Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementSF1$120.00$120.00 to $120.00
Bids
  • 2024-04-16 · NCDOT · C204921 · $120.00 per SF · qty 449.9 · bid tab
asphalt pavementTON7$720.00$600.00 to $1,000.00
Bids
  • 2026-08-18 · NCDOT · C205202 · $790.00 per TON · qty 140.0 · bid tab
  • 2025-09-16 · NCDOT · C204971 · $600.00 per TON · qty 6825.0 · bid tab
  • 2025-06-17 · NCDOT · C204798 · $718.00 per TON · qty 1670.0 · bid tab
  • 2025-04-15 · NCDOT · C205061 · $720.00 per TON · qty 95.0 · bid tab
  • 2024-12-17 · NCDOT · C204821 · $670.00 per TON · qty 1515.0 · bid tab
  • 2024-05-28 · NCDOT · C204908 · $950.00 per TON · qty 230.0 · bid tab
  • 2024-04-16 · NCDOT · C204921 · $1,000.00 per TON · qty 10.0 · bid tab
curb gutterLF9$30.00$25.80 to $47.35
Bids
  • 2025-09-16 · NCDOT · C204971 · $34.00 per LF · qty 8700.0 · bid tab
  • 2025-09-16 · NCDOT · C204971 · $30.00 per LF · qty 55000.0 · bid tab
  • 2025-09-16 · NCDOT · C204971 · $28.00 per LF · qty 16800.0 · bid tab
  • 2025-06-17 · NCDOT · C204798 · $28.50 per LF · qty 300.0 · bid tab
  • 2025-06-17 · NCDOT · C204798 · $28.50 per LF · qty 13400.0 · bid tab
  • 2025-06-17 · NCDOT · C204798 · $25.80 per LF · qty 1600.0 · bid tab
  • 2024-12-17 · NCDOT · C204821 · $30.00 per LF · qty 11470.0 · bid tab
  • 2024-05-28 · NCDOT · C204908 · $47.35 per LF · qty 80.0 · bid tab
  • 2024-05-28 · NCDOT · C204908 · $30.80 per LF · qty 2760.0 · bid tab
excavation embankmentCY4$16.00$12.00 to $24.00
Bids
  • 2026-08-18 · NCDOT · C205202 · $24.00 per CY · qty 13310.0 · bid tab
  • 2025-09-16 · NCDOT · C204971 · $18.00 per CY · qty 146900.0 · bid tab
  • 2025-09-16 · NCDOT · C204971 · $12.00 per CY · qty 83700.0 · bid tab
  • 2025-06-17 · NCDOT · C204798 · $14.00 per CY · qty 58300.0 · bid tab
fire hydrantEA4$9,641.76$6,825.00 to $13,200.00
Bids
  • 2025-09-16 · NCDOT · C204971 · $6,825.00 per EA · qty 4.0 · bid tab
  • 2025-06-17 · NCDOT · C204798 · $10,500.00 per EA · qty 5.0 · bid tab
  • 2024-12-17 · NCDOT · C204821 · $13,200.00 per EA · qty 2.0 · bid tab
  • 2024-05-28 · NCDOT · C204908 · $8,783.52 per EA · qty 4.0 · bid tab
fire hydrantLF6$147.50$100.00 to $565.00
Bids
  • 2026-08-18 · NCDOT · C205202 · $120.00 per LF · qty 63.0 · bid tab
  • 2025-09-16 · NCDOT · C204971 · $155.00 per LF · qty 1106.0 · bid tab
  • 2025-06-17 · NCDOT · C204798 · $140.00 per LF · qty 138.0 · bid tab
  • 2025-04-15 · NCDOT · C205061 · $565.00 per LF · qty 5.0 · bid tab
  • 2024-12-17 · NCDOT · C204821 · $100.00 per LF · qty 195.0 · bid tab
  • 2024-05-28 · NCDOT · C204908 · $192.92 per LF · qty 93.6 · bid tab
