Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON19$200.00$55.50 to $851.00
Bids
  • 2026-05-08 · NDDOT · BIP-FXBA-BRP-0200(050) · $247.00 per TON · qty 347.0 · bid tab
  • 2026-05-08 · NDDOT · SC-FXCA-0211(059) · $58.50 per TON · qty 49971.0 · bid tab
  • 2026-05-08 · NDDOT · SC-FXCA-0211(059) · $560.00 per TON · qty 2812.0 · bid tab
  • 2026-04-10 · NDDOT · H-CP-2-999(081) · $147.00 per TON · qty 189.0 · bid tab
  • 2026-02-27 · NDDOT · SS-2-999(069) · $200.00 per TON · qty 437.0 · bid tab
  • 2025-05-09 · NDDOT · CERP-0221(085) · $252.00 per TON · qty 208.0 · bid tab
  • 2025-04-25 · NDDOT · CERP-0221(084) · $182.00 per TON · qty 349.0 · bid tab
  • 2025-03-21 · NDDOT · IM-2-094(198)304 · $55.50 per TON · qty 9509.0 · bid tab
  • 2025-03-21 · NDDOT · IM-2-094(198)304 · $575.00 per TON · qty 571.0 · bid tab
  • 2025-02-07 · NDDOT · CERP-0204(055) · $85.00 per TON · qty 1940.0 · bid tab
(10 most recent of 19 shown; all in the Hubstake feed)
concrete pavementSY2$208.00$200.00 to $216.00
Bids
  • 2024-01-26 · NDDOT · IM-NHU-2-094(159)290 · $216.00 per SY · qty 499.0 · bid tab
  • 2023-11-17 · NDDOT · UGP-2-990(067) · $200.00 per SY · qty 40.0 · bid tab
curb gutterEA1$8,600.00$8,600.00 to $8,600.00
Bids
  • 2026-05-08 · NDDOT · BIP-FXBA-BRP-0200(050) · $8,600.00 per EA · qty 1.0 · bid tab
curb gutterLF8$57.70$10.00 to $100.00
Bids
  • 2026-05-08 · NDDOT · BIP-FXBA-BRP-0200(050) · $84.00 per LF · qty 499.0 · bid tab
  • 2025-05-09 · NDDOT · CERP-0221(085) · $100.00 per LF · qty 316.0 · bid tab
  • 2025-03-21 · NDDOT · IM-2-094(198)304 · $40.00 per LF · qty 1527.0 · bid tab
  • 2025-03-21 · NDDOT · TAU-2-990(066) · $82.00 per LF · qty 128.0 · bid tab
  • 2024-01-26 · NDDOT · IM-NHU-2-094(159)290 · $55.40 per LF · qty 3401.0 · bid tab
  • 2023-11-17 · NDDOT · UGP-2-990(067) · $55.00 per LF · qty 3521.0 · bid tab
  • 2023-11-17 · NDDOT · UGP-2-990(067) · $60.00 per LF · qty 200.0 · bid tab
  • 2023-11-17 · NDDOT · UGP-2-990(067) · $10.00 per LF · qty 1200.0 · bid tab
excavation embankmentCY25$18.45$3.90 to $142.00
Bids
  • 2026-05-08 · NDDOT · BIP-FXBA-BRP-0200(050) · $37.00 per CY · qty 70.0 · bid tab
  • 2026-05-08 · NDDOT · BIP-FXBA-BRP-0200(050) · $26.25 per CY · qty 77.0 · bid tab
  • 2026-05-08 · NDDOT · SC-FXCA-0211(059) · $50.00 per CY · qty 1745.0 · bid tab
  • 2026-02-27 · NDDOT · SS-2-999(069) · $25.00 per CY · qty 223.0 · bid tab
  • 2026-02-06 · NDDOT · BRJ-0002(053) · $20.00 per CY · qty 1015.0 · bid tab
  • 2026-02-06 · NDDOT · BRJ-0002(053) · $20.00 per CY · qty 315.0 · bid tab
  • 2025-05-09 · NDDOT · CERP-0221(085) · $60.00 per CY · qty 23.0 · bid tab
