| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 6 | $767.50 | $615.00 to $782.04 | Bids- 2026-04-21 · NCDOT · C205180 · $700.00 per TON · qty 255.0 · bid tab
- 2025-11-18 · NCDOT · C205146 · $775.00 per TON · qty 3297.0 · bid tab
- 2025-08-19 · NCDOT · C205121 · $775.00 per TON · qty 300.0 · bid tab
- 2025-06-25 · NCDOT · C205078 · $782.04 per TON · qty 190.0 · bid tab
- 2025-01-21 · NCDOT · C205017 · $760.00 per TON · qty 335.0 · bid tab
- 2024-08-20 · NCDOT · C204937 · $615.00 per TON · qty 1755.0 · bid tab
|
| curb gutter | LF | 3 | $41.00 | $33.00 to $59.00 | Bids- 2024-08-20 · NCDOT · C204937 · $41.00 per LF · qty 15170.0 · bid tab
- 2024-08-20 · NCDOT · C204937 · $59.00 per LF · qty 50.0 · bid tab
- 2024-08-20 · NCDOT · C204937 · $33.00 per LF · qty 10180.0 · bid tab
|
| excavation embankment | CY | 2 | $141.76 | $53.53 to $230.00 | Bids- 2025-06-25 · NCDOT · C205078 · $53.53 per CY · qty 4900.0 · bid tab
- 2025-01-21 · NCDOT · C205017 · $230.00 per CY · qty 250.0 · bid tab
|
| fire hydrant | EA | 1 | $7,000.00 | $7,000.00 to $7,000.00 | Bids- 2024-08-20 · NCDOT · C204937 · $7,000.00 per EA · qty 3.0 · bid tab
|
| fire hydrant | LF | 1 | $170.00 | $170.00 to $170.00 | Bids- 2024-08-20 · NCDOT · C204937 · $170.00 per LF · qty 63.0 · bid tab
|
| flexible base | TON | 5 | $60.00 | $30.00 to $107.89 | Bids- 2026-04-21 · NCDOT · C205180 · $107.89 per TON · qty 420.0 · bid tab
- 2025-08-19 · NCDOT · C205121 · $60.00 per TON · qty 4700.0 · bid tab
- 2025-06-25 · NCDOT · C205078 · $57.96 per TON · qty 2265.0 · bid tab
- 2025-01-21 · NCDOT · C205017 · $90.00 per TON · qty 1135.0 · bid tab
- 2024-08-20 · NCDOT · C204937 · $30.00 per TON · qty 10400.0 · bid tab
|
| inlet headwall | EA | 1 | $1,700.00 | $1,700.00 to $1,700.00 | Bids- 2024-08-20 · NCDOT · C204937 · $1,700.00 per EA · qty 19.0 · bid tab
|
| lime cement stabilization | SY | 8 | $5.55 | $3.00 to $16.00 | Bids- 2026-04-21 · NCDOT · C205180 · $5.93 per SY · qty 3299.8 · bid tab
- 2026-04-21 · NCDOT · C205180 · $4.08 per SY · qty 2100.0 · bid tab
- 2025-08-19 · NCDOT · C205121 · $16.00 per SY · qty 1800.0 · bid tab
- 2025-08-19 · NCDOT · C205121 · $16.00 per SY · qty 2400.0 · bid tab
- 2025-06-25 · NCDOT · C205078 · $5.18 per SY · qty 350.0 · bid tab
- 2025-01-21 · NCDOT · C205017 · $10.00 per SY · qty 7495.0 · bid tab
- 2024-08-20 · NCDOT · C204937 · $3.00 per SY · qty 1700.0 · bid tab
- 2024-08-20 · NCDOT · C204937 · $3.00 per SY · qty 1000.0 · bid tab
|
| lime cement stabilization | TON | 5 | $60.00 | $28.00 to $120.00 | Bids- 2026-04-21 · NCDOT · C205180 · $85.55 per TON · qty 1400.0 · bid tab
- 2025-08-19 · NCDOT · C205121 · $60.00 per TON · qty 1200.0 · bid tab
- 2025-06-25 · NCDOT · C205078 · $50.46 per TON · qty 200.0 · bid tab
- 2025-01-21 · NCDOT · C205017 · $120.00 per TON · qty 40.0 · bid tab
- 2024-08-20 · NCDOT · C204937 · $28.00 per TON · qty 1500.0 · bid tab
|
| manhole | EA | 4 | $1,750.00 | $500.00 to $9,900.00 | Bids- 2025-11-18 · NCDOT · C205146 · $1,500.00 per EA · qty 29.0 · bid tab
- 2024-08-20 · NCDOT · C204937 · $9,900.00 per EA · qty 23.0 · bid tab
- 2024-08-20 · NCDOT · C204937 · $2,000.00 per EA · qty 1.0 · bid tab
- 2024-08-20 · NCDOT · C204937 · $500.00 per EA · qty 9.0 · bid tab
|
| sewer main 8-inch | LF | 1 | $124.00 | $124.00 to $124.00 | Bids- 2024-08-20 · NCDOT · C204937 · $124.00 per LF · qty 3177.0 · bid tab
|