flexible baseTON3$55.00$45.00 to $65.00
Bids
  • 2025-09-16 · NCDOT · C204971 · $65.00 per TON · qty 6140.0 · bid tab
  • 2025-06-17 · NCDOT · C204798 · $55.00 per TON · qty 191.0 · bid tab
  • 2024-12-17 · NCDOT · C204821 · $45.00 per TON · qty 530.0 · bid tab
inlet headwallEA4$1,650.00$960.00 to $2,800.00
Bids
  • 2026-08-18 · NCDOT · C205202 · $2,200.00 per EA · qty 1.0 · bid tab
  • 2025-09-16 · NCDOT · C204971 · $960.00 per EA · qty 121.0 · bid tab
  • 2025-06-17 · NCDOT · C204798 · $1,100.00 per EA · qty 5.0 · bid tab
  • 2024-12-17 · NCDOT · C204821 · $2,800.00 per EA · qty 2.0 · bid tab
lime cement stabilizationSY13$4.00$3.50 to $6.15
Bids
  • 2026-08-18 · NCDOT · C205202 · $5.00 per SY · qty 1145.0 · bid tab
  • 2025-09-16 · NCDOT · C204971 · $5.00 per SY · qty 11250.0 · bid tab
  • 2025-09-16 · NCDOT · C204971 · $4.00 per SY · qty 62114.0 · bid tab
  • 2025-09-16 · NCDOT · C204971 · $5.00 per SY · qty 1050.0 · bid tab
  • 2025-09-16 · NCDOT · C204971 · $6.15 per SY · qty 77620.0 · bid tab
  • 2025-06-17 · NCDOT · C204798 · $3.50 per SY · qty 10200.0 · bid tab
  • 2025-06-17 · NCDOT · C204798 · $3.75 per SY · qty 2500.0 · bid tab
  • 2025-04-15 · NCDOT · C205061 · $3.80 per SY · qty 300.0 · bid tab
  • 2025-04-15 · NCDOT · C205061 · $3.80 per SY · qty 200.0 · bid tab
  • 2024-12-17 · NCDOT · C204821 · $3.50 per SY · qty 3800.0 · bid tab
(10 most recent of 13 shown; all in the Hubstake feed)
lime cement stabilizationTON7$45.00$41.00 to $379.50
Bids
  • 2025-09-16 · NCDOT · C204971 · $44.26 per TON · qty 27727.0 · bid tab
  • 2025-09-16 · NCDOT · C204971 · $379.50 per TON · qty 940.0 · bid tab
  • 2025-09-16 · NCDOT · C204971 · $60.00 per TON · qty 500.0 · bid tab
  • 2025-06-17 · NCDOT · C204798 · $45.00 per TON · qty 1675.0 · bid tab
  • 2025-04-15 · NCDOT · C205061 · $43.50 per TON · qty 200.0 · bid tab
  • 2024-12-17 · NCDOT · C204821 · $41.00 per TON · qty 6600.0 · bid tab
  • 2024-05-28 · NCDOT · C204908 · $47.75 per TON · qty 600.0 · bid tab
manholeEA23$3,111.00$675.00 to $19,500.00
Bids
  • 2026-08-18 · NCDOT · C205202 · $4,700.00 per EA · qty 4.0 · bid tab
  • 2026-08-18 · NCDOT · C205202 · $2,300.00 per EA · qty 4.0 · bid tab
  • 2026-08-18 · NCDOT · C205202 · $4,200.00 per EA · qty 12.0 · bid tab
  • 2025-09-16 · NCDOT · C204971 · $1,561.00 per EA · qty 11.0 · bid tab
  • 2025-09-16 · NCDOT · C204971 · $826.00 per EA · qty 91.0 · bid tab
  • 2025-09-16 · NCDOT · C204971 · $5,200.00 per EA · qty 3.0 · bid tab
  • 2025-09-16 · NCDOT · C204971 · $9,250.00 per EA · qty 1.0 · bid tab
  • 2025-09-16 · NCDOT · C204971 · $3,500.00 per EA · qty 3.0 · bid tab
