Site-work prices, Davidson County, NC

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON6$645.00$565.00 to $695.00
Bids
  • 2025-10-21 · NCDOT · C205143 · $565.00 per TON · qty 2731.0 · bid tab
  • 2025-06-17 · NCDOT · C205016 · $655.00 per TON · qty 585.0 · bid tab
  • 2025-06-17 · NCDOT · C205037 · $620.00 per TON · qty 1390.0 · bid tab
  • 2024-10-15 · NCDOT · C204986 · $664.07 per TON · qty 2681.0 · bid tab
  • 2024-09-17 · NCDOT · C204941 · $695.00 per TON · qty 1100.0 · bid tab
  • 2023-11-21 · NCDOT · C204906 · $635.00 per TON · qty 2846.0 · bid tab
curb gutterLF6$33.00$27.00 to $61.00
Bids
  • 2025-06-17 · NCDOT · C205016 · $61.00 per LF · qty 400.0 · bid tab
  • 2025-06-17 · NCDOT · C205016 · $37.00 per LF · qty 2230.0 · bid tab
  • 2025-06-17 · NCDOT · C205037 · $31.00 per LF · qty 2260.0 · bid tab
  • 2024-09-17 · NCDOT · C204941 · $35.00 per LF · qty 900.0 · bid tab
  • 2024-09-17 · NCDOT · C204941 · $27.00 per LF · qty 2250.0 · bid tab
  • 2024-09-17 · NCDOT · C204941 · $29.00 per LF · qty 8100.0 · bid tab
excavation embankmentCY1$14.90$14.90 to $14.90
Bids
  • 2025-06-17 · NCDOT · C205037 · $14.90 per CY · qty 71100.0 · bid tab
fire hydrantEA1$10,000.00$10,000.00 to $10,000.00
Bids
  • 2024-09-17 · NCDOT · C204941 · $10,000.00 per EA · qty 4.0 · bid tab
fire hydrantLF1$175.00$175.00 to $175.00
Bids
  • 2024-09-17 · NCDOT · C204941 · $175.00 per LF · qty 104.0 · bid tab
flexible baseTON2$61.88$48.75 to $75.00
Bids
  • 2025-06-17 · NCDOT · C205037 · $48.75 per TON · qty 3300.0 · bid tab
  • 2024-09-17 · NCDOT · C204941 · $75.00 per TON · qty 140.0 · bid tab
inlet headwallEA2$2,237.03$1,400.00 to $3,074.06
Bids
  • 2025-06-17 · NCDOT · C205037 · $3,074.06 per EA · qty 1.0 · bid tab
  • 2025-06-17 · NCDOT · C205037 · $1,400.00 per EA · qty 1.0 · bid tab
lime cement stabilizationSY6$5.03$4.00 to $10.00
Bids
  • 2025-06-17 · NCDOT · C205016 · $4.00 per SY · qty 800.0 · bid tab
  • 2025-06-17 · NCDOT · C205016 · $5.00 per SY · qty 675.0 · bid tab
  • 2025-06-17 · NCDOT · C205037 · $5.90 per SY · qty 22500.0 · bid tab
  • 2025-06-17 · NCDOT · C205037 · $5.06 per SY · qty 3375.0 · bid tab
  • 2024-09-17 · NCDOT · C204941 · $4.00 per SY · qty 5010.0 · bid tab
  • 2024-09-17 · NCDOT · C204941 · $10.00 per SY · qty 1200.0 · bid tab
lime cement stabilizationTON4$47.04$40.00 to $55.00
Bids
  • 2025-06-17 · NCDOT · C205016 · $55.00 per TON · qty 500.0 · bid tab
  • 2025-06-17 · NCDOT · C205037 · $46.80 per TON · qty 11425.0 · bid tab
  • 2025-06-17 · NCDOT · C205037 · $47.28 per TON · qty 500.0 · bid tab
  • 2024-09-17 · NCDOT · C204941 · $40.00 per TON · qty 800.0 · bid tab
manholeEA8$1,324.27$750.00 to $18,680.58
Bids
  • 2025-10-21 · NCDOT · C205143 · $989.65 per EA · qty 2.0 · bid tab
  • 2025-06-17 · NCDOT · C205037 · $2,620.92 per EA · qty 2.0 · bid tab
  • 2025-06-17 · NCDOT · C205037 · $18,680.58 per EA · qty 6.0 · bid tab
  • 2025-06-17 · NCDOT · C205037 · $800.00 per EA · qty 16.0 · bid tab
  • 2024-10-15 · NCDOT · C204986 · $1,658.88 per EA · qty 24.0 · bid tab
  • 2024-09-17 · NCDOT · C204941 · $4,000.00 per EA · qty 7.0 · bid tab
  • 2024-09-17 · NCDOT · C204941 · $750.00 per EA · qty 33.0 · bid tab
  • 2023-11-21 · NCDOT · C204906 · $933.00 per EA · qty 70.0 · bid tab
sewer main 8-inchLF2$241.39$207.78 to $275.00
Bids
