Site-work prices, Yadkin County, NC

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON2$789.49$750.00 to $828.98
Bids
  • 2026-05-19 · NCDOT · C204733 · $828.98 per TON · qty 590.0 · bid tab
  • 2024-06-18 · NCDOT · C204935 · $750.00 per TON · qty 870.0 · bid tab
curb gutterLF7$35.70$24.70 to $55.89
Bids
  • 2026-05-19 · NCDOT · C204733 · $55.89 per LF · qty 980.0 · bid tab
  • 2026-05-19 · NCDOT · C204733 · $41.92 per LF · qty 910.0 · bid tab
  • 2024-06-18 · NCDOT · C204935 · $40.80 per LF · qty 900.0 · bid tab
  • 2024-06-18 · NCDOT · C204935 · $24.70 per LF · qty 2580.0 · bid tab
  • 2024-06-18 · NCDOT · C204935 · $35.70 per LF · qty 190.0 · bid tab
  • 2024-06-18 · NCDOT · C204935 · $35.70 per LF · qty 655.0 · bid tab
  • 2024-06-18 · NCDOT · C204935 · $28.25 per LF · qty 9500.0 · bid tab
excavation embankmentCY1$14.06$14.06 to $14.06
Bids
  • 2026-05-19 · NCDOT · C204733 · $14.06 per CY · qty 64540.0 · bid tab
fire hydrantEA1$8,270.00$8,270.00 to $8,270.00
Bids
  • 2024-06-18 · NCDOT · C204935 · $8,270.00 per EA · qty 2.0 · bid tab
fire hydrantLF2$138.76$87.00 to $190.53
Bids
  • 2026-05-19 · NCDOT · C204733 · $190.53 per LF · qty 20.0 · bid tab
  • 2024-06-18 · NCDOT · C204935 · $87.00 per LF · qty 50.0 · bid tab
flexible baseTON2$47.66$40.00 to $55.33
Bids
  • 2026-05-19 · NCDOT · C204733 · $55.33 per TON · qty 5100.0 · bid tab
  • 2024-06-18 · NCDOT · C204935 · $40.00 per TON · qty 950.0 · bid tab
inlet headwallEA2$1,623.35$1,206.70 to $2,040.00
Bids
  • 2026-05-19 · NCDOT · C204733 · $1,206.70 per EA · qty 7.0 · bid tab
  • 2024-06-18 · NCDOT · C204935 · $2,040.00 per EA · qty 23.0 · bid tab
lime cement stabilizationSY4$5.72$4.00 to $6.40
Bids
  • 2026-05-19 · NCDOT · C204733 · $6.40 per SY · qty 450.0 · bid tab
  • 2026-05-19 · NCDOT · C204733 · $5.44 per SY · qty 1550.0 · bid tab
  • 2024-06-18 · NCDOT · C204935 · $4.00 per SY · qty 900.0 · bid tab
  • 2024-06-18 · NCDOT · C204935 · $6.00 per SY · qty 750.0 · bid tab
lime cement stabilizationTON2$53.66$48.00 to $59.31
Bids
  • 2026-05-19 · NCDOT · C204733 · $59.31 per TON · qty 300.0 · bid tab
  • 2024-06-18 · NCDOT · C204935 · $48.00 per TON · qty 590.0 · bid tab
manholeEA6$1,571.88$775.00 to $15,877.65
Bids
  • 2026-05-19 · NCDOT · C204733 · $1,693.77 per EA · qty 1.0 · bid tab
  • 2026-05-19 · NCDOT · C204733 · $15,877.65 per EA · qty 3.0 · bid tab
  • 2026-05-19 · NCDOT · C204733 · $1,231.86 per EA · qty 7.0 · bid tab
  • 2024-06-18 · NCDOT · C204935 · $8,500.00 per EA · qty 38.0 · bid tab
  • 2024-06-18 · NCDOT · C204935 · $775.00 per EA · qty 5.0 · bid tab
  • 2024-06-18 · NCDOT · C204935 · $1,450.00 per EA · qty 1.0 · bid tab
sewer main 12-inchLF1$612.24$612.24 to $612.24
Bids
  • 2026-05-19 · NCDOT · C204733 · $612.24 per LF · qty 207.0 · bid tab
sewer main 8-inchLF1$285.00$285.00 to $285.00
Bids
  • 2024-06-18 · NCDOT · C204935 · $285.00 per LF · qty 4181.0 · bid tab
sewer serviceLF2$135.14$48.00 to $222.29
Bids
  • 2026-05-19 · NCDOT · C204733 · $222.29 per LF · qty 130.0 · bid tab
  • 2024-06-18 · NCDOT · C204935 · $48.00 per LF · qty 1100.0 · bid tab
