Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON4$586.50$421.50 to $760.00
Bids
  • 2026-09-15 · NCDOT · C205203 · $760.00 per TON · qty 365.0 · bid tab
  • 2026-04-21 · NCDOT · C205130 · $421.50 per TON · qty 1435.0 · bid tab
  • 2026-02-17 · NCDOT · C205035 · $598.00 per TON · qty 3460.0 · bid tab
  • 2026-01-20 · NCDOT · C204814 · $575.00 per TON · qty 290.0 · bid tab
curb gutterLF12$35.00$26.00 to $45.00
Bids
  • 2026-09-15 · NCDOT · C205203 · $35.00 per LF · qty 300.0 · bid tab
  • 2026-09-15 · NCDOT · C205203 · $35.00 per LF · qty 180.0 · bid tab
  • 2026-09-15 · NCDOT · C205203 · $40.00 per LF · qty 920.0 · bid tab
  • 2026-09-15 · NCDOT · C205203 · $45.00 per LF · qty 340.0 · bid tab
  • 2026-04-21 · NCDOT · C205130 · $36.50 per LF · qty 920.0 · bid tab
  • 2026-04-21 · NCDOT · C205130 · $36.00 per LF · qty 12150.0 · bid tab
  • 2026-04-21 · NCDOT · C205130 · $29.25 per LF · qty 5250.0 · bid tab
  • 2026-02-17 · NCDOT · C205035 · $31.10 per LF · qty 6700.0 · bid tab
  • 2026-02-17 · NCDOT · C205035 · $36.70 per LF · qty 23550.0 · bid tab
  • 2026-02-17 · NCDOT · C205035 · $31.10 per LF · qty 770.0 · bid tab
(10 most recent of 12 shown; all in the Hubstake feed)
excavation embankmentCY2$27.75$25.50 to $30.00
Bids
  • 2026-02-17 · NCDOT · C205035 · $25.50 per CY · qty 61400.0 · bid tab
  • 2026-01-20 · NCDOT · C204814 · $30.00 per CY · qty 4700.0 · bid tab
fire hydrantEA1$7,979.00$7,979.00 to $7,979.00
Bids
  • 2026-02-17 · NCDOT · C205035 · $7,979.00 per EA · qty 11.0 · bid tab
fire hydrantLF3$155.00$111.00 to $156.00
Bids
  • 2026-04-21 · NCDOT · C205130 · $156.00 per LF · qty 169.0 · bid tab
  • 2026-02-17 · NCDOT · C205035 · $111.00 per LF · qty 76.0 · bid tab
  • 2026-01-20 · NCDOT · C204814 · $155.00 per LF · qty 11.0 · bid tab
flexible baseTON2$52.62$45.00 to $60.25
Bids
  • 2026-09-15 · NCDOT · C205203 · $45.00 per TON · qty 154.0 · bid tab
  • 2026-04-21 · NCDOT · C205130 · $60.25 per TON · qty 177.0 · bid tab
inlet headwallEA4$1,266.00$1,196.00 to $1,300.00
Bids
  • 2026-09-15 · NCDOT · C205203 · $1,284.00 per EA · qty 1.0 · bid tab
  • 2026-04-21 · NCDOT · C205130 · $1,196.00 per EA · qty 19.0 · bid tab
  • 2026-02-17 · NCDOT · C205035 · $1,248.00 per EA · qty 9.0 · bid tab
  • 2026-01-20 · NCDOT · C204814 · $1,300.00 per EA · qty 2.0 · bid tab
lime cement stabilizationSY6$4.08$3.50 to $5.00
Bids
  • 2026-04-21 · NCDOT · C205130 · $5.00 per SY · qty 11025.0 · bid tab
  • 2026-04-21 · NCDOT · C205130 · $4.15 per SY · qty 600.0 · bid tab
  • 2026-02-17 · NCDOT · C205035 · $4.45 per SY · qty 13575.0 · bid tab
  • 2026-02-17 · NCDOT · C205035 · $3.50 per SY · qty 3750.0 · bid tab
  • 2026-01-20 · NCDOT · C204814 · $4.00 per SY · qty 300.0 · bid tab
  • 2026-01-20 · NCDOT · C204814 · $4.00 per SY · qty 400.0 · bid tab
lime cement stabilizationTON5$51.00$37.00 to $55.00
Bids
  • 2026-04-21 · NCDOT · C205130 · $37.00 per TON · qty 250.0 · bid tab
  • 2026-04-21 · NCDOT · C205130 · $51.00 per TON · qty 7175.0 · bid tab
  • 2026-02-17 · NCDOT · C205035 · $55.00 per TON · qty 300.0 · bid tab
