Site-work prices, Pitt County, NC

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON1$575.00$575.00 to $575.00
Bids
  • 2025-10-21 · NCDOT · C205092 · $575.00 per TON · qty 3870.0 · bid tab
curb gutterLF4$26.00$22.00 to $35.00
Bids
  • 2025-10-21 · NCDOT · C205092 · $28.00 per LF · qty 2600.0 · bid tab
  • 2025-10-21 · NCDOT · C205092 · $35.00 per LF · qty 60.0 · bid tab
  • 2025-10-21 · NCDOT · C205092 · $22.00 per LF · qty 8700.0 · bid tab
  • 2025-10-21 · NCDOT · C205092 · $24.00 per LF · qty 29800.0 · bid tab
excavation embankmentCY2$17.25$12.50 to $22.00
Bids
  • 2025-10-21 · NCDOT · C205092 · $12.50 per CY · qty 38000.0 · bid tab
  • 2025-10-21 · NCDOT · C205092 · $22.00 per CY · qty 48000.0 · bid tab
fire hydrantEA1$11,000.00$11,000.00 to $11,000.00
Bids
  • 2025-10-21 · NCDOT · C205092 · $11,000.00 per EA · qty 31.0 · bid tab
fire hydrantLF1$85.00$85.00 to $85.00
Bids
  • 2025-10-21 · NCDOT · C205092 · $85.00 per LF · qty 152.0 · bid tab
flexible baseTON1$55.00$55.00 to $55.00
Bids
  • 2025-10-21 · NCDOT · C205092 · $55.00 per TON · qty 100.0 · bid tab
inlet headwallEA1$1,100.00$1,100.00 to $1,100.00
Bids
  • 2025-10-21 · NCDOT · C205092 · $1,100.00 per EA · qty 75.0 · bid tab
lime cement stabilizationEA1$1,600.00$1,600.00 to $1,600.00
Bids
  • 2025-10-21 · NCDOT · C205092 · $1,600.00 per EA · qty 20.0 · bid tab
lime cement stabilizationSY2$3.00$2.75 to $3.25
Bids
  • 2025-10-21 · NCDOT · C205092 · $3.25 per SY · qty 3700.0 · bid tab
  • 2025-10-21 · NCDOT · C205092 · $2.75 per SY · qty 61170.0 · bid tab
lime cement stabilizationTON2$34.12$27.25 to $41.00
Bids
  • 2025-10-21 · NCDOT · C205092 · $27.25 per TON · qty 39750.0 · bid tab
  • 2025-10-21 · NCDOT · C205092 · $41.00 per TON · qty 500.0 · bid tab
manholeEA5$2,500.00$768.00 to $16,000.00
Bids
  • 2025-10-21 · NCDOT · C205092 · $2,500.00 per EA · qty 1.0 · bid tab
  • 2025-10-21 · NCDOT · C205092 · $1,453.00 per EA · qty 19.0 · bid tab
  • 2025-10-21 · NCDOT · C205092 · $768.00 per EA · qty 18.0 · bid tab
  • 2025-10-21 · NCDOT · C205092 · $4,209.00 per EA · qty 2.0 · bid tab
  • 2025-10-21 · NCDOT · C205092 · $16,000.00 per EA · qty 4.0 · bid tab
sewer main 12-inchLF1$130.00$130.00 to $130.00
Bids
  • 2025-10-21 · NCDOT · C205092 · $130.00 per LF · qty 162.0 · bid tab
sewer main 14-inchLF1$195.00$195.00 to $195.00
Bids
  • 2025-10-21 · NCDOT · C205092 · $195.00 per LF · qty 177.0 · bid tab
sidewalkEA1$1,950.00$1,950.00 to $1,950.00
Bids
  • 2025-10-21 · NCDOT · C205092 · $1,950.00 per EA · qty 52.0 · bid tab
sidewalkSY2$56.00$37.00 to $75.00
Bids
  • 2025-10-21 · NCDOT · C205092 · $75.00 per SY · qty 1500.0 · bid tab
  • 2025-10-21 · NCDOT · C205092 · $37.00 per SY · qty 14300.0 · bid tab