  • 2025-05-09 · NDDOT · CERP-0221(085) · $40.00 per CY · qty 160.0 · bid tab
  • 2025-05-09 · NDDOT · CERP-0221(085) · $30.00 per CY · qty 199.0 · bid tab
  • 2025-04-25 · NDDOT · CERP-0221(084) · $5.90 per CY · qty 7300.0 · bid tab
(10 most recent of 25 shown; all in the Hubstake feed)
fire hydrantEA4$7,930.00$600.00 to $10,350.00
Bids
  • 2026-05-08 · NDDOT · BIP-FXBA-BRP-0200(050) · $10,350.00 per EA · qty 1.0 · bid tab
  • 2024-01-26 · NDDOT · IM-NHU-2-094(159)290 · $7,860.00 per EA · qty 4.0 · bid tab
  • 2024-01-26 · NDDOT · IM-NHU-2-094(159)290 · $600.00 per EA · qty 2.0 · bid tab
  • 2023-11-17 · NDDOT · UGP-2-990(067) · $8,000.00 per EA · qty 2.0 · bid tab
flexible baseCY4$81.70$60.00 to $200.00
Bids
  • 2026-05-08 · NDDOT · BIP-FXBA-BRP-0200(050) · $70.00 per CY · qty 490.0 · bid tab
  • 2025-03-21 · NDDOT · TAU-2-990(066) · $93.40 per CY · qty 218.0 · bid tab
  • 2023-11-17 · NDDOT · TAC-2-990(065) · $200.00 per CY · qty 156.0 · bid tab
  • 2023-11-17 · NDDOT · UGP-2-990(067) · $60.00 per CY · qty 3688.0 · bid tab
flexible baseTON9$22.00$12.10 to $65.00
Bids
  • 2026-04-10 · NDDOT · H-CP-2-999(081) · $60.00 per TON · qty 58.0 · bid tab
  • 2026-02-27 · NDDOT · SS-2-999(069) · $30.30 per TON · qty 581.0 · bid tab
  • 2025-05-09 · NDDOT · CERP-0221(085) · $65.00 per TON · qty 111.0 · bid tab
  • 2025-04-25 · NDDOT · CERP-0221(084) · $19.50 per TON · qty 760.0 · bid tab
  • 2025-03-21 · NDDOT · IM-2-094(198)304 · $22.00 per TON · qty 30077.0 · bid tab
  • 2025-02-07 · NDDOT · CERP-0204(055) · $22.00 per TON · qty 5773.0 · bid tab
  • 2024-01-26 · NDDOT · IM-NHU-2-094(159)290 · $12.10 per TON · qty 4327.0 · bid tab
  • 2024-01-26 · NDDOT · IM-NHU-2-094(159)290 · $25.05 per TON · qty 776.0 · bid tab
  • 2023-11-17 · NDDOT · HES-2-009(023)041 · $21.60 per TON · qty 7724.0 · bid tab
inlet headwallEA6$4,142.50$1,445.00 to $6,800.00
Bids
  • 2024-01-26 · NDDOT · IM-NHU-2-094(159)290 · $3,785.00 per EA · qty 1.0 · bid tab
  • 2024-01-26 · NDDOT · IM-NHU-2-094(159)290 · $3,478.00 per EA · qty 5.0 · bid tab
  • 2024-01-26 · NDDOT · IM-NHU-2-094(159)290 · $1,445.00 per EA · qty 1.0 · bid tab
  • 2023-11-17 · NDDOT · UGP-2-990(067) · $4,500.00 per EA · qty 11.0 · bid tab
  • 2023-11-17 · NDDOT · UGP-2-990(067) · $6,800.00 per EA · qty 4.0 · bid tab
  • 2023-11-17 · NDDOT · UGP-2-990(067) · $4,900.00 per EA · qty 1.0 · bid tab
lime cement stabilizationACRE1$450.00$450.00 to $450.00
Bids
  • 2025-03-21 · NDDOT · IM-2-094(198)304 · $450.00 per ACRE · qty 35.28 · bid tab
lime cement stabilizationEA2$2,061.50$825.00 to $3,298.00
Bids
  • 2024-01-26 · NDDOT · IM-NHU-2-094(159)290 · $825.00 per EA · qty 1.0 · bid tab
