| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 1 | $595.00 | $595.00 to $595.00 | Bids- 2023-11-21 · NCDOT · C204904 · $595.00 per TON · qty 1195.0 · bid tab
|
| curb gutter | LF | 4 | $25.25 | $24.00 to $30.00 | Bids- 2023-11-21 · NCDOT · C204904 · $25.00 per LF · qty 470.0 · bid tab
- 2023-11-21 · NCDOT · C204904 · $25.50 per LF · qty 2890.0 · bid tab
- 2023-11-21 · NCDOT · C204904 · $24.00 per LF · qty 1130.0 · bid tab
- 2023-11-21 · NCDOT · C204904 · $30.00 per LF · qty 11650.0 · bid tab
|
| excavation embankment | CY | 1 | $28.00 | $28.00 to $28.00 | Bids- 2023-11-21 · NCDOT · C204904 · $28.00 per CY · qty 23750.0 · bid tab
|
| fire hydrant | EA | 1 | $7,500.00 | $7,500.00 to $7,500.00 | Bids- 2023-11-21 · NCDOT · C204904 · $7,500.00 per EA · qty 2.0 · bid tab
|
| fire hydrant | LF | 1 | $110.00 | $110.00 to $110.00 | Bids- 2023-11-21 · NCDOT · C204904 · $110.00 per LF · qty 52.0 · bid tab
|
| flexible base | TON | 1 | $85.00 | $85.00 to $85.00 | Bids- 2023-11-21 · NCDOT · C204904 · $85.00 per TON · qty 1113.0 · bid tab
|
| inlet headwall | EA | 1 | $2,000.00 | $2,000.00 to $2,000.00 | Bids- 2023-11-21 · NCDOT · C204904 · $2,000.00 per EA · qty 8.0 · bid tab
|
| lime cement stabilization | SY | 1 | $3.50 | $3.50 to $3.50 | Bids- 2023-11-21 · NCDOT · C204904 · $3.50 per SY · qty 2000.0 · bid tab
|
| lime cement stabilization | TON | 1 | $40.00 | $40.00 to $40.00 | Bids- 2023-11-21 · NCDOT · C204904 · $40.00 per TON · qty 1000.0 · bid tab
|
| manhole | EA | 4 | $1,250.00 | $750.00 to $8,000.00 | Bids- 2023-11-21 · NCDOT · C204904 · $1,000.00 per EA · qty 3.0 · bid tab
- 2023-11-21 · NCDOT · C204904 · $1,500.00 per EA · qty 4.0 · bid tab
- 2023-11-21 · NCDOT · C204904 · $8,000.00 per EA · qty 4.0 · bid tab
- 2023-11-21 · NCDOT · C204904 · $750.00 per EA · qty 18.0 · bid tab
|
| sewer main 4-inch | LF | 1 | $95.00 | $95.00 to $95.00 | Bids- 2023-11-21 · NCDOT · C204904 · $95.00 per LF · qty 24.0 · bid tab
|
| sewer main 8-inch | LF | 1 | $250.00 | $250.00 to $250.00 | Bids- 2023-11-21 · NCDOT · C204904 · $250.00 per LF · qty 337.0 · bid tab
|
| sewer service | LF | 1 | $125.00 | $125.00 to $125.00 | Bids- 2023-11-21 · NCDOT · C204904 · $125.00 per LF · qty 10.0 · bid tab
|
| sidewalk | EA | 1 | $2,200.00 | $2,200.00 to $2,200.00 | Bids- 2023-11-21 · NCDOT · C204904 · $2,200.00 per EA · qty 84.0 · bid tab
|
| sidewalk | SY | 2 | $89.00 | $68.00 to $110.00 | Bids- 2023-11-21 · NCDOT · C204904 · $110.00 per SY · qty 320.0 · bid tab
- 2023-11-21 · NCDOT · C204904 · $68.00 per SY · qty 5510.0 · bid tab
|