sidewalkEA2$3,213.00$2,856.00 to $3,570.00
Bids
  • 2024-06-18 · NCDOT · C204935 · $3,570.00 per EA · qty 1.0 · bid tab
  • 2024-06-18 · NCDOT · C204935 · $2,856.00 per EA · qty 64.0 · bid tab
sidewalkSY3$91.80$61.20 to $123.21
Bids
  • 2026-05-19 · NCDOT · C204733 · $123.21 per SY · qty 170.0 · bid tab
  • 2024-06-18 · NCDOT · C204935 · $61.20 per SY · qty 3780.0 · bid tab
  • 2024-06-18 · NCDOT · C204935 · $91.80 per SY · qty 1110.0 · bid tab
storm pipe 15-inchLF4$96.21$94.94 to $120.00
Bids
  • 2026-05-19 · NCDOT · C204733 · $94.94 per LF · qty 2424.0 · bid tab
  • 2026-05-19 · NCDOT · C204733 · $97.42 per LF · qty 56.0 · bid tab
  • 2024-06-18 · NCDOT · C204935 · $95.00 per LF · qty 5044.0 · bid tab
  • 2024-06-18 · NCDOT · C204935 · $120.00 per LF · qty 756.0 · bid tab
storm pipe 18-inchLF3$120.00$118.17 to $160.00
Bids
  • 2026-05-19 · NCDOT · C204733 · $118.17 per LF · qty 768.0 · bid tab
  • 2024-06-18 · NCDOT · C204935 · $120.00 per LF · qty 1364.0 · bid tab
  • 2024-06-18 · NCDOT · C204935 · $160.00 per LF · qty 84.0 · bid tab
storm pipe 24-inchLF2$128.63$127.27 to $130.00
Bids
  • 2026-05-19 · NCDOT · C204733 · $127.27 per LF · qty 32.0 · bid tab
  • 2024-06-18 · NCDOT · C204935 · $130.00 per LF · qty 204.0 · bid tab
storm pipe 30-inchLF2$185.00$180.00 to $190.00
Bids
  • 2024-06-18 · NCDOT · C204935 · $190.00 per LF · qty 20.0 · bid tab
  • 2024-06-18 · NCDOT · C204935 · $180.00 per LF · qty 468.0 · bid tab
storm pipe 36-inchLF1$200.00$200.00 to $200.00
Bids
  • 2024-06-18 · NCDOT · C204935 · $200.00 per LF · qty 1096.0 · bid tab
storm pipe 42-inchLF2$247.50$225.00 to $270.00
Bids
  • 2024-06-18 · NCDOT · C204935 · $270.00 per LF · qty 492.0 · bid tab
  • 2024-06-18 · NCDOT · C204935 · $225.00 per LF · qty 96.0 · bid tab
storm pipe 48-inchLF1$375.00$375.00 to $375.00
Bids
  • 2024-06-18 · NCDOT · C204935 · $375.00 per LF · qty 832.0 · bid tab
storm pipe 54-inchLF1$519.66$519.66 to $519.66
Bids
  • 2026-05-19 · NCDOT · C204733 · $519.66 per LF · qty 132.0 · bid tab
storm pipe 60-inchLF1$553.85$553.85 to $553.85
Bids
  • 2026-05-19 · NCDOT · C204733 · $553.85 per LF · qty 184.0 · bid tab
water main 12-inchLF2$235.44$180.00 to $290.88
Bids
  • 2026-05-19 · NCDOT · C204733 · $290.88 per LF · qty 813.0 · bid tab
  • 2024-06-18 · NCDOT · C204935 · $180.00 per LF · qty 525.0 · bid tab
water main 16-inchLF1$210.00$210.00 to $210.00
Bids
  • 2024-06-18 · NCDOT · C204935 · $210.00 per LF · qty 3862.0 · bid tab
water main 2-inchLF1$36.00$36.00 to $36.00
Bids
  • 2024-06-18 · NCDOT · C204935 · $36.00 per LF · qty 110.0 · bid tab
water main 6-inchLF1$105.00$105.00 to $105.00
Bids
  • 2024-06-18 · NCDOT · C204935 · $105.00 per LF · qty 347.0 · bid tab
water main 8-inchLF1$135.00$135.00 to $135.00
Bids
  • 2024-06-18 · NCDOT · C204935 · $135.00 per LF · qty 1848.0 · bid tab
water serviceLF2$76.81$52.00 to $101.62
Bids
  • 2026-05-19 · NCDOT · C204733 · $101.62 per LF · qty 550.0 · bid tab
  • 2024-06-18 · NCDOT · C204935 · $52.00 per LF · qty 1200.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.