| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 4 | $647.50 | $600.00 to $1,500.00 | Bids- 2026-03-17 · NCDOT · C205179 · $600.00 per TON · qty 1898.0 · bid tab
- 2025-11-18 · NCDOT · C205154 · $600.00 per TON · qty 1839.0 · bid tab
- 2024-03-19 · NCDOT · C204822 · $1,500.00 per TON · qty 285.0 · bid tab
- 2023-12-19 · NCDOT · C204842 · $695.00 per TON · qty 840.0 · bid tab
|
| concrete pavement | SY | 1 | $61.54 | $61.54 to $61.54 | Bids- 2023-12-19 · NCDOT · C204842 · $61.54 per SY · qty 280.0 · bid tab
|
| curb gutter | EA | 1 | $480.00 | $480.00 to $480.00 | Bids- 2024-03-19 · NCDOT · C204822 · $480.00 per EA · qty 17.0 · bid tab
|
| curb gutter | LF | 6 | $36.66 | $22.56 to $60.00 | Bids- 2024-03-19 · NCDOT · C204822 · $50.00 per LF · qty 4760.0 · bid tab
- 2024-03-19 · NCDOT · C204822 · $60.00 per LF · qty 790.0 · bid tab
- 2023-12-19 · NCDOT · C204842 · $27.18 per LF · qty 5730.0 · bid tab
- 2023-12-19 · NCDOT · C204842 · $46.15 per LF · qty 50.0 · bid tab
- 2023-12-19 · NCDOT · C204842 · $22.56 per LF · qty 4280.0 · bid tab
- 2023-12-19 · NCDOT · C204842 · $22.56 per LF · qty 290.0 · bid tab
|
| excavation embankment | CY | 1 | $27.50 | $27.50 to $27.50 | Bids- 2023-12-19 · NCDOT · C204842 · $27.50 per CY · qty 190000.0 · bid tab
|
| fire hydrant | EA | 1 | $12,000.00 | $12,000.00 to $12,000.00 | Bids- 2024-03-19 · NCDOT · C204822 · $12,000.00 per EA · qty 2.0 · bid tab
|
| flexible base | TON | 1 | $160.00 | $160.00 to $160.00 | Bids- 2024-03-19 · NCDOT · C204822 · $160.00 per TON · qty 56.0 · bid tab
|
| inlet headwall | EA | 1 | $871.79 | $871.79 to $871.79 | Bids- 2023-12-19 · NCDOT · C204842 · $871.79 per EA · qty 15.0 · bid tab
|
| lime cement stabilization | SY | 1 | $1.00 | $1.00 to $1.00 | Bids- 2023-12-19 · NCDOT · C204842 · $1.00 per SY · qty 3600.0 · bid tab
|
| lime cement stabilization | TON | 1 | $47.50 | $47.50 to $47.50 | Bids- 2023-12-19 · NCDOT · C204842 · $47.50 per TON · qty 1650.0 · bid tab
|
| manhole | EA | 8 | $1,262.50 | $533.99 to $5,300.00 | Bids- 2025-11-18 · NCDOT · C205154 · $1,200.00 per EA · qty 2.0 · bid tab
- 2024-03-19 · NCDOT · C204822 · $5,000.00 per EA · qty 1.0 · bid tab
- 2024-03-19 · NCDOT · C204822 · $723.00 per EA · qty 11.0 · bid tab
- 2024-03-19 · NCDOT · C204822 · $5,300.00 per EA · qty 35.0 · bid tab
- 2024-03-19 · NCDOT · C204822 · $1,325.00 per EA · qty 4.0 · bid tab
- 2023-12-19 · NCDOT · C204842 · $2,931.00 per EA · qty 5.0 · bid tab
- 2023-12-19 · NCDOT · C204842 · $533.99 per EA · qty 17.0 · bid tab
- 2023-12-19 · NCDOT · C204842 · $1,004.19 per EA · qty 23.0 · bid tab
|
| sewer main 8-inch | LF | 1 | $277.00 | $277.00 to $277.00 | Bids- 2024-03-19 · NCDOT · C204822 · $277.00 per LF · qty 3642.0 · bid tab