  • 2026-02-17 · NCDOT · C205035 · $55.00 per TON · qty 9075.0 · bid tab
  • 2026-01-20 · NCDOT · C204814 · $45.00 per TON · qty 200.0 · bid tab
manholeEA10$1,097.50$384.00 to $14,800.00
Bids
  • 2026-04-21 · NCDOT · C205130 · $945.00 per EA · qty 7.0 · bid tab
  • 2026-04-21 · NCDOT · C205130 · $1,729.00 per EA · qty 6.0 · bid tab
  • 2026-04-21 · NCDOT · C205130 · $14,800.00 per EA · qty 13.0 · bid tab
  • 2026-02-17 · NCDOT · C205035 · $799.00 per EA · qty 17.0 · bid tab
  • 2026-02-17 · NCDOT · C205035 · $1,245.00 per EA · qty 2.0 · bid tab
  • 2026-02-17 · NCDOT · C205035 · $384.00 per EA · qty 1.0 · bid tab
  • 2026-02-17 · NCDOT · C205035 · $463.00 per EA · qty 19.0 · bid tab
  • 2026-01-20 · NCDOT · C204814 · $950.00 per EA · qty 8.0 · bid tab
  • 2026-01-20 · NCDOT · C204814 · $1,500.00 per EA · qty 18.0 · bid tab
  • 2026-01-20 · NCDOT · C204814 · $9,975.00 per EA · qty 4.0 · bid tab
sewer main 14-inchLF1$401.00$401.00 to $401.00
Bids
  • 2026-04-21 · NCDOT · C205130 · $401.00 per LF · qty 220.0 · bid tab
sewer main 15-inchLF1$384.00$384.00 to $384.00
Bids
  • 2026-04-21 · NCDOT · C205130 · $384.00 per LF · qty 2394.0 · bid tab
sewer main 8-inchLF1$225.00$225.00 to $225.00
Bids
  • 2026-01-20 · NCDOT · C204814 · $225.00 per LF · qty 102.0 · bid tab
sewer serviceLF1$111.00$111.00 to $111.00
Bids
  • 2026-04-21 · NCDOT · C205130 · $111.00 per LF · qty 58.0 · bid tab
sidewalkEA3$2,837.00$2,400.00 to $2,866.00
Bids
  • 2026-04-21 · NCDOT · C205130 · $2,866.00 per EA · qty 26.0 · bid tab
  • 2026-02-17 · NCDOT · C205035 · $2,837.00 per EA · qty 17.0 · bid tab
  • 2026-01-20 · NCDOT · C204814 · $2,400.00 per EA · qty 11.0 · bid tab
sidewalkSY7$85.00$55.00 to $95.00
Bids
  • 2026-09-15 · NCDOT · C205203 · $85.00 per SY · qty 239.0 · bid tab
  • 2026-04-21 · NCDOT · C205130 · $69.75 per SY · qty 3160.0 · bid tab
  • 2026-04-21 · NCDOT · C205130 · $93.00 per SY · qty 820.0 · bid tab
  • 2026-02-17 · NCDOT · C205035 · $64.00 per SY · qty 2900.0 · bid tab
  • 2026-02-17 · NCDOT · C205035 · $87.75 per SY · qty 3120.0 · bid tab
  • 2026-01-20 · NCDOT · C204814 · $95.00 per SY · qty 220.0 · bid tab
  • 2026-01-20 · NCDOT · C204814 · $55.00 per SY · qty 1100.0 · bid tab
storm pipe 15-inchLF5$107.00$93.75 to $125.00
Bids
  • 2026-09-15 · NCDOT · C205203 · $125.00 per LF · qty 80.0 · bid tab
  • 2026-04-21 · NCDOT · C205130 · $107.00 per LF · qty 5844.0 · bid tab
  • 2026-02-17 · NCDOT · C205035 · $116.00 per LF · qty 64.0 · bid tab
  • 2026-02-17 · NCDOT · C205035 · $93.75 per LF · qty 10726.0 · bid tab
  • 2026-01-20 · NCDOT · C204814 · $95.00 per LF · qty 548.0 · bid tab
storm pipe 18-inchLF5$137.00$105.00 to $155.00
Bids
  • 2026-09-15 · NCDOT · C205203 · $145.00 per LF · qty 380.0 · bid tab
  • 2026-04-21 · NCDOT · C205130 · $137.00 per LF · qty 1936.0 · bid tab
  • 2026-02-17 · NCDOT · C205035 · $110.00 per LF · qty 1452.0 · bid tab
  • 2026-02-17 · NCDOT · C205035 · $155.00 per LF · qty 18.0 · bid tab
  • 2026-01-20 · NCDOT · C204814 · $105.00 per LF · qty 108.0 · bid tab
storm pipe 24-inchLF4$161.00$141.00 to $175.00
Bids
