Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON4$376.65$140.00 to $700.00
Bids
  • 2025-04-25 · NDDOT · SS-FTF-5-999(036) · $203.30 per TON · qty 1613.0 · bid tab
  • 2024-09-06 · NDDOT · SS-5-094(152)900 · $140.00 per TON · qty 9720.0 · bid tab
  • 2024-09-06 · NDDOT · SS-5-094(152)900 · $550.00 per TON · qty 955.0 · bid tab
  • 2024-09-06 · NDDOT · SS-5-094(152)900 · $700.00 per TON · qty 584.0 · bid tab
concrete pavementSY3$140.31$103.58 to $193.36
Bids
  • 2025-04-25 · NDDOT · SS-FTF-5-999(036) · $103.58 per SY · qty 23286.0 · bid tab
  • 2024-09-06 · NDDOT · SS-5-094(152)900 · $193.36 per SY · qty 535.0 · bid tab
  • 2024-09-06 · NDDOT · SS-5-094(152)900 · $140.31 per SY · qty 2737.0 · bid tab
curb gutterLF7$74.17$12.00 to $86.49
Bids
  • 2026-05-08 · NDDOT · TAC-0434(059) · $86.49 per LF · qty 54.0 · bid tab
  • 2025-04-25 · NDDOT · SS-FTF-5-999(036) · $55.61 per LF · qty 852.0 · bid tab
  • 2024-09-06 · NDDOT · SS-5-094(152)900 · $76.25 per LF · qty 364.0 · bid tab
  • 2024-09-06 · NDDOT · SS-5-094(152)900 · $73.32 per LF · qty 6728.0 · bid tab
  • 2024-09-06 · NDDOT · SS-5-094(152)900 · $78.70 per LF · qty 337.0 · bid tab
  • 2024-09-06 · NDDOT · SS-5-094(152)900 · $74.17 per LF · qty 874.0 · bid tab
  • 2024-09-06 · NDDOT · SS-5-094(152)900 · $12.00 per LF · qty 2033.0 · bid tab
excavation embankmentCY7$14.94$6.03 to $40.00
Bids
  • 2026-07-17 · NDDOT · BRJ-0004(057) · $6.03 per CY · qty 4286.0 · bid tab
  • 2026-05-08 · NDDOT · TAC-0434(059) · $14.94 per CY · qty 125.0 · bid tab
  • 2026-05-08 · NDDOT · TAC-0434(059) · $22.21 per CY · qty 14337.0 · bid tab
  • 2025-04-25 · NDDOT · SS-FTF-5-999(036) · $11.36 per CY · qty 36786.0 · bid tab
  • 2025-04-25 · NDDOT · SS-FTF-5-999(036) · $14.05 per CY · qty 52696.0 · bid tab
  • 2024-09-06 · NDDOT · SS-5-094(152)900 · $40.00 per CY · qty 10427.0 · bid tab
  • 2024-09-06 · NDDOT · SS-5-094(152)900 · $38.00 per CY · qty 2429.0 · bid tab
flexible baseTON3$60.06$37.14 to $75.00
Bids
  • 2026-05-08 · NDDOT · TAC-0434(059) · $60.06 per TON · qty 1801.6 · bid tab
  • 2025-04-25 · NDDOT · SS-FTF-5-999(036) · $37.14 per TON · qty 19978.0 · bid tab
  • 2024-09-06 · NDDOT · SS-5-094(152)900 · $75.00 per TON · qty 14705.0 · bid tab
inlet headwallEA7$8,563.97$3,800.00 to $10,500.00
Bids
  • 2025-04-25 · NDDOT · SS-FTF-5-999(036) · $8,563.97 per EA · qty 1.0 · bid tab
  • 2025-04-25 · NDDOT · SS-FTF-5-999(036) · $9,308.53 per EA · qty 1.0 · bid tab
  • 2024-09-06 · NDDOT · SS-5-094(152)900 · $5,000.00 per EA · qty 1.0 · bid tab
  • 2024-09-06 · NDDOT · SS-5-094(152)900 · $8,000.00 per EA · qty 11.0 · bid tab
  • 2024-09-06 · NDDOT · SS-5-094(152)900 · $10,500.00 per EA · qty 3.0 · bid tab