|
| sewer service | LF | 1 | $127.00 | $127.00 to $127.00 | Bids- 2024-03-19 · NCDOT · C204822 · $127.00 per LF · qty 1003.0 · bid tab
|
| sidewalk | EA | 2 | $3,538.64 | $2,051.28 to $5,026.00 | Bids- 2024-03-19 · NCDOT · C204822 · $5,026.00 per EA · qty 20.0 · bid tab
- 2023-12-19 · NCDOT · C204842 · $2,051.28 per EA · qty 18.0 · bid tab
|
| sidewalk | SY | 5 | $143.00 | $45.13 to $160.00 | Bids- 2026-03-17 · NCDOT · C205179 · $155.00 per SY · qty 792.0 · bid tab
- 2025-11-18 · NCDOT · C205154 · $160.00 per SY · qty 468.0 · bid tab
- 2024-03-19 · NCDOT · C204822 · $143.00 per SY · qty 1280.0 · bid tab
- 2024-03-19 · NCDOT · C204822 · $83.00 per SY · qty 2370.0 · bid tab
- 2023-12-19 · NCDOT · C204842 · $45.13 per SY · qty 2450.0 · bid tab
|
| storm pipe 15-inch | LF | 2 | $140.75 | $131.50 to $150.00 | Bids- 2024-03-19 · NCDOT · C204822 · $150.00 per LF · qty 1024.0 · bid tab
- 2023-12-19 · NCDOT · C204842 · $131.50 per LF · qty 2892.0 · bid tab
|
| storm pipe 18-inch | LF | 2 | $144.25 | $138.50 to $150.00 | Bids- 2024-03-19 · NCDOT · C204822 · $150.00 per LF · qty 1348.0 · bid tab
- 2023-12-19 · NCDOT · C204842 · $138.50 per LF · qty 408.0 · bid tab
|
| storm pipe 24-inch | LF | 3 | $250.00 | $163.50 to $250.00 | Bids- 2024-03-19 · NCDOT · C204822 · $250.00 per LF · qty 228.0 · bid tab
- 2024-03-19 · NCDOT · C204822 · $250.00 per LF · qty 116.0 · bid tab
- 2023-12-19 · NCDOT · C204842 · $163.50 per LF · qty 204.0 · bid tab
|
| storm pipe 30-inch | LF | 2 | $562.50 | $375.00 to $750.00 | Bids- 2024-03-19 · NCDOT · C204822 · $750.00 per LF · qty 60.0 · bid tab
- 2024-03-19 · NCDOT · C204822 · $375.00 per LF · qty 60.0 · bid tab
|
| storm pipe 36-inch | LF | 1 | $234.40 | $234.40 to $234.40 | Bids- 2023-12-19 · NCDOT · C204842 · $234.40 per LF · qty 224.0 · bid tab
|
| storm pipe 72-inch | LF | 1 | $958.50 | $958.50 to $958.50 | Bids- 2023-12-19 · NCDOT · C204842 · $958.50 per LF · qty 144.0 · bid tab
|
| water main 12-inch | LF | 2 | $256.00 | $195.00 to $317.00 | Bids- 2024-03-19 · NCDOT · C204822 · $317.00 per LF · qty 254.0 · bid tab
- 2023-12-19 · NCDOT · C204842 · $195.00 per LF · qty 472.0 · bid tab
|
| water main 6-inch | LF | 2 | $311.00 | $267.00 to $355.00 | Bids- 2024-03-19 · NCDOT · C204822 · $355.00 per LF · qty 6.0 · bid tab
- 2023-12-19 · NCDOT · C204842 · $267.00 per LF · qty 172.0 · bid tab
|
| water main 8-inch | LF | 2 | $205.00 | $126.00 to $284.00 | Bids- 2024-03-19 · NCDOT · C204822 · $284.00 per LF · qty 420.0 · bid tab
- 2023-12-19 · NCDOT · C204842 · $126.00 per LF · qty 2705.0 · bid tab
|
| water service | LF | 2 | $53.50 | $31.00 to $76.00 | Bids- 2024-03-19 · NCDOT · C204822 · $31.00 per LF · qty 878.0 · bid tab