Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON3$590.00$566.00 to $850.00
Bids
  • 2026-08-18 · NCDOT · C205205 · $850.00 per TON · qty 145.0 · bid tab
  • 2026-02-17 · NCDOT · C205036 · $566.00 per TON · qty 2525.0 · bid tab
  • 2025-11-18 · NCDOT · C205069 · $590.00 per TON · qty 35.0 · bid tab
curb gutterLF7$48.10$29.90 to $52.10
Bids
  • 2026-02-17 · NCDOT · C205036 · $50.30 per LF · qty 100.0 · bid tab
  • 2026-02-17 · NCDOT · C205036 · $52.10 per LF · qty 180.0 · bid tab
  • 2026-02-17 · NCDOT · C205036 · $40.00 per LF · qty 295.0 · bid tab
  • 2026-02-17 · NCDOT · C205036 · $48.10 per LF · qty 360.0 · bid tab
  • 2026-02-17 · NCDOT · C205036 · $29.90 per LF · qty 22400.0 · bid tab
  • 2026-02-17 · NCDOT · C205036 · $33.25 per LF · qty 710.0 · bid tab
  • 2025-11-18 · NCDOT · C205069 · $50.40 per LF · qty 630.0 · bid tab
excavation embankmentCY3$12.50$7.50 to $33.60
Bids
  • 2026-08-18 · NCDOT · C205205 · $12.50 per CY · qty 120000.0 · bid tab
  • 2026-08-18 · NCDOT · C205205 · $7.50 per CY · qty 4000.0 · bid tab
  • 2025-11-18 · NCDOT · C205069 · $33.60 per CY · qty 1400.0 · bid tab
fire hydrantLF1$225.00$225.00 to $225.00
Bids
  • 2026-02-17 · NCDOT · C205036 · $225.00 per LF · qty 530.0 · bid tab
flexible baseTON1$60.00$60.00 to $60.00
Bids
  • 2026-08-18 · NCDOT · C205205 · $60.00 per TON · qty 272.0 · bid tab
inlet headwallEA1$1,200.00$1,200.00 to $1,200.00
Bids
  • 2026-02-17 · NCDOT · C205036 · $1,200.00 per EA · qty 36.0 · bid tab
lime cement stabilizationSY6$3.05$1.12 to $5.00
Bids
  • 2026-08-18 · NCDOT · C205205 · $3.10 per SY · qty 1500.0 · bid tab
  • 2026-08-18 · NCDOT · C205205 · $3.00 per SY · qty 300.0 · bid tab
  • 2026-02-17 · NCDOT · C205036 · $5.00 per SY · qty 1500.0 · bid tab
  • 2026-02-17 · NCDOT · C205036 · $5.00 per SY · qty 9000.0 · bid tab
  • 2025-11-18 · NCDOT · C205069 · $1.12 per SY · qty 150.0 · bid tab
  • 2025-11-18 · NCDOT · C205069 · $1.12 per SY · qty 200.0 · bid tab
lime cement stabilizationTON5$48.00$42.00 to $54.00
Bids
  • 2026-08-18 · NCDOT · C205205 · $48.00 per TON · qty 200.0 · bid tab
  • 2026-08-18 · NCDOT · C205205 · $42.00 per TON · qty 250.0 · bid tab
  • 2026-02-17 · NCDOT · C205036 · $54.00 per TON · qty 75.0 · bid tab
  • 2026-02-17 · NCDOT · C205036 · $54.00 per TON · qty 6000.0 · bid tab
  • 2025-11-18 · NCDOT · C205069 · $44.80 per TON · qty 100.0 · bid tab
manholeEA3$1,500.00$950.00 to $8,200.00
Bids
  • 2026-02-17 · NCDOT · C205036 · $8,200.00 per EA · qty 30.0 · bid tab
  • 2026-02-17 · NCDOT · C205036 · $950.00 per EA · qty 24.0 · bid tab
  • 2026-02-17 · NCDOT · C205036 · $1,500.00 per EA · qty 19.0 · bid tab
sewer main 12-inchLF1$392.75$392.75 to $392.75
Bids
  • 2026-02-17 · NCDOT · C205036 · $392.75 per LF · qty 1107.0 · bid tab
sewer main 8-inchLF1$281.00$281.00 to $281.00
Bids
