| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 1 | $575.00 | $575.00 to $575.00 | Bids- 2025-10-21 · NCDOT · C205092 · $575.00 per TON · qty 3870.0 · bid tab
|
| curb gutter | LF | 4 | $26.00 | $22.00 to $35.00 | Bids- 2025-10-21 · NCDOT · C205092 · $28.00 per LF · qty 2600.0 · bid tab
- 2025-10-21 · NCDOT · C205092 · $35.00 per LF · qty 60.0 · bid tab
- 2025-10-21 · NCDOT · C205092 · $22.00 per LF · qty 8700.0 · bid tab
- 2025-10-21 · NCDOT · C205092 · $24.00 per LF · qty 29800.0 · bid tab
|
| excavation embankment | CY | 2 | $17.25 | $12.50 to $22.00 | Bids- 2025-10-21 · NCDOT · C205092 · $12.50 per CY · qty 38000.0 · bid tab
- 2025-10-21 · NCDOT · C205092 · $22.00 per CY · qty 48000.0 · bid tab
|
| fire hydrant | EA | 1 | $11,000.00 | $11,000.00 to $11,000.00 | Bids- 2025-10-21 · NCDOT · C205092 · $11,000.00 per EA · qty 31.0 · bid tab
|
| fire hydrant | LF | 1 | $85.00 | $85.00 to $85.00 | Bids- 2025-10-21 · NCDOT · C205092 · $85.00 per LF · qty 152.0 · bid tab
|
| flexible base | TON | 1 | $55.00 | $55.00 to $55.00 | Bids- 2025-10-21 · NCDOT · C205092 · $55.00 per TON · qty 100.0 · bid tab
|
| inlet headwall | EA | 1 | $1,100.00 | $1,100.00 to $1,100.00 | Bids- 2025-10-21 · NCDOT · C205092 · $1,100.00 per EA · qty 75.0 · bid tab
|
| lime cement stabilization | EA | 1 | $1,600.00 | $1,600.00 to $1,600.00 | Bids- 2025-10-21 · NCDOT · C205092 · $1,600.00 per EA · qty 20.0 · bid tab
|
| lime cement stabilization | SY | 2 | $3.00 | $2.75 to $3.25 | Bids- 2025-10-21 · NCDOT · C205092 · $3.25 per SY · qty 3700.0 · bid tab
- 2025-10-21 · NCDOT · C205092 · $2.75 per SY · qty 61170.0 · bid tab
|
| lime cement stabilization | TON | 2 | $34.12 | $27.25 to $41.00 | Bids- 2025-10-21 · NCDOT · C205092 · $27.25 per TON · qty 39750.0 · bid tab
- 2025-10-21 · NCDOT · C205092 · $41.00 per TON · qty 500.0 · bid tab
|
| manhole | EA | 5 | $2,500.00 | $768.00 to $16,000.00 | Bids- 2025-10-21 · NCDOT · C205092 · $2,500.00 per EA · qty 1.0 · bid tab
- 2025-10-21 · NCDOT · C205092 · $1,453.00 per EA · qty 19.0 · bid tab
- 2025-10-21 · NCDOT · C205092 · $768.00 per EA · qty 18.0 · bid tab
- 2025-10-21 · NCDOT · C205092 · $4,209.00 per EA · qty 2.0 · bid tab
- 2025-10-21 · NCDOT · C205092 · $16,000.00 per EA · qty 4.0 · bid tab
|
| sewer main 12-inch | LF | 1 | $130.00 | $130.00 to $130.00 | Bids- 2025-10-21 · NCDOT · C205092 · $130.00 per LF · qty 162.0 · bid tab
|
| sewer main 14-inch | LF | 1 | $195.00 | $195.00 to $195.00 | Bids- 2025-10-21 · NCDOT · C205092 · $195.00 per LF · qty 177.0 · bid tab
|
| sidewalk | EA | 1 | $1,950.00 | $1,950.00 to $1,950.00 | Bids- 2025-10-21 · NCDOT · C205092 · $1,950.00 per EA · qty 52.0 · bid tab
|
| sidewalk | SY | 2 | $56.00 | $37.00 to $75.00 | Bids- 2025-10-21 · NCDOT · C205092 · $75.00 per SY · qty 1500.0 · bid tab
- 2025-10-21 · NCDOT · C205092 · $37.00 per SY · qty 14300.0 · bid tab