  • 2024-01-26 · NDDOT · IM-NHU-2-094(159)290 · $3,298.00 per EA · qty 1.0 · bid tab
manholeEA8$8,250.00$2,365.00 to $60,000.00
Bids
  • 2024-01-26 · NDDOT · IM-NHU-2-094(159)290 · $2,365.00 per EA · qty 6.0 · bid tab
  • 2023-11-17 · NDDOT · UGP-2-990(067) · $6,500.00 per EA · qty 3.0 · bid tab
  • 2023-11-17 · NDDOT · UGP-2-990(067) · $10,000.00 per EA · qty 1.0 · bid tab
  • 2023-11-17 · NDDOT · UGP-2-990(067) · $4,000.00 per EA · qty 1.0 · bid tab
  • 2023-11-17 · NDDOT · UGP-2-990(067) · $5,500.00 per EA · qty 3.0 · bid tab
  • 2023-11-17 · NDDOT · UGP-2-990(067) · $15,000.00 per EA · qty 1.0 · bid tab
  • 2023-11-17 · NDDOT · UGP-2-990(067) · $20,000.00 per EA · qty 2.0 · bid tab
  • 2023-11-17 · NDDOT · UGP-2-990(067) · $60,000.00 per EA · qty 1.0 · bid tab
sewer main 12-inchLF1$140.00$140.00 to $140.00
Bids
  • 2023-11-17 · NDDOT · UGP-2-990(067) · $140.00 per LF · qty 834.0 · bid tab
sewer main 4-inchLF1$80.00$80.00 to $80.00
Bids
  • 2023-11-17 · NDDOT · UGP-2-990(067) · $80.00 per LF · qty 598.0 · bid tab
sewer serviceEA1$2,000.00$2,000.00 to $2,000.00
Bids
  • 2023-11-17 · NDDOT · UGP-2-990(067) · $2,000.00 per EA · qty 27.0 · bid tab
sewer serviceLF1$80.00$80.00 to $80.00
Bids
  • 2023-11-17 · NDDOT · UGP-2-990(067) · $80.00 per LF · qty 488.0 · bid tab
sidewalkEA4$57.00$42.00 to $70.00
Bids
  • 2026-05-08 · NDDOT · BIP-FXBA-BRP-0200(050) · $70.00 per EA · qty 4.0 · bid tab
  • 2025-03-21 · NDDOT · TAU-2-990(066) · $52.00 per EA · qty 4.0 · bid tab
  • 2023-11-17 · NDDOT · TAC-2-990(065) · $42.00 per EA · qty 18.0 · bid tab
  • 2023-11-17 · NDDOT · UGP-2-990(067) · $62.00 per EA · qty 22.0 · bid tab
sidewalkLF2$11.00$10.00 to $12.00
Bids
  • 2023-11-17 · NDDOT · TAC-2-990(065) · $10.00 per LF · qty 900.0 · bid tab
  • 2023-11-17 · NDDOT · UGP-2-990(067) · $12.00 per LF · qty 990.0 · bid tab
sidewalkSY8$144.00$87.00 to $288.00
Bids
  • 2026-05-08 · NDDOT · BIP-FXBA-BRP-0200(050) · $158.00 per SY · qty 197.0 · bid tab
  • 2025-03-21 · NDDOT · TAU-2-990(066) · $87.00 per SY · qty 1670.0 · bid tab
  • 2025-03-21 · NDDOT · TAU-2-990(066) · $145.00 per SY · qty 92.0 · bid tab
  • 2024-01-26 · NDDOT · IM-NHU-2-094(159)290 · $99.50 per SY · qty 46.0 · bid tab
  • 2024-01-26 · NDDOT · IM-NHU-2-094(159)290 · $143.00 per SY · qty 318.0 · bid tab
  • 2023-11-17 · NDDOT · TAC-2-990(065) · $288.00 per SY · qty 211.0 · bid tab
  • 2023-11-17 · NDDOT · UGP-2-990(067) · $100.00 per SY · qty 1950.0 · bid tab
  • 2023-11-17 · NDDOT · UGP-2-990(067) · $145.00 per SY · qty 968.0 · bid tab
storm pipe 15-inchLF1$150.00$150.00 to $150.00