  • 2025-06-17 · NCDOT · C204798 · $839.00 per EA · qty 26.0 · bid tab
  • 2025-06-17 · NCDOT · C204798 · $3,600.00 per EA · qty 12.0 · bid tab
(10 most recent of 23 shown; all in the Hubstake feed)
manholeLS2$46,254.00$16,594.00 to $75,914.00
Bids
  • 2025-04-15 · NCDOT · C205061 · $75,914.00 per LS · qty 1.0 · bid tab
  • 2025-04-15 · NCDOT · C205061 · $16,594.00 per LS · qty 1.0 · bid tab
sewer main 12-inchLF1$160.00$160.00 to $160.00
Bids
  • 2025-06-17 · NCDOT · C204798 · $160.00 per LF · qty 328.0 · bid tab
sewer main 20-inchLF1$455.00$455.00 to $455.00
Bids
  • 2026-08-18 · NCDOT · C205202 · $455.00 per LF · qty 113.0 · bid tab
sewer main 8-inchLF3$165.00$125.00 to $311.00
Bids
  • 2026-08-18 · NCDOT · C205202 · $165.00 per LF · qty 939.0 · bid tab
  • 2025-06-17 · NCDOT · C204798 · $125.00 per LF · qty 2358.0 · bid tab
  • 2024-12-17 · NCDOT · C204821 · $311.00 per LF · qty 1201.0 · bid tab
sewer serviceLF4$85.00$45.00 to $220.00
Bids
  • 2026-08-18 · NCDOT · C205202 · $95.00 per LF · qty 108.0 · bid tab
  • 2025-09-16 · NCDOT · C204971 · $220.00 per LF · qty 25.0 · bid tab
  • 2025-06-17 · NCDOT · C204798 · $45.00 per LF · qty 648.0 · bid tab
  • 2024-12-17 · NCDOT · C204821 · $75.00 per LF · qty 160.0 · bid tab
sidewalkEA4$2,975.00$2,650.00 to $4,085.26
Bids
  • 2025-09-16 · NCDOT · C204971 · $2,950.00 per EA · qty 79.0 · bid tab
  • 2025-06-17 · NCDOT · C204798 · $2,650.00 per EA · qty 50.0 · bid tab
  • 2024-12-17 · NCDOT · C204821 · $3,000.00 per EA · qty 17.0 · bid tab
  • 2024-05-28 · NCDOT · C204908 · $4,085.26 per EA · qty 13.0 · bid tab
sidewalkSY10$92.05$49.00 to $165.32
Bids
  • 2026-08-18 · NCDOT · C205202 · $125.00 per SY · qty 30.0 · bid tab
  • 2025-09-16 · NCDOT · C204971 · $49.00 per SY · qty 14100.0 · bid tab
  • 2025-09-16 · NCDOT · C204971 · $97.00 per SY · qty 200.0 · bid tab
  • 2025-06-17 · NCDOT · C204798 · $86.85 per SY · qty 440.0 · bid tab
  • 2025-06-17 · NCDOT · C204798 · $55.65 per SY · qty 4380.0 · bid tab
  • 2024-12-17 · NCDOT · C204821 · $120.00 per SY · qty 160.0 · bid tab
  • 2024-12-17 · NCDOT · C204821 · $66.00 per SY · qty 3360.0 · bid tab
  • 2024-05-28 · NCDOT · C204908 · $165.32 per SY · qty 230.0 · bid tab
  • 2024-05-28 · NCDOT · C204908 · $128.45 per SY · qty 690.0 · bid tab
  • 2024-05-28 · NCDOT · C204908 · $87.09 per SY · qty 1140.0 · bid tab
storm pipe 12-inchLF2$107.15$100.00 to $114.29
Bids
  • 2025-09-16 · NCDOT · C204971 · $100.00 per LF · qty 60.0 · bid tab
  • 2024-05-28 · NCDOT · C204908 · $114.29 per LF · qty 88.0 · bid tab
