 per TON · qty 121221.0 · bid tab
- 2024-01-26 · NDDOT · RBD-XA-SS-5-022(142)109 · $74.50 per TON · qty 72414.0 · bid tab
- 2024-01-26 · NDDOT · RBD-XA-SS-5-022(142)109 · $590.00 per TON · qty 5322.0 · bid tab
- 2024-01-26 · NDDOT · RBD-XA-SS-5-022(142)109 · $89.00 per TON · qty 19413.0 · bid tab
|
| curb gutter | LF | 4 | $76.00 | $57.00 to $81.10 | Bids- 2026-04-17 · NDDOT · NH-5-200(035)102 · $81.10 per LF · qty 589.0 · bid tab
- 2024-01-26 · NDDOT · RBD-XA-SS-5-022(142)109 · $57.00 per LF · qty 1134.0 · bid tab
- 2024-01-26 · NDDOT · RBD-XA-SS-5-022(142)109 · $78.00 per LF · qty 1509.0 · bid tab
- 2024-01-26 · NDDOT · RBD-XA-SS-5-022(142)109 · $74.00 per LF · qty 110.0 · bid tab
|
| excavation embankment | CY | 8 | $30.75 | $5.25 to $63.00 | Bids- 2026-04-17 · NDDOT · NH-5-200(035)102 · $9.00 per CY · qty 15285.0 · bid tab
- 2026-04-17 · NDDOT · NH-5-200(035)102 · $35.00 per CY · qty 1469.0 · bid tab
- 2026-04-17 · NDDOT · NH-5-200(035)102 · $29.50 per CY · qty 4352.0 · bid tab
- 2026-04-17 · NDDOT · NH-5-200(035)102 · $32.00 per CY · qty 11584.0 · bid tab
- 2026-01-16 · NDDOT · SERP-5-022(150)123 · $43.00 per CY · qty 2527.0 · bid tab
- 2026-01-16 · NDDOT · SERP-5-022(150)123 · $63.00 per CY · qty 1954.0 · bid tab
- 2024-01-26 · NDDOT · RBD-XA-SS-5-022(142)109 · $5.25 per CY · qty 3196.0 · bid tab
- 2024-01-26 · NDDOT · RBD-XA-SS-5-022(142)109 · $16.50 per CY · qty 3846.0 · bid tab
|
| flexible base | TON | 2 | $44.20 | $40.40 to $48.00 | Bids- 2026-04-17 · NDDOT · NH-5-200(035)102 · $40.40 per TON · qty 6506.0 · bid tab
- 2024-01-26 · NDDOT · RBD-XA-SS-5-022(142)109 · $48.00 per TON · qty 10787.0 · bid tab
|
| inlet headwall | EA | 1 | $9,031.34 | $9,031.34 to $9,031.34 | Bids- 2026-04-17 · NDDOT · NH-5-200(035)102 · $9,031.34 per EA · qty 3.0 · bid tab
|
| inlet headwall | LF | 1 | $442.02 | $442.02 to $442.02 | Bids- 2026-04-17 · NDDOT · NH-5-200(035)102 · $442.02 per LF · qty 20.0 · bid tab
|
| lime cement stabilization | ACRE | 2 | $294.51 | $189.03 to $400.00 | Bids- 2026-04-17 · NDDOT · NH-5-200(035)102 · $189.03 per ACRE · qty 99.003 · bid tab
- 2026-01-16 · NDDOT · SERP-5-022(150)123 · $400.00 per ACRE · qty 3.9 · bid tab
|
| lime cement stabilization | EA | 2 | $1,250.00 | $1,000.00 to $1,500.00 | Bids- 2026-01-16 · NDDOT · SERP-5-022(150)123 · $1,500.00 per EA · qty 2.0 · bid tab
- 2026-01-16 · NDDOT · SERP-5-022(150)123 · $1,000.00 per EA · qty 2.0 · bid tab
|
| lime cement stabilization | SY | 1 | $2.32 | $2.32 to $2.32 | Bids- 2026-04-17 · NDDOT · NH-5-200(035)102 · $2.32 per SY · qty 419170.0 · bid tab
|
| sidewalk | EA | 3 | $75.00 | $65.00 to $6,848.83 | Bids- 2026-04-17 · NDDOT · NH-5-200(035)102 · $65.00 per EA · qty 13.0 · bid tab
- 2026-04-17 · NDDOT · NH-5-200(035)102 · $6,848.83 per EA · qty 1.0 · bid tab
- 2024-01-26 · NDDOT · RBD-XA-SS-5-022(142)109 · $75.00 per EA · qty 230.0 · bid tab
|
| sidewalk | LF | 2 | $16.38 | $14.75 to $18.00 | Bids- 2026-04-17 · NDDOT · NH-5-200(035)102 · $18.00 per LF · qty 274.0 · bid tab
- 2024-01-26 · NDDOT · RBD-XA-SS-5-022(142)109 · $14.75 per LF · qty 75.0 · bid tab
|
| sidewalk | SY | 5 | $156.00 | $113.86 to $240.00 | Bids- 2026-04-17 · NDDOT · NH-5-200(035)102 · $113.86 per SY · qty 521.0 · bid tab
- 2024-01-26 · NDDOT · RBD-XA-SS-5-022(142)109 · $156.00 per SY · qty 135.0 · bid tab
- 2024-01-26 · NDDOT · RBD-XA-SS-5-022(142)109 · $135.00 per SY · qty 1067.0 · bid tab
- 2024-01-26 · NDDOT · RBD-XA-SS-5-022(142)109 · $240.00 per SY · qty 147.0 · bid tab
- 2024-01-26 · NDDOT · RBD-XA-SS-5-022(142)109 · $187.00 per SY · qty 36.0 · bid tab
|
| storm pipe 24-inch | LF | 2 | $584.00 | $318.00 to $850.00 | Bids- 2026-04-17 · NDDOT · NH-5-200(035)102 · $318.00 per LF · qty 24.0 · bid tab
- 2024-01-26 · NDDOT · RBD-XA-SS-5-022(142)109 · $850.00 per LF · qty 4.0 · bid tab
|
| storm pipe 30-inch | LF | 2 | $296.00 | $294.00 to $298.00 | Bids- 2026-04-17 · NDDOT · NH-5-200(035)102 · $298.00 per LF · qty 30.0 · bid tab
- 2026-04-17 · NDDOT · NH-5-200(035)102 · $294.00 per LF · qty 36.0 · bid tab
|
| storm pipe 60-inch | LF | 1 | $687.00 | $687.00 to $687.00 | Bids- 2026-04-17 · NDDOT · NH-5-200(035)102 · $687.00 per LF · qty 42.0 · bid tab
|
| storm pipe (diameter not stated) | LF | 3 | $3,485.00 | $3,300.00 to $3,550.00 | Bids- 2026-04-17 · NDDOT · NH-5-200(035)102 · $3,550.00 per LF · qty 110.0 · bid tab
- 2026-04-17 · NDDOT · NH-5-200(035)102 · $3,485.00 per LF · qty 112.0 · bid tab
- 2026-04-17 · NDDOT · NH-5-200(035)102 · $3,300.00 per LF · qty 148.0 · bid tab
|