| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 2 | $789.49 | $750.00 to $828.98 | Bids- 2026-05-19 · NCDOT · C204733 · $828.98 per TON · qty 590.0 · bid tab
- 2024-06-18 · NCDOT · C204935 · $750.00 per TON · qty 870.0 · bid tab
|
| curb gutter | LF | 7 | $35.70 | $24.70 to $55.89 | Bids- 2026-05-19 · NCDOT · C204733 · $55.89 per LF · qty 980.0 · bid tab
- 2026-05-19 · NCDOT · C204733 · $41.92 per LF · qty 910.0 · bid tab
- 2024-06-18 · NCDOT · C204935 · $40.80 per LF · qty 900.0 · bid tab
- 2024-06-18 · NCDOT · C204935 · $24.70 per LF · qty 2580.0 · bid tab
- 2024-06-18 · NCDOT · C204935 · $35.70 per LF · qty 190.0 · bid tab
- 2024-06-18 · NCDOT · C204935 · $35.70 per LF · qty 655.0 · bid tab
- 2024-06-18 · NCDOT · C204935 · $28.25 per LF · qty 9500.0 · bid tab
|
| excavation embankment | CY | 1 | $14.06 | $14.06 to $14.06 | Bids- 2026-05-19 · NCDOT · C204733 · $14.06 per CY · qty 64540.0 · bid tab
|
| fire hydrant | EA | 1 | $8,270.00 | $8,270.00 to $8,270.00 | Bids- 2024-06-18 · NCDOT · C204935 · $8,270.00 per EA · qty 2.0 · bid tab
|
| fire hydrant | LF | 2 | $138.76 | $87.00 to $190.53 | Bids- 2026-05-19 · NCDOT · C204733 · $190.53 per LF · qty 20.0 · bid tab
- 2024-06-18 · NCDOT · C204935 · $87.00 per LF · qty 50.0 · bid tab
|
| flexible base | TON | 2 | $47.66 | $40.00 to $55.33 | Bids- 2026-05-19 · NCDOT · C204733 · $55.33 per TON · qty 5100.0 · bid tab
- 2024-06-18 · NCDOT · C204935 · $40.00 per TON · qty 950.0 · bid tab
|
| inlet headwall | EA | 2 | $1,623.35 | $1,206.70 to $2,040.00 | Bids- 2026-05-19 · NCDOT · C204733 · $1,206.70 per EA · qty 7.0 · bid tab
- 2024-06-18 · NCDOT · C204935 · $2,040.00 per EA · qty 23.0 · bid tab
|
| lime cement stabilization | SY | 4 | $5.72 | $4.00 to $6.40 | Bids- 2026-05-19 · NCDOT · C204733 · $6.40 per SY · qty 450.0 · bid tab
- 2026-05-19 · NCDOT · C204733 · $5.44 per SY · qty 1550.0 · bid tab
- 2024-06-18 · NCDOT · C204935 · $4.00 per SY · qty 900.0 · bid tab
- 2024-06-18 · NCDOT · C204935 · $6.00 per SY · qty 750.0 · bid tab
|
| lime cement stabilization | TON | 2 | $53.66 | $48.00 to $59.31 | Bids- 2026-05-19 · NCDOT · C204733 · $59.31 per TON · qty 300.0 · bid tab
- 2024-06-18 · NCDOT · C204935 · $48.00 per TON · qty 590.0 · bid tab
|
| manhole | EA | 6 | $1,571.88 | $775.00 to $15,877.65 | Bids- 2026-05-19 · NCDOT · C204733 · $1,693.77 per EA · qty 1.0 · bid tab
- 2026-05-19 · NCDOT · C204733 · $15,877.65 per EA · qty 3.0 · bid tab
- 2026-05-19 · NCDOT · C204733 · $1,231.86 per EA · qty 7.0 · bid tab
- 2024-06-18 · NCDOT · C204935 · $8,500.00 per EA · qty 38.0 · bid tab
- 2024-06-18 · NCDOT · C204935 · $775.00 per EA · qty 5.0 · bid tab
- 2024-06-18 · NCDOT · C204935 · $1,450.00 per EA · qty 1.0 · bid tab
|
| sewer main 12-inch | LF | 1 | $612.24 | $612.24 to $612.24 | Bids- 2026-05-19 · NCDOT · C204733 · $612.24 per LF · qty 207.0 · bid tab
|
| sewer main 8-inch | LF | 1 | $285.00 | $285.00 to $285.00 | Bids- 2024-06-18 · NCDOT · C204935 · $285.00 per LF · qty 4181.0 · bid tab
|
| sewer service | LF | 2 | $135.14 | $48.00 to $222.29 | Bids- 2026-05-19 · NCDOT · C204733 · $222.29 per LF · qty 130.0 · bid tab
- 2024-06-18 · NCDOT · C204935 · $48.00 per LF · qty 1100.0 · bid tab
|