storm pipe 15-inchLF3$102.15$85.90 to $105.50
Bids
  • 2025-10-21 · NCDOT · C205092 · $85.90 per LF · qty 2024.0 · bid tab
  • 2025-10-21 · NCDOT · C205092 · $105.50 per LF · qty 2104.0 · bid tab
  • 2025-10-21 · NCDOT · C205092 · $102.15 per LF · qty 6996.0 · bid tab
storm pipe 18-inchLF3$141.80$133.60 to $142.10
Bids
  • 2025-10-21 · NCDOT · C205092 · $142.10 per LF · qty 860.0 · bid tab
  • 2025-10-21 · NCDOT · C205092 · $133.60 per LF · qty 576.0 · bid tab
  • 2025-10-21 · NCDOT · C205092 · $141.80 per LF · qty 5198.0 · bid tab
storm pipe 24-inchLF3$155.75$123.50 to $182.60
Bids
  • 2025-10-21 · NCDOT · C205092 · $155.75 per LF · qty 1488.0 · bid tab
  • 2025-10-21 · NCDOT · C205092 · $123.50 per LF · qty 1476.0 · bid tab
  • 2025-10-21 · NCDOT · C205092 · $182.60 per LF · qty 380.0 · bid tab
storm pipe 30-inchLF2$200.55$171.10 to $230.00
Bids
  • 2025-10-21 · NCDOT · C205092 · $230.00 per LF · qty 96.0 · bid tab
  • 2025-10-21 · NCDOT · C205092 · $171.10 per LF · qty 496.0 · bid tab
storm pipe 36-inchLF3$265.00$265.00 to $292.00
Bids
  • 2025-10-21 · NCDOT · C205092 · $265.00 per LF · qty 160.0 · bid tab
  • 2025-10-21 · NCDOT · C205092 · $292.00 per LF · qty 168.0 · bid tab
  • 2025-10-21 · NCDOT · C205092 · $265.00 per LF · qty 104.0 · bid tab
storm pipe 42-inchLF2$370.75$336.50 to $405.00
Bids
  • 2025-10-21 · NCDOT · C205092 · $336.50 per LF · qty 180.0 · bid tab
  • 2025-10-21 · NCDOT · C205092 · $405.00 per LF · qty 180.0 · bid tab
storm pipe 48-inchLF1$785.00$785.00 to $785.00
Bids
  • 2025-10-21 · NCDOT · C205092 · $785.00 per LF · qty 686.0 · bid tab
storm pipe 60-inchLF1$755.00$755.00 to $755.00
Bids
  • 2025-10-21 · NCDOT · C205092 · $755.00 per LF · qty 92.0 · bid tab
water main 10-inchLF1$350.00$350.00 to $350.00
Bids
  • 2025-10-21 · NCDOT · C205092 · $350.00 per LF · qty 13.0 · bid tab
water main 12-inchLF1$285.00$285.00 to $285.00
Bids
  • 2025-10-21 · NCDOT · C205092 · $285.00 per LF · qty 89.0 · bid tab
water main 24-inchLF1$380.00$380.00 to $380.00
Bids
  • 2025-10-21 · NCDOT · C205092 · $380.00 per LF · qty 11666.0 · bid tab
water main 30-inchLF1$260.00$260.00 to $260.00
Bids
  • 2025-10-21 · NCDOT · C205092 · $260.00 per LF · qty 763.0 · bid tab
water main 6-inchLF1$115.00$115.00 to $115.00
Bids
  • 2025-10-21 · NCDOT · C205092 · $115.00 per LF · qty 274.0 · bid tab
water main 8-inchLF1$110.00$110.00 to $110.00
Bids
  • 2025-10-21 · NCDOT · C205092 · $110.00 per LF · qty 2192.0 · bid tab
water serviceLF2$66.25$37.50 to $95.00
Bids
  • 2025-10-21 · NCDOT · C205092 · $95.00 per LF · qty 384.0 · bid tab
  • 2025-10-21 · NCDOT · C205092 · $37.50 per LF · qty 2820.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.