| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 3 | $590.00 | $566.00 to $850.00 | Bids- 2026-08-18 · NCDOT · C205205 · $850.00 per TON · qty 145.0 · bid tab
- 2026-02-17 · NCDOT · C205036 · $566.00 per TON · qty 2525.0 · bid tab
- 2025-11-18 · NCDOT · C205069 · $590.00 per TON · qty 35.0 · bid tab
|
| curb gutter | LF | 7 | $48.10 | $29.90 to $52.10 | Bids- 2026-02-17 · NCDOT · C205036 · $50.30 per LF · qty 100.0 · bid tab
- 2026-02-17 · NCDOT · C205036 · $52.10 per LF · qty 180.0 · bid tab
- 2026-02-17 · NCDOT · C205036 · $40.00 per LF · qty 295.0 · bid tab
- 2026-02-17 · NCDOT · C205036 · $48.10 per LF · qty 360.0 · bid tab
- 2026-02-17 · NCDOT · C205036 · $29.90 per LF · qty 22400.0 · bid tab
- 2026-02-17 · NCDOT · C205036 · $33.25 per LF · qty 710.0 · bid tab
- 2025-11-18 · NCDOT · C205069 · $50.40 per LF · qty 630.0 · bid tab
|
| excavation embankment | CY | 3 | $12.50 | $7.50 to $33.60 | Bids- 2026-08-18 · NCDOT · C205205 · $12.50 per CY · qty 120000.0 · bid tab
- 2026-08-18 · NCDOT · C205205 · $7.50 per CY · qty 4000.0 · bid tab
- 2025-11-18 · NCDOT · C205069 · $33.60 per CY · qty 1400.0 · bid tab
|
| fire hydrant | LF | 1 | $225.00 | $225.00 to $225.00 | Bids- 2026-02-17 · NCDOT · C205036 · $225.00 per LF · qty 530.0 · bid tab
|
| flexible base | TON | 1 | $60.00 | $60.00 to $60.00 | Bids- 2026-08-18 · NCDOT · C205205 · $60.00 per TON · qty 272.0 · bid tab
|
| inlet headwall | EA | 1 | $1,200.00 | $1,200.00 to $1,200.00 | Bids- 2026-02-17 · NCDOT · C205036 · $1,200.00 per EA · qty 36.0 · bid tab
|
| lime cement stabilization | SY | 6 | $3.05 | $1.12 to $5.00 | Bids- 2026-08-18 · NCDOT · C205205 · $3.10 per SY · qty 1500.0 · bid tab
- 2026-08-18 · NCDOT · C205205 · $3.00 per SY · qty 300.0 · bid tab
- 2026-02-17 · NCDOT · C205036 · $5.00 per SY · qty 1500.0 · bid tab
- 2026-02-17 · NCDOT · C205036 · $5.00 per SY · qty 9000.0 · bid tab
- 2025-11-18 · NCDOT · C205069 · $1.12 per SY · qty 150.0 · bid tab
- 2025-11-18 · NCDOT · C205069 · $1.12 per SY · qty 200.0 · bid tab
|
| lime cement stabilization | TON | 5 | $48.00 | $42.00 to $54.00 | Bids- 2026-08-18 · NCDOT · C205205 · $48.00 per TON · qty 200.0 · bid tab
- 2026-08-18 · NCDOT · C205205 · $42.00 per TON · qty 250.0 · bid tab
- 2026-02-17 · NCDOT · C205036 · $54.00 per TON · qty 75.0 · bid tab
- 2026-02-17 · NCDOT · C205036 · $54.00 per TON · qty 6000.0 · bid tab
- 2025-11-18 · NCDOT · C205069 · $44.80 per TON · qty 100.0 · bid tab
|
| manhole | EA | 3 | $1,500.00 | $950.00 to $8,200.00 | Bids- 2026-02-17 · NCDOT · C205036 · $8,200.00 per EA · qty 30.0 · bid tab
- 2026-02-17 · NCDOT · C205036 · $950.00 per EA · qty 24.0 · bid tab
- 2026-02-17 · NCDOT · C205036 · $1,500.00 per EA · qty 19.0 · bid tab
|
| sewer main 12-inch | LF | 1 | $392.75 | $392.75 to $392.75 | Bids- 2026-02-17 · NCDOT · C205036 · $392.75 per LF · qty 1107.0 · bid tab
|
| sewer main 8-inch | LF | 1 | $281.00 | $281.00 to $281.00 | Bids- 2026-02-17 · NCDOT · C205036 · $281.00 per LF · qty 1545.0 · bid tab
