PadstakeGet the fee reports
Menu

Site-work prices, Moore County, NC

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON4$527.50$415.00 to $650.00
Bids
  • 2025-11-18 · NCDOT · C205155 · $580.00 per TON · qty 1943.0 · bid tab
  • 2025-09-16 · NCDOT · C205042 · $650.00 per TON · qty 285.0 · bid tab
  • 2024-11-19 · NCDOT · C204949 · $475.00 per TON · qty 7045.0 · bid tab
  • 2024-11-19 · NCDOT · C204997 · $415.00 per TON · qty 2579.0 · bid tab
curb gutterLF6$35.50$31.00 to $65.00
Bids
  • 2025-09-16 · NCDOT · C205042 · $65.00 per LF · qty 5210.0 · bid tab
  • 2024-11-19 · NCDOT · C204949 · $39.00 per LF · qty 1730.0 · bid tab
  • 2024-11-19 · NCDOT · C204949 · $31.00 per LF · qty 2180.0 · bid tab
  • 2024-11-19 · NCDOT · C204949 · $53.00 per LF · qty 120.0 · bid tab
  • 2024-11-19 · NCDOT · C204949 · $32.00 per LF · qty 15800.0 · bid tab
  • 2024-11-19 · NCDOT · C204949 · $31.20 per LF · qty 15650.0 · bid tab
excavation embankmentCY2$4.38$1.00 to $7.75
Bids
  • 2024-11-19 · NCDOT · C204949 · $7.75 per CY · qty 91000.0 · bid tab
  • 2024-11-19 · NCDOT · C204949 · $1.00 per CY · qty 174000.0 · bid tab
fire hydrantEA1$8,000.00$8,000.00 to $8,000.00
Bids
  • 2025-09-16 · NCDOT · C205042 · $8,000.00 per EA · qty 1.0 · bid tab
fire hydrantLF2$70.00$65.00 to $75.00
Bids
  • 2025-09-16 · NCDOT · C205042 · $75.00 per LF · qty 10.0 · bid tab
  • 2024-11-19 · NCDOT · C204949 · $65.00 per LF · qty 587.0 · bid tab
flexible baseTON1$40.00$40.00 to $40.00
Bids
  • 2024-11-19 · NCDOT · C204949 · $40.00 per TON · qty 4900.0 · bid tab
lime cement stabilizationSY3$4.75$3.25 to $6.00
Bids
  • 2025-09-16 · NCDOT · C205042 · $6.00 per SY · qty 200.0 · bid tab
  • 2024-11-19 · NCDOT · C204949 · $3.25 per SY · qty 3750.0 · bid tab
  • 2024-11-19 · NCDOT · C204949 · $4.75 per SY · qty 900.0 · bid tab
lime cement stabilizationTON1$35.00$35.00 to $35.00
Bids
  • 2024-11-19 · NCDOT · C204949 · $35.00 per TON · qty 590.0 · bid tab
manholeEA5$900.00$650.00 to $10,600.00
Bids
  • 2025-11-18 · NCDOT · C205155 · $700.00 per EA · qty 37.0 · bid tab
  • 2025-09-16 · NCDOT · C205042 · $900.00 per EA · qty 5.0 · bid tab
  • 2025-09-16 · NCDOT · C205042 · $930.00 per EA · qty 12.0 · bid tab
  • 2025-09-16 · NCDOT · C205042 · $10,600.00 per EA · qty 10.0 · bid tab
  • 2024-11-19 · NCDOT · C204949 · $650.00 per EA · qty 52.0 · bid tab
sewer main 12-inchLF2$166.00$117.00 to $215.00
Bids
  • 2025-09-16 · NCDOT · C205042 · $215.00 per LF · qty 100.0 · bid tab
  • 2025-09-16 · NCDOT · C205042 · $117.00 per LF · qty 1843.0 · bid tab
sewer serviceLF1$240.00$240.00 to $240.00
Bids
  • 2025-09-16 · NCDOT · C205042 · $240.00 per LF · qty 340.0 · bid tab
sidewalkEA1$4,500.00$4,500.00 to $4,500.00
Bids
  • 2025-09-16 · NCDOT · C205042 · $4,500.00 per EA · qty 32.0 · bid tab
