| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 3 | $970.00 | $875.00 to $1,800.00 | Bids- 2026-09-15 · NCDOT · C205214 · $970.00 per TON · qty 200.0 · bid tab
- 2025-12-16 · NCDOT · C205010 · $1,800.00 per TON · qty 1.5 · bid tab
- 2023-11-21 · NCDOT · C204471 · $875.00 per TON · qty 4745.0 · bid tab
|
| curb gutter | LF | 4 | $48.38 | $40.50 to $66.50 | Bids- 2026-09-15 · NCDOT · C205214 · $46.50 per LF · qty 2870.0 · bid tab
- 2023-11-21 · NCDOT · C204471 · $40.50 per LF · qty 17330.0 · bid tab
- 2023-11-21 · NCDOT · C204471 · $66.50 per LF · qty 1070.0 · bid tab
- 2023-11-21 · NCDOT · C204471 · $50.25 per LF · qty 4640.0 · bid tab
|
| excavation embankment | CY | 3 | $55.00 | $0.01 to $62.00 | Bids- 2026-09-15 · NCDOT · C205214 · $0.01 per CY · qty 16000.0 · bid tab
- 2023-11-21 · NCDOT · C204471 · $55.00 per CY · qty 51500.0 · bid tab
- 2023-11-21 · NCDOT · C204471 · $62.00 per CY · qty 43500.0 · bid tab
|
| fire hydrant | EA | 1 | $9,136.00 | $9,136.00 to $9,136.00 | Bids- 2023-11-21 · NCDOT · C204471 · $9,136.00 per EA · qty 19.0 · bid tab
|
| fire hydrant | LF | 2 | $193.50 | $135.00 to $252.00 | Bids- 2026-09-15 · NCDOT · C205214 · $252.00 per LF · qty 17.0 · bid tab
- 2023-11-21 · NCDOT · C204471 · $135.00 per LF · qty 135.0 · bid tab
|
| flexible base | TON | 2 | $92.75 | $48.50 to $137.00 | Bids- 2026-09-15 · NCDOT · C205214 · $48.50 per TON · qty 220.0 · bid tab
- 2023-11-21 · NCDOT · C204471 · $137.00 per TON · qty 693.0 · bid tab
|
| inlet headwall | EA | 1 | $2,329.00 | $2,329.00 to $2,329.00 | Bids- 2023-11-21 · NCDOT · C204471 · $2,329.00 per EA · qty 59.0 · bid tab
|
| lime cement stabilization | SY | 3 | $3.25 | $2.80 to $3.75 | Bids- 2026-09-15 · NCDOT · C205214 · $3.25 per SY · qty 600.0 · bid tab
- 2026-09-15 · NCDOT · C205214 · $3.75 per SY · qty 300.0 · bid tab
- 2023-11-21 · NCDOT · C204471 · $2.80 per SY · qty 7300.0 · bid tab
|
| lime cement stabilization | TON | 2 | $55.12 | $46.50 to $63.75 | Bids- 2026-09-15 · NCDOT · C205214 · $46.50 per TON · qty 200.0 · bid tab
- 2023-11-21 · NCDOT · C204471 · $63.75 per TON · qty 3800.0 · bid tab
|
| manhole | EA | 8 | $4,447.00 | $701.00 to $12,700.00 | Bids- 2026-09-15 · NCDOT · C205214 · $1,300.00 per EA · qty 5.0 · bid tab
- 2026-09-15 · NCDOT · C205214 · $12,700.00 per EA · qty 1.0 · bid tab
- 2026-09-15 · NCDOT · C205214 · $1,890.00 per EA · qty 1.0 · bid tab
- 2026-09-15 · NCDOT · C205214 · $8,200.00 per EA · qty 6.0 · bid tab
- 2026-09-15 · NCDOT · C205214 · $1,220.00 per EA · qty 3.0 · bid tab
- 2023-11-21 · NCDOT · C204471 · $701.00 per EA · qty 116.0 · bid tab
- 2023-11-21 · NCDOT · C204471 · $10,800.00 per EA · qty 2.0 · bid tab
- 2023-11-21 · NCDOT · C204471 · $7,004.00 per EA · qty 69.0 · bid tab
|
| sewer main 15-inch | LF | 1 | $220.50 | $220.50 to $220.50 | Bids- 2023-11-21 · NCDOT · C204471 · $220.50 per LF · qty 2044.0 · bid tab
|
| sewer main 8-inch | LF | 2 | $106.50 | $95.00 to $118.00 | Bids- 2026-09-15 · NCDOT · C205214 · $95.00 per LF · qty 957.0 · bid tab
- 2023-11-21 · NCDOT · C204471 · $118.00 per LF · qty 13654.0 · bid tab
|