  • 2026-02-17 · NCDOT · C205036 · $281.00 per LF · qty 1545.0 · bid tab
sewer serviceLF1$254.50$254.50 to $254.50
Bids
  • 2026-02-17 · NCDOT · C205036 · $254.50 per LF · qty 363.0 · bid tab
sidewalkEA2$1,390.82$31.64 to $2,750.00
Bids
  • 2026-02-17 · NCDOT · C205036 · $2,750.00 per EA · qty 83.0 · bid tab
  • 2025-11-18 · NCDOT · C205069 · $31.64 per EA · qty 8.0 · bid tab
sidewalkSY4$85.85$58.25 to $112.00
Bids
  • 2026-02-17 · NCDOT · C205036 · $58.25 per SY · qty 6210.0 · bid tab
  • 2026-02-17 · NCDOT · C205036 · $104.50 per SY · qty 640.0 · bid tab
  • 2025-11-18 · NCDOT · C205069 · $112.00 per SY · qty 20.0 · bid tab
  • 2025-11-18 · NCDOT · C205069 · $67.20 per SY · qty 470.0 · bid tab
storm pipe 12-inchLF1$95.00$95.00 to $95.00
Bids
  • 2026-02-17 · NCDOT · C205036 · $95.00 per LF · qty 52.0 · bid tab
storm pipe 15-inchLF3$105.00$78.40 to $115.00
Bids
  • 2026-08-18 · NCDOT · C205205 · $115.00 per LF · qty 36.0 · bid tab
  • 2026-02-17 · NCDOT · C205036 · $105.00 per LF · qty 9916.0 · bid tab
  • 2025-11-18 · NCDOT · C205069 · $78.40 per LF · qty 44.0 · bid tab
storm pipe 18-inchLF1$130.00$130.00 to $130.00
Bids
  • 2026-02-17 · NCDOT · C205036 · $130.00 per LF · qty 2624.0 · bid tab
storm pipe 24-inchLF1$165.00$165.00 to $165.00
Bids
  • 2026-02-17 · NCDOT · C205036 · $165.00 per LF · qty 4302.0 · bid tab
storm pipe 30-inchLF2$177.50$140.00 to $215.00
Bids
  • 2026-08-18 · NCDOT · C205205 · $140.00 per LF · qty 264.0 · bid tab
  • 2026-02-17 · NCDOT · C205036 · $215.00 per LF · qty 960.0 · bid tab
storm pipe 36-inchLF2$220.00$175.00 to $265.00
Bids
  • 2026-08-18 · NCDOT · C205205 · $175.00 per LF · qty 272.0 · bid tab
  • 2026-02-17 · NCDOT · C205036 · $265.00 per LF · qty 1446.0 · bid tab
storm pipe 42-inchLF1$320.00$320.00 to $320.00
Bids
  • 2026-02-17 · NCDOT · C205036 · $320.00 per LF · qty 300.0 · bid tab
storm pipe 60-inchLF1$650.00$650.00 to $650.00
Bids
  • 2026-02-17 · NCDOT · C205036 · $650.00 per LF · qty 32.0 · bid tab
storm pipe 72-inchLF2$1,080.20$850.00 to $1,310.40
Bids
  • 2026-02-17 · NCDOT · C205036 · $850.00 per LF · qty 252.0 · bid tab
  • 2025-11-18 · NCDOT · C205069 · $1,310.40 per LF · qty 112.0 · bid tab
water main 12-inchLF1$343.50$343.50 to $343.50
Bids
  • 2026-02-17 · NCDOT · C205036 · $343.50 per LF · qty 1676.0 · bid tab
water main 6-inchLF1$208.00$208.00 to $208.00
Bids
  • 2026-02-17 · NCDOT · C205036 · $208.00 per LF · qty 423.0 · bid tab
water main 8-inchLF2$155.12$90.00 to $220.25
Bids
  • 2026-08-18 · NCDOT · C205205 · $90.00 per LF · qty 1384.0 · bid tab
  • 2026-02-17 · NCDOT · C205036 · $220.25 per LF · qty 2981.0 · bid tab
water serviceLF2$129.25$80.00 to $178.50
Bids
  • 2026-08-18 · NCDOT · C205205 · $80.00 per LF · qty 7.0 · bid tab
  • 2026-02-17 · NCDOT · C205036 · $178.50 per LF · qty 1107.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.