Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON4$500.00$500.00 to $575.00
Bids
  • 2026-03-17 · NCDOT · C205167 · $500.00 per TON · qty 1250.0 · bid tab
  • 2025-03-18 · NCDOT · C205058 · $500.00 per TON · qty 1334.0 · bid tab
  • 2024-11-19 · NCDOT · C204944 · $575.00 per TON · qty 470.0 · bid tab
  • 2024-04-16 · NCDOT · C204945 · $500.00 per TON · qty 558.0 · bid tab
curb gutterLF3$50.00$30.00 to $100.00
Bids
  • 2024-11-19 · NCDOT · C204944 · $50.00 per LF · qty 120.0 · bid tab
  • 2024-11-19 · NCDOT · C204944 · $30.00 per LF · qty 1590.0 · bid tab
  • 2024-04-16 · NCDOT · C204945 · $100.00 per LF · qty 20.0 · bid tab
excavation embankmentCY1$27.50$27.50 to $27.50
Bids
  • 2024-11-19 · NCDOT · C204944 · $27.50 per CY · qty 6860.0 · bid tab
fire hydrantLF1$84.00$84.00 to $84.00
Bids
  • 2024-11-19 · NCDOT · C204944 · $84.00 per LF · qty 39.0 · bid tab
flexible baseTON1$25.50$25.50 to $25.50
Bids
  • 2024-11-19 · NCDOT · C204944 · $25.50 per TON · qty 130.0 · bid tab
lime cement stabilizationSY3$4.30$2.90 to $4.30
Bids
  • 2026-03-17 · NCDOT · C205167 · $2.90 per SY · qty 13993.0 · bid tab
  • 2024-11-19 · NCDOT · C204944 · $4.30 per SY · qty 1200.0 · bid tab
  • 2024-11-19 · NCDOT · C204944 · $4.30 per SY · qty 2700.0 · bid tab
lime cement stabilizationTON2$31.50$28.50 to $34.50
Bids
  • 2026-03-17 · NCDOT · C205167 · $28.50 per TON · qty 4727.0 · bid tab
  • 2024-11-19 · NCDOT · C204944 · $34.50 per TON · qty 800.0 · bid tab
manholeEA6$1,050.00$650.00 to $4,955.00
Bids
  • 2026-03-17 · NCDOT · C205167 · $1,650.00 per EA · qty 2.0 · bid tab
  • 2024-11-19 · NCDOT · C204944 · $4,955.00 per EA · qty 2.0 · bid tab
  • 2024-11-19 · NCDOT · C204944 · $650.00 per EA · qty 8.0 · bid tab
  • 2024-11-19 · NCDOT · C204944 · $900.00 per EA · qty 1.0 · bid tab
  • 2024-04-16 · NCDOT · C204945 · $1,200.00 per EA · qty 6.0 · bid tab
  • 2024-04-16 · NCDOT · C204945 · $850.00 per EA · qty 1.0 · bid tab
sewer main 8-inchLF1$175.00$175.00 to $175.00
Bids
  • 2024-11-19 · NCDOT · C204944 · $175.00 per LF · qty 314.0 · bid tab
sewer serviceLF1$39.50$39.50 to $39.50
Bids
  • 2024-11-19 · NCDOT · C204944 · $39.50 per LF · qty 62.0 · bid tab
sidewalkEA2$3,250.00$2,850.00 to $3,650.00
Bids
  • 2024-11-19 · NCDOT · C204944 · $2,850.00 per EA · qty 5.0 · bid tab
  • 2024-04-16 · NCDOT · C204945 · $3,650.00 per EA · qty 3.0 · bid tab
sidewalkSY3$95.00$54.00 to $150.00
Bids
  • 2024-11-19 · NCDOT · C204944 · $54.00 per SY · qty 460.0 · bid tab
  • 2024-11-19 · NCDOT · C204944 · $95.00 per SY · qty 540.0 · bid tab
  • 2024-04-16 · NCDOT · C204945 · $150.00 per SY · qty 12.0 · bid tab
storm pipe 15-inchLF1$123.00$123.00 to $123.00
Bids
  • 2024-11-19 · NCDOT · C204944 · $123.00 per LF · qty 1136.0 · bid tab
storm pipe 18-inchLF1$133.00$133.00 to $133.00
Bids
  • 2024-11-19 · NCDOT · C204944 · $133.00 per LF · qty 68.0 · bid tab
storm pipe 24-inchLF2$222.00$214.00 to $230.00
Bids
  • 2024-11-19 · NCDOT · C204944 · $214.00 per LF · qty 80.0 · bid tab
  • 2024-11-19 · NCDOT · C204944 · $230.00 per LF · qty 164.0 · bid tab
water main 12-inchLF1$333.00$333.00 to $333.00
Bids
  • 2024-11-19 · NCDOT · C204944 · $333.00 per LF · qty 1264.0 · bid tab
water serviceLF2$81.00$43.00 to $119.00
Bids
  • 2024-11-19 · NCDOT · C204944 · $119.00 per LF · qty 63.0 · bid tab
  • 2024-11-19 · NCDOT · C204944 · $43.00 per LF · qty 52.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.