  • 2025-06-17 · NCDOT · C205037 · $207.78 per LF · qty 627.0 · bid tab
  • 2024-09-17 · NCDOT · C204941 · $275.00 per LF · qty 824.0 · bid tab
sewer serviceLF1$350.00$350.00 to $350.00
Bids
  • 2024-09-17 · NCDOT · C204941 · $350.00 per LF · qty 200.0 · bid tab
sidewalkEA1$2,290.00$2,290.00 to $2,290.00
Bids
  • 2024-09-17 · NCDOT · C204941 · $2,290.00 per EA · qty 32.0 · bid tab
sidewalkSY3$93.00$58.00 to $181.00
Bids
  • 2025-06-17 · NCDOT · C205037 · $181.00 per SY · qty 20.0 · bid tab
  • 2024-09-17 · NCDOT · C204941 · $58.00 per SY · qty 2950.0 · bid tab
  • 2024-09-17 · NCDOT · C204941 · $93.00 per SY · qty 500.0 · bid tab
storm pipe 12-inchLF1$83.80$83.80 to $83.80
Bids
  • 2025-06-17 · NCDOT · C205037 · $83.80 per LF · qty 40.0 · bid tab
storm pipe 15-inchLF5$150.00$107.48 to $170.00
Bids
  • 2025-06-17 · NCDOT · C205016 · $110.00 per LF · qty 352.0 · bid tab
  • 2025-06-17 · NCDOT · C205037 · $107.48 per LF · qty 1992.0 · bid tab
  • 2024-09-17 · NCDOT · C204941 · $170.00 per LF · qty 104.0 · bid tab
  • 2024-09-17 · NCDOT · C204941 · $150.00 per LF · qty 364.0 · bid tab
  • 2024-09-17 · NCDOT · C204941 · $160.00 per LF · qty 3616.0 · bid tab
storm pipe 18-inchLF4$180.00$154.20 to $200.00
Bids
  • 2025-06-17 · NCDOT · C205016 · $200.00 per LF · qty 76.0 · bid tab
  • 2025-06-17 · NCDOT · C205037 · $154.20 per LF · qty 1222.0 · bid tab
  • 2024-09-17 · NCDOT · C204941 · $185.00 per LF · qty 1112.0 · bid tab
  • 2024-09-17 · NCDOT · C204941 · $175.00 per LF · qty 608.0 · bid tab
storm pipe 24-inchLF3$225.00$189.32 to $235.00
Bids
  • 2025-06-17 · NCDOT · C205037 · $189.32 per LF · qty 912.0 · bid tab
  • 2024-09-17 · NCDOT · C204941 · $225.00 per LF · qty 224.0 · bid tab
  • 2024-09-17 · NCDOT · C204941 · $235.00 per LF · qty 204.0 · bid tab
storm pipe 30-inchLF3$327.82$275.00 to $350.00
Bids
  • 2025-06-17 · NCDOT · C205037 · $327.82 per LF · qty 376.0 · bid tab
  • 2024-09-17 · NCDOT · C204941 · $350.00 per LF · qty 40.0 · bid tab
  • 2024-09-17 · NCDOT · C204941 · $275.00 per LF · qty 76.0 · bid tab
storm pipe 54-inchLF1$904.00$904.00 to $904.00
Bids
  • 2025-06-17 · NCDOT · C205037 · $904.00 per LF · qty 12.0 · bid tab
water main 12-inchLF1$258.67$258.67 to $258.67
Bids
  • 2025-06-17 · NCDOT · C205037 · $258.67 per LF · qty 280.0 · bid tab
water main 16-inchLF1$550.00$550.00 to $550.00
Bids
  • 2024-09-17 · NCDOT · C204941 · $550.00 per LF · qty 483.0 · bid tab
water main 2-inchLF1$510.18$510.18 to $510.18
Bids
  • 2025-06-17 · NCDOT · C205037 · $510.18 per LF · qty 5.0 · bid tab
water main 6-inchLF3$210.00$200.00 to $273.30
Bids
  • 2025-06-17 · NCDOT · C205016 · $210.00 per LF · qty 312.0 · bid tab
  • 2025-06-17 · NCDOT · C205037 · $273.30 per LF · qty 263.0 · bid tab
  • 2024-09-17 · NCDOT · C204941 · $200.00 per LF · qty 5507.0 · bid tab
water main 8-inchLF2$279.69$159.38 to $400.00
Bids
  • 2025-06-17 · NCDOT · C205037 · $159.38 per LF · qty 1160.0 · bid tab
  • 2024-09-17 · NCDOT · C204941 · $400.00 per LF · qty 80.0 · bid tab
water main (diameter not stated)LF1$287.29$287.29 to $287.29
Bids
  • 2025-06-17 · NCDOT · C205037 · $287.29 per LF · qty 73.0 · bid tab
water serviceLF2$99.09$48.17 to $150.00
Bids
  • 2025-06-17 · NCDOT · C205037 · $48.17 per LF · qty 148.0 · bid tab
  • 2024-09-17 · NCDOT · C204941 · $150.00 per LF · qty 499.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.