| sidewalk | EA | 2 | $3,213.00 | $2,856.00 to $3,570.00 | Bids- 2024-06-18 · NCDOT · C204935 · $3,570.00 per EA · qty 1.0 · bid tab
- 2024-06-18 · NCDOT · C204935 · $2,856.00 per EA · qty 64.0 · bid tab
|
| sidewalk | SY | 3 | $91.80 | $61.20 to $123.21 | Bids- 2026-05-19 · NCDOT · C204733 · $123.21 per SY · qty 170.0 · bid tab
- 2024-06-18 · NCDOT · C204935 · $61.20 per SY · qty 3780.0 · bid tab
- 2024-06-18 · NCDOT · C204935 · $91.80 per SY · qty 1110.0 · bid tab
|
| storm pipe 15-inch | LF | 4 | $96.21 | $94.94 to $120.00 | Bids- 2026-05-19 · NCDOT · C204733 · $94.94 per LF · qty 2424.0 · bid tab
- 2026-05-19 · NCDOT · C204733 · $97.42 per LF · qty 56.0 · bid tab
- 2024-06-18 · NCDOT · C204935 · $95.00 per LF · qty 5044.0 · bid tab
- 2024-06-18 · NCDOT · C204935 · $120.00 per LF · qty 756.0 · bid tab
|
| storm pipe 18-inch | LF | 3 | $120.00 | $118.17 to $160.00 | Bids- 2026-05-19 · NCDOT · C204733 · $118.17 per LF · qty 768.0 · bid tab
- 2024-06-18 · NCDOT · C204935 · $120.00 per LF · qty 1364.0 · bid tab
- 2024-06-18 · NCDOT · C204935 · $160.00 per LF · qty 84.0 · bid tab
|
| storm pipe 24-inch | LF | 2 | $128.63 | $127.27 to $130.00 | Bids- 2026-05-19 · NCDOT · C204733 · $127.27 per LF · qty 32.0 · bid tab
- 2024-06-18 · NCDOT · C204935 · $130.00 per LF · qty 204.0 · bid tab
|
| storm pipe 30-inch | LF | 2 | $185.00 | $180.00 to $190.00 | Bids- 2024-06-18 · NCDOT · C204935 · $190.00 per LF · qty 20.0 · bid tab
- 2024-06-18 · NCDOT · C204935 · $180.00 per LF · qty 468.0 · bid tab
|
| storm pipe 36-inch | LF | 1 | $200.00 | $200.00 to $200.00 | Bids- 2024-06-18 · NCDOT · C204935 · $200.00 per LF · qty 1096.0 · bid tab
|
| storm pipe 42-inch | LF | 2 | $247.50 | $225.00 to $270.00 | Bids- 2024-06-18 · NCDOT · C204935 · $270.00 per LF · qty 492.0 · bid tab
- 2024-06-18 · NCDOT · C204935 · $225.00 per LF · qty 96.0 · bid tab
|
| storm pipe 48-inch | LF | 1 | $375.00 | $375.00 to $375.00 | Bids- 2024-06-18 · NCDOT · C204935 · $375.00 per LF · qty 832.0 · bid tab
|
| storm pipe 54-inch | LF | 1 | $519.66 | $519.66 to $519.66 | Bids- 2026-05-19 · NCDOT · C204733 · $519.66 per LF · qty 132.0 · bid tab
|
| storm pipe 60-inch | LF | 1 | $553.85 | $553.85 to $553.85 | Bids- 2026-05-19 · NCDOT · C204733 · $553.85 per LF · qty 184.0 · bid tab
|
| water main 12-inch | LF | 2 | $235.44 | $180.00 to $290.88 | Bids- 2026-05-19 · NCDOT · C204733 · $290.88 per LF · qty 813.0 · bid tab
- 2024-06-18 · NCDOT · C204935 · $180.00 per LF · qty 525.0 · bid tab
|
| water main 16-inch | LF | 1 | $210.00 | $210.00 to $210.00 | Bids- 2024-06-18 · NCDOT · C204935 · $210.00 per LF · qty 3862.0 · bid tab
|
| water main 2-inch | LF | 1 | $36.00 | $36.00 to $36.00 | Bids- 2024-06-18 · NCDOT · C204935 · $36.00 per LF · qty 110.0 · bid tab
|
| water main 6-inch | LF | 1 | $105.00 | $105.00 to $105.00 | Bids- 2024-06-18 · NCDOT · C204935 · $105.00 per LF · qty 347.0 · bid tab
|
| water main 8-inch | LF | 1 | $135.00 | $135.00 to $135.00 | Bids- 2024-06-18 · NCDOT · C204935 · $135.00 per LF · qty 1848.0 · bid tab
|
| water service | LF | 2 | $76.81 | $52.00 to $101.62 | Bids- 2026-05-19 · NCDOT · C204733 · $101.62 per LF · qty 550.0 · bid tab
- 2024-06-18 · NCDOT · C204935 · $52.00 per LF · qty 1200.0 · bid tab
|