  • 2026-09-15 · NCDOT · C205203 · $175.00 per LF · qty 116.0 · bid tab
  • 2026-04-21 · NCDOT · C205130 · $158.00 per LF · qty 2636.0 · bid tab
  • 2026-02-17 · NCDOT · C205035 · $164.00 per LF · qty 3744.0 · bid tab
  • 2026-02-17 · NCDOT · C205035 · $141.00 per LF · qty 96.0 · bid tab
storm pipe 30-inchLF3$208.00$180.00 to $230.00
Bids
  • 2026-09-15 · NCDOT · C205203 · $180.00 per LF · qty 100.0 · bid tab
  • 2026-04-21 · NCDOT · C205130 · $208.00 per LF · qty 596.0 · bid tab
  • 2026-02-17 · NCDOT · C205035 · $230.00 per LF · qty 1816.0 · bid tab
storm pipe 36-inchLF5$280.00$200.00 to $317.00
Bids
  • 2026-09-15 · NCDOT · C205203 · $280.00 per LF · qty 72.0 · bid tab
  • 2026-09-15 · NCDOT · C205203 · $200.00 per LF · qty 156.0 · bid tab
  • 2026-04-21 · NCDOT · C205130 · $317.00 per LF · qty 172.0 · bid tab
  • 2026-02-17 · NCDOT · C205035 · $258.00 per LF · qty 48.0 · bid tab
  • 2026-02-17 · NCDOT · C205035 · $309.00 per LF · qty 2796.0 · bid tab
storm pipe 42-inchLF2$482.50$454.00 to $511.00
Bids
  • 2026-02-17 · NCDOT · C205035 · $511.00 per LF · qty 16.0 · bid tab
  • 2026-02-17 · NCDOT · C205035 · $454.00 per LF · qty 112.0 · bid tab
storm pipe 54-inchLF3$725.00$242.00 to $846.00
Bids
  • 2026-02-17 · NCDOT · C205035 · $846.00 per LF · qty 176.0 · bid tab
  • 2026-02-17 · NCDOT · C205035 · $725.00 per LF · qty 228.0 · bid tab
  • 2026-02-17 · NCDOT · C205035 · $242.00 per LF · qty 44.0 · bid tab
water main 12-inchLF1$195.00$195.00 to $195.00
Bids
  • 2026-04-21 · NCDOT · C205130 · $195.00 per LF · qty 3935.0 · bid tab
water main 16-inchLF3$295.00$242.00 to $354.00
Bids
  • 2026-04-21 · NCDOT · C205130 · $354.00 per LF · qty 1967.0 · bid tab
  • 2026-02-17 · NCDOT · C205035 · $242.00 per LF · qty 5063.0 · bid tab
  • 2026-01-20 · NCDOT · C204814 · $295.00 per LF · qty 416.0 · bid tab
water main 18-inchLF1$191.00$191.00 to $191.00
Bids
  • 2026-02-17 · NCDOT · C205035 · $191.00 per LF · qty 296.0 · bid tab
water main 4-inchLF1$129.00$129.00 to $129.00
Bids
  • 2026-04-21 · NCDOT · C205130 · $129.00 per LF · qty 47.0 · bid tab
water main 6-inchLF4$89.75$84.25 to $105.00
Bids
  • 2026-09-15 · NCDOT · C205203 · $105.00 per LF · qty 584.0 · bid tab
  • 2026-04-21 · NCDOT · C205130 · $94.50 per LF · qty 3096.0 · bid tab
  • 2026-02-17 · NCDOT · C205035 · $84.25 per LF · qty 20.0 · bid tab
  • 2026-01-20 · NCDOT · C204814 · $85.00 per LF · qty 1330.0 · bid tab
water main 8-inchLF2$101.38$63.75 to $139.00
Bids
  • 2026-04-21 · NCDOT · C205130 · $139.00 per LF · qty 759.0 · bid tab
  • 2026-02-17 · NCDOT · C205035 · $63.75 per LF · qty 323.0 · bid tab
water serviceLF6$80.50$45.00 to $289.00
Bids
  • 2026-09-15 · NCDOT · C205203 · $45.00 per LF · qty 160.0 · bid tab
  • 2026-04-21 · NCDOT · C205130 · $66.75 per LF · qty 1139.0 · bid tab
  • 2026-04-21 · NCDOT · C205130 · $289.00 per LF · qty 23.0 · bid tab
  • 2026-02-17 · NCDOT · C205035 · $118.00 per LF · qty 197.0 · bid tab
  • 2026-02-17 · NCDOT · C205035 · $81.00 per LF · qty 2339.0 · bid tab
  • 2026-01-20 · NCDOT · C204814 · $80.00 per LF · qty 515.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.