Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON4$647.50$600.00 to $1,500.00
Bids
  • 2026-03-17 · NCDOT · C205179 · $600.00 per TON · qty 1898.0 · bid tab
  • 2025-11-18 · NCDOT · C205154 · $600.00 per TON · qty 1839.0 · bid tab
  • 2024-03-19 · NCDOT · C204822 · $1,500.00 per TON · qty 285.0 · bid tab
  • 2023-12-19 · NCDOT · C204842 · $695.00 per TON · qty 840.0 · bid tab
concrete pavementSY1$61.54$61.54 to $61.54
Bids
  • 2023-12-19 · NCDOT · C204842 · $61.54 per SY · qty 280.0 · bid tab
curb gutterEA1$480.00$480.00 to $480.00
Bids
  • 2024-03-19 · NCDOT · C204822 · $480.00 per EA · qty 17.0 · bid tab
curb gutterLF6$36.66$22.56 to $60.00
Bids
  • 2024-03-19 · NCDOT · C204822 · $50.00 per LF · qty 4760.0 · bid tab
  • 2024-03-19 · NCDOT · C204822 · $60.00 per LF · qty 790.0 · bid tab
  • 2023-12-19 · NCDOT · C204842 · $27.18 per LF · qty 5730.0 · bid tab
  • 2023-12-19 · NCDOT · C204842 · $46.15 per LF · qty 50.0 · bid tab
  • 2023-12-19 · NCDOT · C204842 · $22.56 per LF · qty 4280.0 · bid tab
  • 2023-12-19 · NCDOT · C204842 · $22.56 per LF · qty 290.0 · bid tab
excavation embankmentCY1$27.50$27.50 to $27.50
Bids
  • 2023-12-19 · NCDOT · C204842 · $27.50 per CY · qty 190000.0 · bid tab
fire hydrantEA1$12,000.00$12,000.00 to $12,000.00
Bids
  • 2024-03-19 · NCDOT · C204822 · $12,000.00 per EA · qty 2.0 · bid tab
flexible baseTON1$160.00$160.00 to $160.00
Bids
  • 2024-03-19 · NCDOT · C204822 · $160.00 per TON · qty 56.0 · bid tab
inlet headwallEA1$871.79$871.79 to $871.79
Bids
  • 2023-12-19 · NCDOT · C204842 · $871.79 per EA · qty 15.0 · bid tab
lime cement stabilizationSY1$1.00$1.00 to $1.00
Bids
  • 2023-12-19 · NCDOT · C204842 · $1.00 per SY · qty 3600.0 · bid tab
lime cement stabilizationTON1$47.50$47.50 to $47.50
Bids
  • 2023-12-19 · NCDOT · C204842 · $47.50 per TON · qty 1650.0 · bid tab
manholeEA8$1,262.50$533.99 to $5,300.00
Bids
  • 2025-11-18 · NCDOT · C205154 · $1,200.00 per EA · qty 2.0 · bid tab
  • 2024-03-19 · NCDOT · C204822 · $5,000.00 per EA · qty 1.0 · bid tab
  • 2024-03-19 · NCDOT · C204822 · $723.00 per EA · qty 11.0 · bid tab
  • 2024-03-19 · NCDOT · C204822 · $5,300.00 per EA · qty 35.0 · bid tab
  • 2024-03-19 · NCDOT · C204822 · $1,325.00 per EA · qty 4.0 · bid tab
  • 2023-12-19 · NCDOT · C204842 · $2,931.00 per EA · qty 5.0 · bid tab
  • 2023-12-19 · NCDOT · C204842 · $533.99 per EA · qty 17.0 · bid tab
  • 2023-12-19 · NCDOT · C204842 · $1,004.19 per EA · qty 23.0 · bid tab
sewer main 8-inchLF1$277.00$277.00 to $277.00
Bids
  • 2024-03-19 · NCDOT · C204822 · $277.00 per LF · qty 3642.0 · bid tab