storm pipe 15-inchLF7$104.00$90.00 to $119.78
Bids
  • 2026-08-18 · NCDOT · C205202 · $110.00 per LF · qty 28.0 · bid tab
  • 2025-09-16 · NCDOT · C204971 · $90.00 per LF · qty 15020.0 · bid tab
  • 2025-06-17 · NCDOT · C204798 · $105.00 per LF · qty 168.0 · bid tab
  • 2025-06-17 · NCDOT · C204798 · $95.00 per LF · qty 3708.0 · bid tab
  • 2025-04-15 · NCDOT · C205061 · $104.00 per LF · qty 80.0 · bid tab
  • 2024-12-17 · NCDOT · C204821 · $103.20 per LF · qty 4868.0 · bid tab
  • 2024-05-28 · NCDOT · C204908 · $119.78 per LF · qty 560.0 · bid tab
storm pipe 18-inchLF6$113.50$102.71 to $150.50
Bids
  • 2025-09-16 · NCDOT · C204971 · $110.00 per LF · qty 13876.0 · bid tab
  • 2025-09-16 · NCDOT · C204971 · $130.00 per LF · qty 204.0 · bid tab
  • 2025-06-17 · NCDOT · C204798 · $110.00 per LF · qty 628.0 · bid tab
  • 2025-04-15 · NCDOT · C205061 · $117.00 per LF · qty 52.0 · bid tab
  • 2024-12-17 · NCDOT · C204821 · $150.50 per LF · qty 624.0 · bid tab
  • 2024-05-28 · NCDOT · C204908 · $102.71 per LF · qty 400.0 · bid tab
storm pipe 24-inchLF5$158.00$130.00 to $178.33
Bids
  • 2025-09-16 · NCDOT · C204971 · $130.00 per LF · qty 4752.0 · bid tab
  • 2025-09-16 · NCDOT · C204971 · $150.00 per LF · qty 178.0 · bid tab
  • 2025-06-17 · NCDOT · C204798 · $165.00 per LF · qty 88.0 · bid tab
  • 2024-12-17 · NCDOT · C204821 · $158.00 per LF · qty 1028.0 · bid tab
  • 2024-05-28 · NCDOT · C204908 · $178.33 per LF · qty 168.0 · bid tab
storm pipe 30-inchLF3$200.00$170.00 to $220.00
Bids
  • 2026-08-18 · NCDOT · C205202 · $220.00 per LF · qty 68.0 · bid tab
  • 2025-09-16 · NCDOT · C204971 · $170.00 per LF · qty 1732.0 · bid tab
  • 2025-06-17 · NCDOT · C204798 · $200.00 per LF · qty 320.0 · bid tab
storm pipe 36-inchLF2$247.50$230.00 to $265.00
Bids
  • 2025-09-16 · NCDOT · C204971 · $230.00 per LF · qty 304.0 · bid tab
  • 2025-06-17 · NCDOT · C204798 · $265.00 per LF · qty 280.0 · bid tab
storm pipe 42-inchLF3$394.00$260.00 to $878.00
Bids
  • 2026-08-18 · NCDOT · C205202 · $878.00 per LF · qty 66.0 · bid tab
  • 2025-09-16 · NCDOT · C204971 · $260.00 per LF · qty 160.0 · bid tab
  • 2024-12-17 · NCDOT · C204821 · $394.00 per LF · qty 176.0 · bid tab
storm pipe 48-inchLF3$607.00$429.00 to $836.00
Bids
  • 2026-08-18 · NCDOT · C205202 · $836.00 per LF · qty 80.0 · bid tab
  • 2025-04-15 · NCDOT · C205061 · $607.00 per LF · qty 60.0 · bid tab
  • 2024-12-17 · NCDOT · C204821 · $429.00 per LF · qty 52.0 · bid tab
storm pipe 54-inchLF1$460.00$460.00 to $460.00
Bids
  • 2024-12-17 · NCDOT · C204821 · $460.00 per LF · qty 24.0 · bid tab
storm pipe 66-inchLF1$720.00$720.00 to $720.00