Bids
  • 2023-11-17 · NDDOT · UGP-2-990(067) · $150.00 per LF · qty 266.0 · bid tab
storm pipe 18-inchLF1$155.00$155.00 to $155.00
Bids
  • 2023-11-17 · NDDOT · UGP-2-990(067) · $155.00 per LF · qty 154.0 · bid tab
storm pipe 21-inchLF1$160.00$160.00 to $160.00
Bids
  • 2023-11-17 · NDDOT · UGP-2-990(067) · $160.00 per LF · qty 17.0 · bid tab
storm pipe 24-inchLF1$170.00$170.00 to $170.00
Bids
  • 2023-11-17 · NDDOT · UGP-2-990(067) · $170.00 per LF · qty 49.0 · bid tab
storm pipe 36-inchLF1$265.00$265.00 to $265.00
Bids
  • 2023-11-17 · NDDOT · UGP-2-990(067) · $265.00 per LF · qty 12.0 · bid tab
storm pipe 54-inchLF1$465.00$465.00 to $465.00
Bids
  • 2023-11-17 · NDDOT · UGP-2-990(067) · $465.00 per LF · qty 44.0 · bid tab
storm pipe 60-inchLF1$547.75$547.75 to $547.75
Bids
  • 2025-04-25 · NDDOT · CERP-0221(084) · $547.75 per LF · qty 132.0 · bid tab
storm pipe (diameter not stated)LF4$1,767.00$1,550.00 to $2,050.00
Bids
  • 2026-02-27 · NDDOT · SS-2-999(069) · $1,875.00 per LF · qty 82.0 · bid tab
  • 2026-02-06 · NDDOT · BRJ-0002(053) · $2,050.00 per LF · qty 42.0 · bid tab
  • 2026-02-06 · NDDOT · BRJ-0002(053) · $1,550.00 per LF · qty 36.0 · bid tab
  • 2024-01-26 · NDDOT · IM-NHU-2-094(159)290 · $1,659.00 per LF · qty 1703.0 · bid tab
water main 12-inchLF1$120.00$120.00 to $120.00
Bids
  • 2023-11-17 · NDDOT · UGP-2-990(067) · $120.00 per LF · qty 685.0 · bid tab
water main 6-inchLF3$75.00$52.30 to $370.00
Bids
  • 2026-05-08 · NDDOT · BIP-FXBA-BRP-0200(050) · $370.00 per LF · qty 28.0 · bid tab
  • 2024-01-26 · NDDOT · IM-NHU-2-094(159)290 · $52.30 per LF · qty 780.0 · bid tab
  • 2023-11-17 · NDDOT · UGP-2-990(067) · $75.00 per LF · qty 30.0 · bid tab
water main 8-inchLF3$85.00$63.17 to $390.00
Bids
  • 2026-05-08 · NDDOT · BIP-FXBA-BRP-0200(050) · $390.00 per LF · qty 355.0 · bid tab
  • 2024-01-26 · NDDOT · IM-NHU-2-094(159)290 · $63.17 per LF · qty 583.0 · bid tab
  • 2023-11-17 · NDDOT · UGP-2-990(067) · $85.00 per LF · qty 671.0 · bid tab
water serviceEA2$1,750.00$1,500.00 to $2,000.00
Bids
  • 2024-01-26 · NDDOT · IM-NHU-2-094(159)290 · $2,000.00 per EA · qty 7.0 · bid tab
  • 2023-11-17 · NDDOT · UGP-2-990(067) · $1,500.00 per EA · qty 12.0 · bid tab
water serviceLF4$70.00$27.00 to $200.00
Bids
  • 2024-01-26 · NDDOT · IM-NHU-2-094(159)290 · $200.00 per LF · qty 36.0 · bid tab
  • 2024-01-26 · NDDOT · IM-NHU-2-094(159)290 · $27.00 per LF · qty 159.0 · bid tab
  • 2023-11-17 · NDDOT · UGP-2-990(067) · $30.00 per LF · qty 482.0 · bid tab
  • 2023-11-17 · NDDOT · UGP-2-990(067) · $110.00 per LF · qty 25.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.