| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 4 | $376.65 | $140.00 to $700.00 | Bids- 2025-04-25 · NDDOT · SS-FTF-5-999(036) · $203.30 per TON · qty 1613.0 · bid tab
- 2024-09-06 · NDDOT · SS-5-094(152)900 · $140.00 per TON · qty 9720.0 · bid tab
- 2024-09-06 · NDDOT · SS-5-094(152)900 · $550.00 per TON · qty 955.0 · bid tab
- 2024-09-06 · NDDOT · SS-5-094(152)900 · $700.00 per TON · qty 584.0 · bid tab
|
| concrete pavement | SY | 3 | $140.31 | $103.58 to $193.36 | Bids- 2025-04-25 · NDDOT · SS-FTF-5-999(036) · $103.58 per SY · qty 23286.0 · bid tab
- 2024-09-06 · NDDOT · SS-5-094(152)900 · $193.36 per SY · qty 535.0 · bid tab
- 2024-09-06 · NDDOT · SS-5-094(152)900 · $140.31 per SY · qty 2737.0 · bid tab
|
| curb gutter | LF | 7 | $74.17 | $12.00 to $86.49 | Bids- 2026-05-08 · NDDOT · TAC-0434(059) · $86.49 per LF · qty 54.0 · bid tab
- 2025-04-25 · NDDOT · SS-FTF-5-999(036) · $55.61 per LF · qty 852.0 · bid tab
- 2024-09-06 · NDDOT · SS-5-094(152)900 · $76.25 per LF · qty 364.0 · bid tab
- 2024-09-06 · NDDOT · SS-5-094(152)900 · $73.32 per LF · qty 6728.0 · bid tab
- 2024-09-06 · NDDOT · SS-5-094(152)900 · $78.70 per LF · qty 337.0 · bid tab
- 2024-09-06 · NDDOT · SS-5-094(152)900 · $74.17 per LF · qty 874.0 · bid tab
- 2024-09-06 · NDDOT · SS-5-094(152)900 · $12.00 per LF · qty 2033.0 · bid tab
|
| excavation embankment | CY | 7 | $14.94 | $6.03 to $40.00 | Bids- 2026-07-17 · NDDOT · BRJ-0004(057) · $6.03 per CY · qty 4286.0 · bid tab
- 2026-05-08 · NDDOT · TAC-0434(059) · $14.94 per CY · qty 125.0 · bid tab
- 2026-05-08 · NDDOT · TAC-0434(059) · $22.21 per CY · qty 14337.0 · bid tab
- 2025-04-25 · NDDOT · SS-FTF-5-999(036) · $11.36 per CY · qty 36786.0 · bid tab
- 2025-04-25 · NDDOT · SS-FTF-5-999(036) · $14.05 per CY · qty 52696.0 · bid tab
- 2024-09-06 · NDDOT · SS-5-094(152)900 · $40.00 per CY · qty 10427.0 · bid tab
- 2024-09-06 · NDDOT · SS-5-094(152)900 · $38.00 per CY · qty 2429.0 · bid tab
|
| flexible base | TON | 3 | $60.06 | $37.14 to $75.00 | Bids- 2026-05-08 · NDDOT · TAC-0434(059) · $60.06 per TON · qty 1801.6 · bid tab
- 2025-04-25 · NDDOT · SS-FTF-5-999(036) · $37.14 per TON · qty 19978.0 · bid tab
- 2024-09-06 · NDDOT · SS-5-094(152)900 · $75.00 per TON · qty 14705.0 · bid tab
|
| inlet headwall | EA | 7 | $8,563.97 | $3,800.00 to $10,500.00 | Bids- 2025-04-25 · NDDOT · SS-FTF-5-999(036) · $8,563.97 per EA · qty 1.0 · bid tab
- 2025-04-25 · NDDOT · SS-FTF-5-999(036) · $9,308.53 per EA · qty 1.0 · bid tab
- 2024-09-06 · NDDOT · SS-5-094(152)900 · $5,000.00 per EA · qty 1.0 · bid tab
- 2024-09-06 · NDDOT · SS-5-094(152)900 · $8,000.00 per EA · qty 11.0 · bid tab
- 2024-09-06 · NDDOT · SS-5-094(152)900 · $10,500.00 per EA · qty 3.0 · bid tab