sewer serviceLF1$127.00$127.00 to $127.00
Bids
  • 2024-03-19 · NCDOT · C204822 · $127.00 per LF · qty 1003.0 · bid tab
sidewalkEA2$3,538.64$2,051.28 to $5,026.00
Bids
  • 2024-03-19 · NCDOT · C204822 · $5,026.00 per EA · qty 20.0 · bid tab
  • 2023-12-19 · NCDOT · C204842 · $2,051.28 per EA · qty 18.0 · bid tab
sidewalkSY5$143.00$45.13 to $160.00
Bids
  • 2026-03-17 · NCDOT · C205179 · $155.00 per SY · qty 792.0 · bid tab
  • 2025-11-18 · NCDOT · C205154 · $160.00 per SY · qty 468.0 · bid tab
  • 2024-03-19 · NCDOT · C204822 · $143.00 per SY · qty 1280.0 · bid tab
  • 2024-03-19 · NCDOT · C204822 · $83.00 per SY · qty 2370.0 · bid tab
  • 2023-12-19 · NCDOT · C204842 · $45.13 per SY · qty 2450.0 · bid tab
storm pipe 15-inchLF2$140.75$131.50 to $150.00
Bids
  • 2024-03-19 · NCDOT · C204822 · $150.00 per LF · qty 1024.0 · bid tab
  • 2023-12-19 · NCDOT · C204842 · $131.50 per LF · qty 2892.0 · bid tab
storm pipe 18-inchLF2$144.25$138.50 to $150.00
Bids
  • 2024-03-19 · NCDOT · C204822 · $150.00 per LF · qty 1348.0 · bid tab
  • 2023-12-19 · NCDOT · C204842 · $138.50 per LF · qty 408.0 · bid tab
storm pipe 24-inchLF3$250.00$163.50 to $250.00
Bids
  • 2024-03-19 · NCDOT · C204822 · $250.00 per LF · qty 228.0 · bid tab
  • 2024-03-19 · NCDOT · C204822 · $250.00 per LF · qty 116.0 · bid tab
  • 2023-12-19 · NCDOT · C204842 · $163.50 per LF · qty 204.0 · bid tab
storm pipe 30-inchLF2$562.50$375.00 to $750.00
Bids
  • 2024-03-19 · NCDOT · C204822 · $750.00 per LF · qty 60.0 · bid tab
  • 2024-03-19 · NCDOT · C204822 · $375.00 per LF · qty 60.0 · bid tab
storm pipe 36-inchLF1$234.40$234.40 to $234.40
Bids
  • 2023-12-19 · NCDOT · C204842 · $234.40 per LF · qty 224.0 · bid tab
storm pipe 72-inchLF1$958.50$958.50 to $958.50
Bids
  • 2023-12-19 · NCDOT · C204842 · $958.50 per LF · qty 144.0 · bid tab
water main 12-inchLF2$256.00$195.00 to $317.00
Bids
  • 2024-03-19 · NCDOT · C204822 · $317.00 per LF · qty 254.0 · bid tab
  • 2023-12-19 · NCDOT · C204842 · $195.00 per LF · qty 472.0 · bid tab
water main 6-inchLF2$311.00$267.00 to $355.00
Bids
  • 2024-03-19 · NCDOT · C204822 · $355.00 per LF · qty 6.0 · bid tab
  • 2023-12-19 · NCDOT · C204842 · $267.00 per LF · qty 172.0 · bid tab
water main 8-inchLF2$205.00$126.00 to $284.00
Bids
  • 2024-03-19 · NCDOT · C204822 · $284.00 per LF · qty 420.0 · bid tab
  • 2023-12-19 · NCDOT · C204842 · $126.00 per LF · qty 2705.0 · bid tab
water serviceLF2$53.50$31.00 to $76.00
Bids
  • 2024-03-19 · NCDOT · C204822 · $31.00 per LF · qty 878.0 · bid tab
  • 2023-12-19 · NCDOT · C204842 · $76.00 per LF · qty 123.0 · bid tab