sidewalkSY3$126.50$84.00 to $130.00
Bids
  • 2025-09-16 · NCDOT · C205042 · $84.00 per SY · qty 1660.0 · bid tab
  • 2025-09-16 · NCDOT · C205042 · $130.00 per SY · qty 400.0 · bid tab
  • 2024-11-19 · NCDOT · C204949 · $126.50 per SY · qty 720.0 · bid tab
storm pipe 15-inchLF3$80.00$70.00 to $93.00
Bids
  • 2025-09-16 · NCDOT · C205042 · $93.00 per LF · qty 1360.0 · bid tab
  • 2024-11-19 · NCDOT · C204949 · $80.00 per LF · qty 5096.0 · bid tab
  • 2024-11-19 · NCDOT · C204949 · $70.00 per LF · qty 684.0 · bid tab
storm pipe 18-inchLF3$95.00$75.00 to $130.00
Bids
  • 2025-09-16 · NCDOT · C205042 · $130.00 per LF · qty 516.0 · bid tab
  • 2024-11-19 · NCDOT · C204949 · $95.00 per LF · qty 8044.0 · bid tab
  • 2024-11-19 · NCDOT · C204949 · $75.00 per LF · qty 3764.0 · bid tab
storm pipe 24-inchLF2$119.00$110.00 to $128.00
Bids
  • 2024-11-19 · NCDOT · C204949 · $128.00 per LF · qty 944.0 · bid tab
  • 2024-11-19 · NCDOT · C204949 · $110.00 per LF · qty 2496.0 · bid tab
storm pipe 30-inchLF3$165.00$144.00 to $179.00
Bids
  • 2024-11-19 · NCDOT · C204949 · $165.00 per LF · qty 336.0 · bid tab
  • 2024-11-19 · NCDOT · C204949 · $144.00 per LF · qty 1228.0 · bid tab
  • 2024-11-19 · NCDOT · C204949 · $179.00 per LF · qty 176.0 · bid tab
storm pipe 36-inchLF2$191.50$173.00 to $210.00
Bids
  • 2024-11-19 · NCDOT · C204949 · $210.00 per LF · qty 120.0 · bid tab
  • 2024-11-19 · NCDOT · C204949 · $173.00 per LF · qty 284.0 · bid tab
storm pipe 54-inchLF1$536.00$536.00 to $536.00
Bids
  • 2024-11-19 · NCDOT · C204949 · $536.00 per LF · qty 192.0 · bid tab
water main 10-inchLF1$25.00$25.00 to $25.00
Bids
  • 2024-11-19 · NCDOT · C204949 · $25.00 per LF · qty 534.0 · bid tab
water main 12-inchLF1$142.00$142.00 to $142.00
Bids
  • 2024-11-19 · NCDOT · C204949 · $142.00 per LF · qty 543.0 · bid tab
water main 2-inchLF2$54.00$43.00 to $65.00
Bids
  • 2025-09-16 · NCDOT · C205042 · $65.00 per LF · qty 172.0 · bid tab
  • 2024-11-19 · NCDOT · C204949 · $43.00 per LF · qty 444.0 · bid tab
water main 3-inchLF1$85.00$85.00 to $85.00
Bids
  • 2025-09-16 · NCDOT · C205042 · $85.00 per LF · qty 128.0 · bid tab
water main 6-inchLF2$75.50$66.00 to $85.00
Bids
  • 2025-09-16 · NCDOT · C205042 · $85.00 per LF · qty 2313.0 · bid tab
  • 2024-11-19 · NCDOT · C204949 · $66.00 per LF · qty 585.0 · bid tab
water main 8-inchLF1$50.00$50.00 to $50.00
Bids
  • 2024-11-19 · NCDOT · C204949 · $50.00 per LF · qty 11931.0 · bid tab
water serviceLF3$85.00$41.00 to $300.00
Bids
  • 2025-09-16 · NCDOT · C205042 · $300.00 per LF · qty 12.0 · bid tab
  • 2025-09-16 · NCDOT · C205042 · $85.00 per LF · qty 259.0 · bid tab
  • 2024-11-19 · NCDOT · C204949 · $41.00 per LF · qty 1712.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.