- 2024-09-06 · NDDOT · SS-5-094(152)900 · $3,800.00 per EA · qty 4.0 · bid tab
- 2024-09-06 · NDDOT · SS-5-094(152)900 · $10,000.00 per EA · qty 3.0 · bid tab
|
| lime cement stabilization | ACRE | 1 | $1,048.60 | $1,048.60 to $1,048.60 | Bids- 2025-04-25 · NDDOT · SS-FTF-5-999(036) · $1,048.60 per ACRE · qty 61.1 · bid tab
|
| lime cement stabilization | EA | 3 | $11,347.50 | $2,865.00 to $18,710.84 | Bids- 2025-04-25 · NDDOT · SS-FTF-5-999(036) · $11,347.50 per EA · qty 1.0 · bid tab
- 2025-04-25 · NDDOT · SS-FTF-5-999(036) · $2,865.00 per EA · qty 1.0 · bid tab
- 2024-09-06 · NDDOT · SS-5-094(152)900 · $18,710.84 per EA · qty 2.0 · bid tab
|
| manhole | EA | 6 | $8,000.00 | $1,753.50 to $12,313.41 | Bids- 2025-04-25 · NDDOT · SS-FTF-5-999(036) · $10,915.31 per EA · qty 1.0 · bid tab
- 2025-04-25 · NDDOT · SS-FTF-5-999(036) · $12,313.41 per EA · qty 2.0 · bid tab
- 2025-04-25 · NDDOT · SS-FTF-5-999(036) · $1,753.50 per EA · qty 1.0 · bid tab
- 2024-09-06 · NDDOT · SS-5-094(152)900 · $8,000.00 per EA · qty 5.0 · bid tab
- 2024-09-06 · NDDOT · SS-5-094(152)900 · $7,000.00 per EA · qty 1.0 · bid tab
- 2024-09-06 · NDDOT · SS-5-094(152)900 · $8,000.00 per EA · qty 1.0 · bid tab
|
| sidewalk | EA | 1 | $100.00 | $100.00 to $100.00 | Bids- 2024-09-06 · NDDOT · SS-5-094(152)900 · $100.00 per EA · qty 9.0 · bid tab
|
| sidewalk | LF | 1 | $15.00 | $15.00 to $15.00 | Bids- 2024-09-06 · NDDOT · SS-5-094(152)900 · $15.00 per LF · qty 1356.0 · bid tab
|
| sidewalk | SY | 6 | $129.06 | $65.75 to $183.52 | Bids- 2026-05-08 · NDDOT · TAC-0434(059) · $149.64 per SY · qty 127.0 · bid tab
- 2026-05-08 · NDDOT · TAC-0434(059) · $65.75 per SY · qty 7594.0 · bid tab
- 2025-04-25 · NDDOT · SS-FTF-5-999(036) · $183.52 per SY · qty 630.0 · bid tab
- 2025-04-25 · NDDOT · SS-FTF-5-999(036) · $73.58 per SY · qty 4915.0 · bid tab
- 2024-09-06 · NDDOT · SS-5-094(152)900 · $119.71 per SY · qty 3821.0 · bid tab
- 2024-09-06 · NDDOT · SS-5-094(152)900 · $138.40 per SY · qty 297.0 · bid tab
|
| storm pipe 72-inch | LF | 1 | $2,378.38 | $2,378.38 to $2,378.38 | Bids- 2026-05-08 · NDDOT · TAC-0434(059) · $2,378.38 per LF · qty 8.0 · bid tab
|
| storm pipe (diameter not stated) | LF | 2 | $3,431.33 | $1,669.72 to $5,192.94 | Bids- 2026-07-17 · NDDOT · BRJ-0004(057) · $5,192.94 per LF · qty 57.0 · bid tab
- 2026-02-06 · NDDOT · IM-5-094(170)023 · $1,669.72 per LF · qty 540.0 · bid tab
|
| water main 6-inch | LF | 1 | $223.63 | $223.63 to $223.63 | Bids- 2025-04-25 · NDDOT · SS-FTF-5-999(036) · $223.63 per LF · qty 203.0 · bid tab
|
| water service | LF | 2 | $173.34 | $167.99 to $178.69 | Bids- 2025-04-25 · NDDOT · SS-FTF-5-999(036) · $178.69 per LF · qty 187.0 · bid tab
- 2025-04-25 · NDDOT · SS-FTF-5-999(036) · $167.99 per LF · qty 187.0 · bid tab
|