| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 2 | $732.50 | $725.00 to $740.00 | Bids- 2025-09-16 · NCDOT · C205099 · $725.00 per TON · qty 445.0 · bid tab
- 2024-04-16 · NCDOT · C204208 · $740.00 per TON · qty 515.0 · bid tab
|
| curb gutter | LF | 3 | $32.00 | $28.00 to $40.00 | Bids- 2025-09-16 · NCDOT · C205099 · $40.00 per LF · qty 280.0 · bid tab
- 2025-09-16 · NCDOT · C205099 · $32.00 per LF · qty 2350.0 · bid tab
- 2025-09-16 · NCDOT · C205099 · $28.00 per LF · qty 1870.0 · bid tab
|
| excavation embankment | CY | 1 | $1.00 | $1.00 to $1.00 | Bids- 2025-09-16 · NCDOT · C205099 · $1.00 per CY · qty 23000.0 · bid tab
|
| fire hydrant | EA | 1 | $11,569.02 | $11,569.02 to $11,569.02 | Bids- 2025-09-16 · NCDOT · C205099 · $11,569.02 per EA · qty 1.0 · bid tab
|
| flexible base | TON | 2 | $45.40 | $43.45 to $47.34 | Bids- 2025-09-16 · NCDOT · C205099 · $47.34 per TON · qty 3395.0 · bid tab
- 2024-04-16 · NCDOT · C204208 · $43.45 per TON · qty 3640.0 · bid tab
|
| inlet headwall | EA | 1 | $2,500.00 | $2,500.00 to $2,500.00 | Bids- 2025-09-16 · NCDOT · C205099 · $2,500.00 per EA · qty 3.0 · bid tab
|
| lime cement stabilization | SY | 4 | $5.71 | $3.65 to $6.25 | Bids- 2025-09-16 · NCDOT · C205099 · $6.25 per SY · qty 600.0 · bid tab
- 2025-09-16 · NCDOT · C205099 · $5.37 per SY · qty 700.0 · bid tab
- 2024-04-16 · NCDOT · C204208 · $6.05 per SY · qty 1100.0 · bid tab
- 2024-04-16 · NCDOT · C204208 · $3.65 per SY · qty 900.0 · bid tab
|
| lime cement stabilization | TON | 2 | $48.65 | $44.80 to $52.50 | Bids- 2025-09-16 · NCDOT · C205099 · $52.50 per TON · qty 400.0 · bid tab
- 2024-04-16 · NCDOT · C204208 · $44.80 per TON · qty 200.0 · bid tab
|
| manhole | EA | 2 | $6,371.53 | $1,600.00 to $11,143.06 | Bids- 2025-09-16 · NCDOT · C205099 · $1,600.00 per EA · qty 1.0 · bid tab
- 2025-09-16 · NCDOT · C205099 · $11,143.06 per EA · qty 2.0 · bid tab
|
| sewer main 8-inch | LF | 1 | $467.30 | $467.30 to $467.30 | Bids- 2025-09-16 · NCDOT · C205099 · $467.30 per LF · qty 142.0 · bid tab
|
| storm pipe 15-inch | LF | 2 | $126.24 | $122.42 to $130.05 | Bids- 2025-09-16 · NCDOT · C205099 · $122.42 per LF · qty 1300.0 · bid tab
- 2025-09-16 · NCDOT · C205099 · $130.05 per LF · qty 24.0 · bid tab
|
| storm pipe 18-inch | LF | 3 | $141.61 | $126.46 to $153.47 | Bids- 2025-09-16 · NCDOT · C205099 · $141.61 per LF · qty 104.0 · bid tab
- 2025-09-16 · NCDOT · C205099 · $153.47 per LF · qty 240.0 · bid tab
- 2024-04-16 · NCDOT · C204208 · $126.46 per LF · qty 228.0 · bid tab
|
| water main 8-inch | LF | 1 | $121.69 | $121.69 to $121.69 | Bids- 2025-09-16 · NCDOT · C205099 · $121.69 per LF · qty 791.0 · bid tab
|