|
| sewer service | LF | 1 | $254.50 | $254.50 to $254.50 | Bids- 2026-02-17 · NCDOT · C205036 · $254.50 per LF · qty 363.0 · bid tab
|
| sidewalk | EA | 2 | $1,390.82 | $31.64 to $2,750.00 | Bids- 2026-02-17 · NCDOT · C205036 · $2,750.00 per EA · qty 83.0 · bid tab
- 2025-11-18 · NCDOT · C205069 · $31.64 per EA · qty 8.0 · bid tab
|
| sidewalk | SY | 4 | $85.85 | $58.25 to $112.00 | Bids- 2026-02-17 · NCDOT · C205036 · $58.25 per SY · qty 6210.0 · bid tab
- 2026-02-17 · NCDOT · C205036 · $104.50 per SY · qty 640.0 · bid tab
- 2025-11-18 · NCDOT · C205069 · $112.00 per SY · qty 20.0 · bid tab
- 2025-11-18 · NCDOT · C205069 · $67.20 per SY · qty 470.0 · bid tab
|
| storm pipe 12-inch | LF | 1 | $95.00 | $95.00 to $95.00 | Bids- 2026-02-17 · NCDOT · C205036 · $95.00 per LF · qty 52.0 · bid tab
|
| storm pipe 15-inch | LF | 3 | $105.00 | $78.40 to $115.00 | Bids- 2026-08-18 · NCDOT · C205205 · $115.00 per LF · qty 36.0 · bid tab
- 2026-02-17 · NCDOT · C205036 · $105.00 per LF · qty 9916.0 · bid tab
- 2025-11-18 · NCDOT · C205069 · $78.40 per LF · qty 44.0 · bid tab
|
| storm pipe 18-inch | LF | 1 | $130.00 | $130.00 to $130.00 | Bids- 2026-02-17 · NCDOT · C205036 · $130.00 per LF · qty 2624.0 · bid tab
|
| storm pipe 24-inch | LF | 1 | $165.00 | $165.00 to $165.00 | Bids- 2026-02-17 · NCDOT · C205036 · $165.00 per LF · qty 4302.0 · bid tab
|
| storm pipe 30-inch | LF | 2 | $177.50 | $140.00 to $215.00 | Bids- 2026-08-18 · NCDOT · C205205 · $140.00 per LF · qty 264.0 · bid tab
- 2026-02-17 · NCDOT · C205036 · $215.00 per LF · qty 960.0 · bid tab
|
| storm pipe 36-inch | LF | 2 | $220.00 | $175.00 to $265.00 | Bids- 2026-08-18 · NCDOT · C205205 · $175.00 per LF · qty 272.0 · bid tab
- 2026-02-17 · NCDOT · C205036 · $265.00 per LF · qty 1446.0 · bid tab
|
| storm pipe 42-inch | LF | 1 | $320.00 | $320.00 to $320.00 | Bids- 2026-02-17 · NCDOT · C205036 · $320.00 per LF · qty 300.0 · bid tab
|
| storm pipe 60-inch | LF | 1 | $650.00 | $650.00 to $650.00 | Bids- 2026-02-17 · NCDOT · C205036 · $650.00 per LF · qty 32.0 · bid tab
|
| storm pipe 72-inch | LF | 2 | $1,080.20 | $850.00 to $1,310.40 | Bids- 2026-02-17 · NCDOT · C205036 · $850.00 per LF · qty 252.0 · bid tab
- 2025-11-18 · NCDOT · C205069 · $1,310.40 per LF · qty 112.0 · bid tab
|
| water main 12-inch | LF | 1 | $343.50 | $343.50 to $343.50 | Bids- 2026-02-17 · NCDOT · C205036 · $343.50 per LF · qty 1676.0 · bid tab
|
| water main 6-inch | LF | 1 | $208.00 | $208.00 to $208.00 | Bids- 2026-02-17 · NCDOT · C205036 · $208.00 per LF · qty 423.0 · bid tab
|
| water main 8-inch | LF | 2 | $155.12 | $90.00 to $220.25 | Bids- 2026-08-18 · NCDOT · C205205 · $90.00 per LF · qty 1384.0 · bid tab
- 2026-02-17 · NCDOT · C205036 · $220.25 per LF · qty 2981.0 · bid tab
|
| water service | LF | 2 | $129.25 | $80.00 to $178.50 | Bids- 2026-08-18 · NCDOT · C205205 · $80.00 per LF · qty 7.0 · bid tab
- 2026-02-17 · NCDOT · C205036 · $178.50 per LF · qty 1107.0 · bid tab
|