| sewer service | LF | 1 | $82.00 | $82.00 to $82.00 | Bids- 2026-09-15 · NCDOT · C205214 · $82.00 per LF · qty 34.0 · bid tab
|
| sidewalk | EA | 2 | $4,711.00 | $4,150.00 to $5,272.00 | Bids- 2026-09-15 · NCDOT · C205214 · $4,150.00 per EA · qty 6.0 · bid tab
- 2023-11-21 · NCDOT · C204471 · $5,272.00 per EA · qty 35.0 · bid tab
|
| sidewalk | SY | 3 | $92.00 | $69.00 to $111.00 | Bids- 2026-09-15 · NCDOT · C205214 · $69.00 per SY · qty 50.0 · bid tab
- 2026-09-15 · NCDOT · C205214 · $111.00 per SY · qty 120.0 · bid tab
- 2023-11-21 · NCDOT · C204471 · $92.00 per SY · qty 4720.0 · bid tab
|
| storm pipe 15-inch | LF | 3 | $201.50 | $77.00 to $208.00 | Bids- 2026-09-15 · NCDOT · C205214 · $77.00 per LF · qty 780.0 · bid tab
- 2023-11-21 · NCDOT · C204471 · $208.00 per LF · qty 6204.0 · bid tab
- 2023-11-21 · NCDOT · C204471 · $201.50 per LF · qty 1332.0 · bid tab
|
| storm pipe 18-inch | LF | 3 | $169.00 | $82.00 to $194.00 | Bids- 2026-09-15 · NCDOT · C205214 · $82.00 per LF · qty 700.0 · bid tab
- 2023-11-21 · NCDOT · C204471 · $194.00 per LF · qty 1496.0 · bid tab
- 2023-11-21 · NCDOT · C204471 · $169.00 per LF · qty 1592.0 · bid tab
|
| storm pipe 24-inch | LF | 3 | $215.50 | $111.00 to $276.00 | Bids- 2026-09-15 · NCDOT · C205214 · $111.00 per LF · qty 52.0 · bid tab
- 2023-11-21 · NCDOT · C204471 · $215.50 per LF · qty 1600.0 · bid tab
- 2023-11-21 · NCDOT · C204471 · $276.00 per LF · qty 2568.0 · bid tab
|
| storm pipe 30-inch | LF | 2 | $291.00 | $278.50 to $303.50 | Bids- 2023-11-21 · NCDOT · C204471 · $278.50 per LF · qty 488.0 · bid tab
- 2023-11-21 · NCDOT · C204471 · $303.50 per LF · qty 2500.0 · bid tab
|
| storm pipe 36-inch | LF | 3 | $353.00 | $303.00 to $369.00 | Bids- 2023-11-21 · NCDOT · C204471 · $303.00 per LF · qty 12.0 · bid tab
- 2023-11-21 · NCDOT · C204471 · $353.00 per LF · qty 2156.0 · bid tab
- 2023-11-21 · NCDOT · C204471 · $369.00 per LF · qty 1940.0 · bid tab
|
| storm pipe 48-inch | LF | 1 | $565.50 | $565.50 to $565.50 | Bids- 2023-11-21 · NCDOT · C204471 · $565.50 per LF · qty 20.0 · bid tab
|
| storm pipe 60-inch | LF | 1 | $925.00 | $925.00 to $925.00 | Bids- 2023-11-21 · NCDOT · C204471 · $925.00 per LF · qty 16.0 · bid tab
|
| storm pipe 72-inch | LF | 1 | $1,237.00 | $1,237.00 to $1,237.00 | Bids- 2023-11-21 · NCDOT · C204471 · $1,237.00 per LF · qty 16.0 · bid tab
|
| water main 12-inch | LF | 2 | $163.25 | $140.00 to $186.50 | Bids- 2026-09-15 · NCDOT · C205214 · $140.00 per LF · qty 632.0 · bid tab
- 2023-11-21 · NCDOT · C204471 · $186.50 per LF · qty 721.0 · bid tab
|
| water main 16-inch | LF | 1 | $190.00 | $190.00 to $190.00 | Bids- 2023-11-21 · NCDOT · C204471 · $190.00 per LF · qty 20690.0 · bid tab
|
| water main 6-inch | LF | 1 | $128.00 | $128.00 to $128.00 | Bids- 2023-11-21 · NCDOT · C204471 · $128.00 per LF · qty 327.0 · bid tab
|
| water main 8-inch | LF | 1 | $220.00 | $220.00 to $220.00 | Bids- 2023-11-21 · NCDOT · C204471 · $220.00 per LF · qty 6274.0 · bid tab
|
| water service | LF | 1 | $83.25 | $83.25 to $83.25 | Bids- 2023-11-21 · NCDOT · C204471 · $83.25 per LF · qty 522.0 · bid tab
|