|
| storm pipe 15-inch | LF | 3 | $102.15 | $85.90 to $105.50 | Bids- 2025-10-21 · NCDOT · C205092 · $85.90 per LF · qty 2024.0 · bid tab
- 2025-10-21 · NCDOT · C205092 · $105.50 per LF · qty 2104.0 · bid tab
- 2025-10-21 · NCDOT · C205092 · $102.15 per LF · qty 6996.0 · bid tab
|
| storm pipe 18-inch | LF | 3 | $141.80 | $133.60 to $142.10 | Bids- 2025-10-21 · NCDOT · C205092 · $142.10 per LF · qty 860.0 · bid tab
- 2025-10-21 · NCDOT · C205092 · $133.60 per LF · qty 576.0 · bid tab
- 2025-10-21 · NCDOT · C205092 · $141.80 per LF · qty 5198.0 · bid tab
|
| storm pipe 24-inch | LF | 3 | $155.75 | $123.50 to $182.60 | Bids- 2025-10-21 · NCDOT · C205092 · $155.75 per LF · qty 1488.0 · bid tab
- 2025-10-21 · NCDOT · C205092 · $123.50 per LF · qty 1476.0 · bid tab
- 2025-10-21 · NCDOT · C205092 · $182.60 per LF · qty 380.0 · bid tab
|
| storm pipe 30-inch | LF | 2 | $200.55 | $171.10 to $230.00 | Bids- 2025-10-21 · NCDOT · C205092 · $230.00 per LF · qty 96.0 · bid tab
- 2025-10-21 · NCDOT · C205092 · $171.10 per LF · qty 496.0 · bid tab
|
| storm pipe 36-inch | LF | 3 | $265.00 | $265.00 to $292.00 | Bids- 2025-10-21 · NCDOT · C205092 · $265.00 per LF · qty 160.0 · bid tab
- 2025-10-21 · NCDOT · C205092 · $292.00 per LF · qty 168.0 · bid tab
- 2025-10-21 · NCDOT · C205092 · $265.00 per LF · qty 104.0 · bid tab
|
| storm pipe 42-inch | LF | 2 | $370.75 | $336.50 to $405.00 | Bids- 2025-10-21 · NCDOT · C205092 · $336.50 per LF · qty 180.0 · bid tab
- 2025-10-21 · NCDOT · C205092 · $405.00 per LF · qty 180.0 · bid tab
|
| storm pipe 48-inch | LF | 1 | $785.00 | $785.00 to $785.00 | Bids- 2025-10-21 · NCDOT · C205092 · $785.00 per LF · qty 686.0 · bid tab
|
| storm pipe 60-inch | LF | 1 | $755.00 | $755.00 to $755.00 | Bids- 2025-10-21 · NCDOT · C205092 · $755.00 per LF · qty 92.0 · bid tab
|
| water main 10-inch | LF | 1 | $350.00 | $350.00 to $350.00 | Bids- 2025-10-21 · NCDOT · C205092 · $350.00 per LF · qty 13.0 · bid tab
|
| water main 12-inch | LF | 1 | $285.00 | $285.00 to $285.00 | Bids- 2025-10-21 · NCDOT · C205092 · $285.00 per LF · qty 89.0 · bid tab
|
| water main 24-inch | LF | 1 | $380.00 | $380.00 to $380.00 | Bids- 2025-10-21 · NCDOT · C205092 · $380.00 per LF · qty 11666.0 · bid tab
|
| water main 30-inch | LF | 1 | $260.00 | $260.00 to $260.00 | Bids- 2025-10-21 · NCDOT · C205092 · $260.00 per LF · qty 763.0 · bid tab
|
| water main 6-inch | LF | 1 | $115.00 | $115.00 to $115.00 | Bids- 2025-10-21 · NCDOT · C205092 · $115.00 per LF · qty 274.0 · bid tab
|
| water main 8-inch | LF | 1 | $110.00 | $110.00 to $110.00 | Bids- 2025-10-21 · NCDOT · C205092 · $110.00 per LF · qty 2192.0 · bid tab
|
| water service | LF | 2 | $66.25 | $37.50 to $95.00 | Bids- 2025-10-21 · NCDOT · C205092 · $95.00 per LF · qty 384.0 · bid tab
- 2025-10-21 · NCDOT · C205092 · $37.50 per LF · qty 2820.0 · bid tab
|