Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON4$501.00$400.00 to $630.00
Bids
  • 2026-04-21 · NCDOT · C205192 · $400.00 per TON · qty 2875.0 · bid tab
  • 2025-06-17 · NCDOT · C205110 · $577.00 per TON · qty 2006.0 · bid tab
  • 2024-06-18 · NCDOT · C204965 · $425.00 per TON · qty 1965.0 · bid tab
  • 2023-12-19 · NCDOT · C204831 · $630.00 per TON · qty 75.0 · bid tab
excavation embankmentCY3$35.20$8.00 to $69.00
Bids
  • 2026-04-21 · NCDOT · C205192 · $35.20 per CY · qty 1605.0 · bid tab
  • 2025-06-17 · NCDOT · C205110 · $69.00 per CY · qty 2660.0 · bid tab
  • 2024-06-18 · NCDOT · C204965 · $8.00 per CY · qty 2948.0 · bid tab
flexible baseTON1$46.38$46.38 to $46.38
Bids
  • 2023-12-19 · NCDOT · C204831 · $46.38 per TON · qty 1204.0 · bid tab
lime cement stabilizationSY1$3.44$3.44 to $3.44
Bids
  • 2023-12-19 · NCDOT · C204831 · $3.44 per SY · qty 1400.0 · bid tab
manholeEA1$800.00$800.00 to $800.00
Bids
  • 2026-04-21 · NCDOT · C205192 · $800.00 per EA · qty 4.0 · bid tab
storm pipe 15-inchLF1$131.22$131.22 to $131.22
Bids
  • 2023-12-19 · NCDOT · C204831 · $131.22 per LF · qty 80.0 · bid tab
storm pipe 36-inchLF1$201.09$201.09 to $201.09
Bids
  • 2023-12-19 · NCDOT · C204831 · $201.09 per LF · qty 72.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.