PadstakeGet the fee reports
Menu

Site-work prices, Transylvania County, NC

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON1$595.00$595.00 to $595.00
Bids
  • 2023-11-21 · NCDOT · C204904 · $595.00 per TON · qty 1195.0 · bid tab
curb gutterLF4$25.25$24.00 to $30.00
Bids
  • 2023-11-21 · NCDOT · C204904 · $25.00 per LF · qty 470.0 · bid tab
  • 2023-11-21 · NCDOT · C204904 · $25.50 per LF · qty 2890.0 · bid tab
  • 2023-11-21 · NCDOT · C204904 · $24.00 per LF · qty 1130.0 · bid tab
  • 2023-11-21 · NCDOT · C204904 · $30.00 per LF · qty 11650.0 · bid tab
excavation embankmentCY1$28.00$28.00 to $28.00
Bids
  • 2023-11-21 · NCDOT · C204904 · $28.00 per CY · qty 23750.0 · bid tab
fire hydrantEA1$7,500.00$7,500.00 to $7,500.00
Bids
  • 2023-11-21 · NCDOT · C204904 · $7,500.00 per EA · qty 2.0 · bid tab
fire hydrantLF1$110.00$110.00 to $110.00
Bids
  • 2023-11-21 · NCDOT · C204904 · $110.00 per LF · qty 52.0 · bid tab
flexible baseTON1$85.00$85.00 to $85.00
Bids
  • 2023-11-21 · NCDOT · C204904 · $85.00 per TON · qty 1113.0 · bid tab
inlet headwallEA1$2,000.00$2,000.00 to $2,000.00
Bids
  • 2023-11-21 · NCDOT · C204904 · $2,000.00 per EA · qty 8.0 · bid tab
lime cement stabilizationSY1$3.50$3.50 to $3.50
Bids
  • 2023-11-21 · NCDOT · C204904 · $3.50 per SY · qty 2000.0 · bid tab
lime cement stabilizationTON1$40.00$40.00 to $40.00
Bids
  • 2023-11-21 · NCDOT · C204904 · $40.00 per TON · qty 1000.0 · bid tab
manholeEA4$1,250.00$750.00 to $8,000.00
Bids
  • 2023-11-21 · NCDOT · C204904 · $1,000.00 per EA · qty 3.0 · bid tab
  • 2023-11-21 · NCDOT · C204904 · $1,500.00 per EA · qty 4.0 · bid tab
  • 2023-11-21 · NCDOT · C204904 · $8,000.00 per EA · qty 4.0 · bid tab
  • 2023-11-21 · NCDOT · C204904 · $750.00 per EA · qty 18.0 · bid tab
sewer main 4-inchLF1$95.00$95.00 to $95.00
Bids
  • 2023-11-21 · NCDOT · C204904 · $95.00 per LF · qty 24.0 · bid tab
sewer main 8-inchLF1$250.00$250.00 to $250.00
Bids
  • 2023-11-21 · NCDOT · C204904 · $250.00 per LF · qty 337.0 · bid tab
sewer serviceLF1$125.00$125.00 to $125.00
Bids
  • 2023-11-21 · NCDOT · C204904 · $125.00 per LF · qty 10.0 · bid tab
sidewalkEA1$2,200.00$2,200.00 to $2,200.00
Bids
  • 2023-11-21 · NCDOT · C204904 · $2,200.00 per EA · qty 84.0 · bid tab
sidewalkSY2$89.00$68.00 to $110.00
Bids
  • 2023-11-21 · NCDOT · C204904 · $110.00 per SY · qty 320.0 · bid tab
  • 2023-11-21 · NCDOT · C204904 · $68.00 per SY · qty 5510.0 · bid tab
storm pipe 10-inchLF1$175.00$175.00 to $175.00
Bids
  • 2023-11-21 · NCDOT · C204904 · $175.00 per LF · qty 10.0 · bid tab
storm pipe 12-inchLF1$90.00$90.00 to $90.00
Bids
  • 2023-11-21 · NCDOT · C204904 · $90.00 per LF · qty 50.0 · bid tab
storm pipe 15-inchLF3$140.00$115.00 to $150.00
Bids
  • 2023-11-21 · NCDOT · C204904 · $115.00 per LF · qty 552.0 · bid tab
  • 2023-11-21 · NCDOT · C204904 · $140.00 per LF · qty 2904.0 · bid tab
  • 2023-11-21 · NCDOT · C204904 · $150.00 per LF · qty 1124.0 · bid tab
storm pipe 18-inchLF3$150.00$135.00 to $160.00
Bids
  • 2023-11-21 · NCDOT · C204904 · $160.00 per LF · qty 360.0 · bid tab
  • 2023-11-21 · NCDOT · C204904 · $150.00 per LF · qty 116.0 · bid tab
  • 2023-11-21 · NCDOT · C204904 · $135.00 per LF · qty 516.0 · bid tab
storm pipe 24-inchLF3$185.00$165.00 to $200.00
Bids
  • 2023-11-21 · NCDOT · C204904 · $200.00 per LF · qty 124.0 · bid tab
  • 2023-11-21 · NCDOT · C204904 · $165.00 per LF · qty 368.0 · bid tab
  • 2023-11-21 · NCDOT · C204904 · $185.00 per LF · qty 436.0 · bid tab
storm pipe 30-inchLF2$240.00$230.00 to $250.00
Bids
  • 2023-11-21 · NCDOT · C204904 · $250.00 per LF · qty 44.0 · bid tab
  • 2023-11-21 · NCDOT · C204904 · $230.00 per LF · qty 664.0 · bid tab
storm pipe 36-inchLF1$250.00$250.00 to $250.00
Bids
  • 2023-11-21 · NCDOT · C204904 · $250.00 per LF · qty 144.0 · bid tab
storm pipe 54-inchLF1$850.00$850.00 to $850.00
Bids
  • 2023-11-21 · NCDOT · C204904 · $850.00 per LF · qty 128.0 · bid tab
storm pipe 72-inchLF1$1,250.00$1,250.00 to $1,250.00
Bids
  • 2023-11-21 · NCDOT · C204904 · $1,250.00 per LF · qty 77.0 · bid tab
water main 10-inchLF1$225.00$225.00 to $225.00
Bids
  • 2023-11-21 · NCDOT · C204904 · $225.00 per LF · qty 3665.0 · bid tab
water main 12-inchLF1$275.00$275.00 to $275.00
Bids
  • 2023-11-21 · NCDOT · C204904 · $275.00 per LF · qty 328.0 · bid tab
water main 2-inchLF1$125.00$125.00 to $125.00
Bids
  • 2023-11-21 · NCDOT · C204904 · $125.00 per LF · qty 173.0 · bid tab
water main 6-inchLF1$275.00$275.00 to $275.00
Bids
  • 2023-11-21 · NCDOT · C204904 · $275.00 per LF · qty 69.0 · bid tab
water main 8-inchLF1$275.00$275.00 to $275.00
Bids
  • 2023-11-21 · NCDOT · C204904 · $275.00 per LF · qty 359.0 · bid tab
water serviceLF1$65.00$65.00 to $65.00
Bids
  • 2023-11-21 · NCDOT · C204904 · $65.00 per LF · qty 1502.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.