  • 2024-09-06 · NDDOT · SS-5-094(152)900 · $3,800.00 per EA · qty 4.0 · bid tab
  • 2024-09-06 · NDDOT · SS-5-094(152)900 · $10,000.00 per EA · qty 3.0 · bid tab
lime cement stabilizationACRE1$1,048.60$1,048.60 to $1,048.60
Bids
  • 2025-04-25 · NDDOT · SS-FTF-5-999(036) · $1,048.60 per ACRE · qty 61.1 · bid tab
lime cement stabilizationEA3$11,347.50$2,865.00 to $18,710.84
Bids
  • 2025-04-25 · NDDOT · SS-FTF-5-999(036) · $11,347.50 per EA · qty 1.0 · bid tab
  • 2025-04-25 · NDDOT · SS-FTF-5-999(036) · $2,865.00 per EA · qty 1.0 · bid tab
  • 2024-09-06 · NDDOT · SS-5-094(152)900 · $18,710.84 per EA · qty 2.0 · bid tab
manholeEA6$8,000.00$1,753.50 to $12,313.41
Bids
  • 2025-04-25 · NDDOT · SS-FTF-5-999(036) · $10,915.31 per EA · qty 1.0 · bid tab
  • 2025-04-25 · NDDOT · SS-FTF-5-999(036) · $12,313.41 per EA · qty 2.0 · bid tab
  • 2025-04-25 · NDDOT · SS-FTF-5-999(036) · $1,753.50 per EA · qty 1.0 · bid tab
  • 2024-09-06 · NDDOT · SS-5-094(152)900 · $8,000.00 per EA · qty 5.0 · bid tab
  • 2024-09-06 · NDDOT · SS-5-094(152)900 · $7,000.00 per EA · qty 1.0 · bid tab
  • 2024-09-06 · NDDOT · SS-5-094(152)900 · $8,000.00 per EA · qty 1.0 · bid tab
sidewalkEA1$100.00$100.00 to $100.00
Bids
  • 2024-09-06 · NDDOT · SS-5-094(152)900 · $100.00 per EA · qty 9.0 · bid tab
sidewalkLF1$15.00$15.00 to $15.00
Bids
  • 2024-09-06 · NDDOT · SS-5-094(152)900 · $15.00 per LF · qty 1356.0 · bid tab
sidewalkSY6$129.06$65.75 to $183.52
Bids
  • 2026-05-08 · NDDOT · TAC-0434(059) · $149.64 per SY · qty 127.0 · bid tab
  • 2026-05-08 · NDDOT · TAC-0434(059) · $65.75 per SY · qty 7594.0 · bid tab
  • 2025-04-25 · NDDOT · SS-FTF-5-999(036) · $183.52 per SY · qty 630.0 · bid tab
  • 2025-04-25 · NDDOT · SS-FTF-5-999(036) · $73.58 per SY · qty 4915.0 · bid tab
  • 2024-09-06 · NDDOT · SS-5-094(152)900 · $119.71 per SY · qty 3821.0 · bid tab
  • 2024-09-06 · NDDOT · SS-5-094(152)900 · $138.40 per SY · qty 297.0 · bid tab
storm pipe 72-inchLF1$2,378.38$2,378.38 to $2,378.38
Bids
  • 2026-05-08 · NDDOT · TAC-0434(059) · $2,378.38 per LF · qty 8.0 · bid tab
storm pipe (diameter not stated)LF2$3,431.33$1,669.72 to $5,192.94
Bids
  • 2026-07-17 · NDDOT · BRJ-0004(057) · $5,192.94 per LF · qty 57.0 · bid tab
  • 2026-02-06 · NDDOT · IM-5-094(170)023 · $1,669.72 per LF · qty 540.0 · bid tab
water main 6-inchLF1$223.63$223.63 to $223.63
Bids
  • 2025-04-25 · NDDOT · SS-FTF-5-999(036) · $223.63 per LF · qty 203.0 · bid tab
water serviceLF2$173.34$167.99 to $178.69
Bids
  • 2025-04-25 · NDDOT · SS-FTF-5-999(036) · $178.69 per LF · qty 187.0 · bid tab
  • 2025-04-25 · NDDOT · SS-FTF-5-999(036) · $167.99 per LF · qty 187.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.