Bids
  • 2024-12-17 · NCDOT · C204821 · $720.00 per LF · qty 552.0 · bid tab
water main 10-inchLF1$215.00$215.00 to $215.00
Bids
  • 2025-09-16 · NCDOT · C204971 · $215.00 per LF · qty 50.0 · bid tab
water main 12-inchLF6$197.50$130.00 to $271.02
Bids
  • 2026-08-18 · NCDOT · C205202 · $210.00 per LF · qty 365.0 · bid tab
  • 2025-09-16 · NCDOT · C204971 · $185.00 per LF · qty 594.0 · bid tab
  • 2025-06-17 · NCDOT · C204798 · $130.00 per LF · qty 4128.0 · bid tab
  • 2025-04-15 · NCDOT · C205061 · $155.00 per LF · qty 431.0 · bid tab
  • 2024-12-17 · NCDOT · C204821 · $260.00 per LF · qty 872.0 · bid tab
  • 2024-05-28 · NCDOT · C204908 · $271.02 per LF · qty 494.0 · bid tab
water main 16-inchLF1$205.00$205.00 to $205.00
Bids
  • 2025-09-16 · NCDOT · C204971 · $205.00 per LF · qty 5070.0 · bid tab
water main 18-inchLF1$110.00$110.00 to $110.00
Bids
  • 2025-09-16 · NCDOT · C204971 · $110.00 per LF · qty 68.0 · bid tab
water main 30-inchLF1$715.00$715.00 to $715.00
Bids
  • 2025-04-15 · NCDOT · C205061 · $715.00 per LF · qty 200.0 · bid tab
water main 36-inchLF1$800.00$800.00 to $800.00
Bids
  • 2026-08-18 · NCDOT · C205202 · $800.00 per LF · qty 226.0 · bid tab
water main 4-inchLF1$125.00$125.00 to $125.00
Bids
  • 2024-12-17 · NCDOT · C204821 · $125.00 per LF · qty 214.0 · bid tab
water main 6-inchLF3$222.00$180.00 to $981.09
Bids
  • 2025-09-16 · NCDOT · C204971 · $180.00 per LF · qty 56.0 · bid tab
  • 2024-12-17 · NCDOT · C204821 · $222.00 per LF · qty 104.0 · bid tab
  • 2024-05-28 · NCDOT · C204908 · $981.09 per LF · qty 84.1 · bid tab
water main 8-inchLF5$195.00$145.00 to $529.00
Bids
  • 2025-09-16 · NCDOT · C204971 · $145.00 per LF · qty 643.0 · bid tab
  • 2025-06-17 · NCDOT · C204798 · $195.00 per LF · qty 105.0 · bid tab
  • 2025-04-15 · NCDOT · C205061 · $171.00 per LF · qty 78.0 · bid tab
  • 2024-12-17 · NCDOT · C204821 · $529.00 per LF · qty 76.0 · bid tab
  • 2024-05-28 · NCDOT · C204908 · $223.99 per LF · qty 915.9 · bid tab
water serviceLF7$110.00$45.00 to $153.23
Bids
  • 2026-08-18 · NCDOT · C205202 · $135.00 per LF · qty 118.0 · bid tab
  • 2026-08-18 · NCDOT · C205202 · $110.00 per LF · qty 67.0 · bid tab
  • 2025-09-16 · NCDOT · C204971 · $85.00 per LF · qty 176.0 · bid tab
  • 2025-06-17 · NCDOT · C204798 · $45.00 per LF · qty 472.0 · bid tab
  • 2024-12-17 · NCDOT · C204821 · $100.00 per LF · qty 105.0 · bid tab
  • 2024-05-28 · NCDOT · C204908 · $153.23 per LF · qty 67.7 · bid tab
  • 2024-05-28 · NCDOT · C204908 · $140.96 per LF · qty 551.9 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.