Site-work prices, Graham County, NC
Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.
| Category | Unit | Winning items | Median | Range | Receipts |
|---|---|---|---|---|---|
| asphalt pavement | TON | 1 | $840.00 | $840.00 to $840.00 | Bids
|
| curb gutter | LF | 2 | $53.50 | $42.00 to $65.00 | |
| excavation embankment | CY | 1 | $33.00 | $33.00 to $33.00 | Bids
|
| flexible base | TON | 1 | $60.00 | $60.00 to $60.00 | Bids
|
| inlet headwall | EA | 1 | $2,650.00 | $2,650.00 to $2,650.00 | Bids
|
| lime cement stabilization | SY | 3 | $4.50 | $4.50 to $6.00 | |
| lime cement stabilization | TON | 3 | $88.50 | $60.00 to $88.50 | |
| manhole | EA | 1 | $2,500.00 | $2,500.00 to $2,500.00 | Bids
|
| sidewalk | EA | 1 | $3,800.00 | $3,800.00 to $3,800.00 | Bids
|
| sidewalk | SY | 1 | $170.00 | $170.00 to $170.00 | Bids
|
| storm pipe 15-inch | LF | 1 | $130.00 | $130.00 to $130.00 | Bids
|
| storm pipe 18-inch | LF | 1 | $210.00 | $210.00 to $210.00 | Bids
|
| storm pipe 30-inch | LF | 2 | $255.00 | $235.00 to $275.00 | |
| storm pipe 60-inch | LF | 1 | $1,400.00 | $1,400.00 to $1,400.00 | Bids
|
Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.