Site-work prices, Dare County, NC
Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.
| Category | Unit | Winning items | Median | Range | Receipts |
|---|---|---|---|---|---|
| asphalt pavement | TON | 1 | $490.00 | $490.00 to $490.00 | Bids
|
| curb gutter | LF | 1 | $85.00 | $85.00 to $85.00 | Bids
|
| excavation embankment | CY | 1 | $52.00 | $52.00 to $52.00 | Bids
|
| fire hydrant | EA | 1 | $8,000.00 | $8,000.00 to $8,000.00 | Bids
|
| fire hydrant | LF | 1 | $105.00 | $105.00 to $105.00 | Bids
|
| lime cement stabilization | SY | 1 | $18.00 | $18.00 to $18.00 | Bids
|
| sidewalk | EA | 1 | $3,100.00 | $3,100.00 to $3,100.00 | Bids
|
| sidewalk | SY | 2 | $172.50 | $145.00 to $200.00 | |
| storm pipe 15-inch | LF | 1 | $61.12 | $61.12 to $61.12 | Bids
|
| storm pipe 18-inch | LF | 1 | $90.21 | $90.21 to $90.21 | Bids
|
| storm pipe 24-inch | LF | 1 | $117.13 | $117.13 to $117.13 | Bids
|
| storm pipe 30-inch | LF | 1 | $138.38 | $138.38 to $138.38 | Bids
|
| storm pipe 36-inch | LF | 1 | $203.47 | $203.47 to $203.47 | Bids
|
| water main 3-inch | LF | 1 | $200.00 | $200.00 to $200.00 | Bids
|
| water main 4-inch | LF | 1 | $100.00 | $100.00 to $100.00 | Bids
|
| water main 6-inch | LF | 1 | $90.00 | $90.00 to $90.00 | Bids
|
| water service | LF | 1 | $25.00 | $25.00 to $25.00 | Bids
|
Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.