| sewer service | LF | 2 | $116.50 | $83.00 to $150.00 | Bids- 2026-04-21 · NCDOT · C205180 · $150.00 per LF · qty 31.0 · bid tab
- 2024-08-20 · NCDOT · C204937 · $83.00 per LF · qty 448.0 · bid tab
|
| sidewalk | EA | 2 | $5,112.50 | $3,300.00 to $6,925.00 | Bids- 2025-11-18 · NCDOT · C205146 · $6,925.00 per EA · qty 8.0 · bid tab
- 2024-08-20 · NCDOT · C204937 · $3,300.00 per EA · qty 98.0 · bid tab
|
| sidewalk | SY | 2 | $96.00 | $64.00 to $128.00 | Bids- 2024-08-20 · NCDOT · C204937 · $128.00 per SY · qty 680.0 · bid tab
- 2024-08-20 · NCDOT · C204937 · $64.00 per SY · qty 7150.0 · bid tab
|
| storm pipe 15-inch | LF | 5 | $162.00 | $106.00 to $270.23 | Bids- 2026-04-21 · NCDOT · C205180 · $270.23 per LF · qty 132.0 · bid tab
- 2026-04-21 · NCDOT · C205180 · $194.15 per LF · qty 808.0 · bid tab
- 2025-08-19 · NCDOT · C205121 · $162.00 per LF · qty 68.0 · bid tab
- 2024-08-20 · NCDOT · C204937 · $113.00 per LF · qty 1008.0 · bid tab
- 2024-08-20 · NCDOT · C204937 · $106.00 per LF · qty 5196.0 · bid tab
|
| storm pipe 18-inch | LF | 4 | $190.00 | $115.00 to $319.37 | Bids- 2026-04-21 · NCDOT · C205180 · $319.37 per LF · qty 44.0 · bid tab
- 2026-04-21 · NCDOT · C205180 · $255.99 per LF · qty 260.0 · bid tab
- 2024-08-20 · NCDOT · C204937 · $115.00 per LF · qty 524.0 · bid tab
- 2024-08-20 · NCDOT · C204937 · $124.00 per LF · qty 624.0 · bid tab
|
| storm pipe 24-inch | LF | 2 | $144.50 | $135.00 to $154.00 | Bids- 2024-08-20 · NCDOT · C204937 · $135.00 per LF · qty 324.0 · bid tab
- 2024-08-20 · NCDOT · C204937 · $154.00 per LF · qty 56.0 · bid tab
|
| storm pipe 30-inch | LF | 2 | $176.50 | $165.00 to $188.00 | Bids- 2024-08-20 · NCDOT · C204937 · $188.00 per LF · qty 228.0 · bid tab
- 2024-08-20 · NCDOT · C204937 · $165.00 per LF · qty 324.0 · bid tab
|
| storm pipe 36-inch | LF | 4 | $377.59 | $201.00 to $454.48 | Bids- 2026-04-21 · NCDOT · C205180 · $454.48 per LF · qty 84.0 · bid tab
- 2025-08-19 · NCDOT · C205121 · $314.00 per LF · qty 76.0 · bid tab
- 2025-06-25 · NCDOT · C205078 · $441.18 per LF · qty 52.0 · bid tab
- 2024-08-20 · NCDOT · C204937 · $201.00 per LF · qty 112.0 · bid tab
|
| storm pipe 48-inch | LF | 1 | $2,108.51 | $2,108.51 to $2,108.51 | Bids- 2026-04-21 · NCDOT · C205180 · $2,108.51 per LF · qty 4.0 · bid tab
|
| storm pipe 54-inch | LF | 1 | $800.00 | $800.00 to $800.00 | Bids- 2024-08-20 · NCDOT · C204937 · $800.00 per LF · qty 305.0 · bid tab
|
| water main 12-inch | LF | 1 | $190.00 | $190.00 to $190.00 | Bids- 2024-08-20 · NCDOT · C204937 · $190.00 per LF · qty 620.0 · bid tab
|
| water main 20-inch | LF | 1 | $500.00 | $500.00 to $500.00 | Bids- 2024-08-20 · NCDOT · C204937 · $500.00 per LF · qty 48.0 · bid tab
|
| water main 2-inch | LF | 1 | $93.00 | $93.00 to $93.00 | Bids- 2024-08-20 · NCDOT · C204937 · $93.00 per LF · qty 63.0 · bid tab
|
| water main 30-inch | LF | 1 | $700.00 | $700.00 to $700.00 | Bids- 2024-08-20 · NCDOT · C204937 · $700.00 per LF · qty 1178.0 · bid tab
|
| water main 6-inch | LF | 1 | $110.00 | $110.00 to $110.00 | Bids- 2024-08-20 · NCDOT · C204937 · $110.00 per LF · qty 1727.0 · bid tab
|
| water main 8-inch | LF | 1 | $150.00 | $150.00 to $150.00 | Bids- 2024-08-20 · NCDOT · C204937 · $150.00 per LF · qty 6130.0 · bid tab
|
| water service | LF | 2 | $39.00 | $38.00 to $40.00 | Bids- 2024-08-20 · NCDOT · C204937 · $40.00 per LF · qty 15.0 · bid tab
- 2024-08-20 · NCDOT · C204937 · $38.00 per LF · qty 1247.0 · bid tab
|