| storm pipe 10-inch | LF | 1 | $175.00 | $175.00 to $175.00 | Bids- 2023-11-21 · NCDOT · C204904 · $175.00 per LF · qty 10.0 · bid tab
|
| storm pipe 12-inch | LF | 1 | $90.00 | $90.00 to $90.00 | Bids- 2023-11-21 · NCDOT · C204904 · $90.00 per LF · qty 50.0 · bid tab
|
| storm pipe 15-inch | LF | 3 | $140.00 | $115.00 to $150.00 | Bids- 2023-11-21 · NCDOT · C204904 · $115.00 per LF · qty 552.0 · bid tab
- 2023-11-21 · NCDOT · C204904 · $140.00 per LF · qty 2904.0 · bid tab
- 2023-11-21 · NCDOT · C204904 · $150.00 per LF · qty 1124.0 · bid tab
|
| storm pipe 18-inch | LF | 3 | $150.00 | $135.00 to $160.00 | Bids- 2023-11-21 · NCDOT · C204904 · $160.00 per LF · qty 360.0 · bid tab
- 2023-11-21 · NCDOT · C204904 · $150.00 per LF · qty 116.0 · bid tab
- 2023-11-21 · NCDOT · C204904 · $135.00 per LF · qty 516.0 · bid tab
|
| storm pipe 24-inch | LF | 3 | $185.00 | $165.00 to $200.00 | Bids- 2023-11-21 · NCDOT · C204904 · $200.00 per LF · qty 124.0 · bid tab
- 2023-11-21 · NCDOT · C204904 · $165.00 per LF · qty 368.0 · bid tab
- 2023-11-21 · NCDOT · C204904 · $185.00 per LF · qty 436.0 · bid tab
|
| storm pipe 30-inch | LF | 2 | $240.00 | $230.00 to $250.00 | Bids- 2023-11-21 · NCDOT · C204904 · $250.00 per LF · qty 44.0 · bid tab
- 2023-11-21 · NCDOT · C204904 · $230.00 per LF · qty 664.0 · bid tab
|
| storm pipe 36-inch | LF | 1 | $250.00 | $250.00 to $250.00 | Bids- 2023-11-21 · NCDOT · C204904 · $250.00 per LF · qty 144.0 · bid tab
|
| storm pipe 54-inch | LF | 1 | $850.00 | $850.00 to $850.00 | Bids- 2023-11-21 · NCDOT · C204904 · $850.00 per LF · qty 128.0 · bid tab
|
| storm pipe 72-inch | LF | 1 | $1,250.00 | $1,250.00 to $1,250.00 | Bids- 2023-11-21 · NCDOT · C204904 · $1,250.00 per LF · qty 77.0 · bid tab
|
| water main 10-inch | LF | 1 | $225.00 | $225.00 to $225.00 | Bids- 2023-11-21 · NCDOT · C204904 · $225.00 per LF · qty 3665.0 · bid tab
|
| water main 12-inch | LF | 1 | $275.00 | $275.00 to $275.00 | Bids- 2023-11-21 · NCDOT · C204904 · $275.00 per LF · qty 328.0 · bid tab
|
| water main 2-inch | LF | 1 | $125.00 | $125.00 to $125.00 | Bids- 2023-11-21 · NCDOT · C204904 · $125.00 per LF · qty 173.0 · bid tab
|
| water main 6-inch | LF | 1 | $275.00 | $275.00 to $275.00 | Bids- 2023-11-21 · NCDOT · C204904 · $275.00 per LF · qty 69.0 · bid tab
|
| water main 8-inch | LF | 1 | $275.00 | $275.00 to $275.00 | Bids- 2023-11-21 · NCDOT · C204904 · $275.00 per LF · qty 359.0 · bid tab
|
| water service | LF | 1 | $65.00 | $65.00 to $65.00 | Bids- 2023-11-21 · NCDOT · C204904 · $65.00 per LF · qty 1502.0 · bid tab
|