Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON1$450.00$450.00 to $450.00
Bids
  • 2025-07-15 · NCDOT · C204421 · $450.00 per TON · qty 3575.0 · bid tab
curb gutterLF3$37.75$26.75 to $47.75
Bids
  • 2025-07-15 · NCDOT · C204421 · $26.75 per LF · qty 6510.0 · bid tab
  • 2025-07-15 · NCDOT · C204421 · $47.75 per LF · qty 610.0 · bid tab
  • 2025-07-15 · NCDOT · C204421 · $37.75 per LF · qty 2040.0 · bid tab
excavation embankmentCY1$1.00$1.00 to $1.00
Bids
  • 2025-07-15 · NCDOT · C204421 · $1.00 per CY · qty 294210.0 · bid tab
fire hydrantEA1$6,565.00$6,565.00 to $6,565.00
Bids
  • 2025-07-15 · NCDOT · C204421 · $6,565.00 per EA · qty 1.0 · bid tab
fire hydrantLF1$110.00$110.00 to $110.00
Bids
  • 2025-07-15 · NCDOT · C204421 · $110.00 per LF · qty 92.0 · bid tab
flexible baseTON1$56.00$56.00 to $56.00
Bids
  • 2025-07-15 · NCDOT · C204421 · $56.00 per TON · qty 52300.0 · bid tab
inlet headwallEA1$1,645.00$1,645.00 to $1,645.00
Bids
  • 2025-07-15 · NCDOT · C204421 · $1,645.00 per EA · qty 19.0 · bid tab
lime cement stabilizationSY2$5.00$5.00 to $5.00
Bids
  • 2025-07-15 · NCDOT · C204421 · $5.00 per SY · qty 1500.0 · bid tab
  • 2025-07-15 · NCDOT · C204421 · $5.00 per SY · qty 45900.0 · bid tab
lime cement stabilizationTON1$55.00$55.00 to $55.00
Bids
  • 2025-07-15 · NCDOT · C204421 · $55.00 per TON · qty 950.0 · bid tab
manholeEA5$1,900.00$770.00 to $9,100.00
Bids
  • 2025-07-15 · NCDOT · C204421 · $1,900.00 per EA · qty 3.0 · bid tab
  • 2025-07-15 · NCDOT · C204421 · $1,500.00 per EA · qty 36.0 · bid tab
  • 2025-07-15 · NCDOT · C204421 · $770.00 per EA · qty 12.0 · bid tab
  • 2025-07-15 · NCDOT · C204421 · $3,200.00 per EA · qty 1.0 · bid tab
  • 2025-07-15 · NCDOT · C204421 · $9,100.00 per EA · qty 5.0 · bid tab
sewer main 8-inchLF1$147.00$147.00 to $147.00
Bids
  • 2025-07-15 · NCDOT · C204421 · $147.00 per LF · qty 1164.0 · bid tab
sidewalkEA1$2,500.00$2,500.00 to $2,500.00
Bids
  • 2025-07-15 · NCDOT · C204421 · $2,500.00 per EA · qty 2.0 · bid tab
sidewalkSY2$111.50$82.50 to $140.50
Bids
  • 2025-07-15 · NCDOT · C204421 · $82.50 per SY · qty 180.0 · bid tab
  • 2025-07-15 · NCDOT · C204421 · $140.50 per SY · qty 70.0 · bid tab
storm pipe 15-inchLF2$93.00$90.00 to $96.00
Bids
  • 2025-07-15 · NCDOT · C204421 · $96.00 per LF · qty 1044.0 · bid tab
  • 2025-07-15 · NCDOT · C204421 · $90.00 per LF · qty 1128.0 · bid tab
storm pipe 18-inchLF2$105.00$100.00 to $110.00
Bids
  • 2025-07-15 · NCDOT · C204421 · $100.00 per LF · qty 1916.0 · bid tab
  • 2025-07-15 · NCDOT · C204421 · $110.00 per LF · qty 1296.0 · bid tab
storm pipe 24-inchLF2$132.50$125.00 to $140.00
Bids
  • 2025-07-15 · NCDOT · C204421 · $140.00 per LF · qty 132.0 · bid tab
  • 2025-07-15 · NCDOT · C204421 · $125.00 per LF · qty 152.0 · bid tab
storm pipe 30-inchLF2$172.50$160.00 to $185.00
Bids
  • 2025-07-15 · NCDOT · C204421 · $185.00 per LF · qty 200.0 · bid tab
  • 2025-07-15 · NCDOT · C204421 · $160.00 per LF · qty 244.0 · bid tab
storm pipe 36-inchLF2$292.50$140.00 to $445.00
Bids
  • 2025-07-15 · NCDOT · C204421 · $445.00 per LF · qty 12.0 · bid tab
  • 2025-07-15 · NCDOT · C204421 · $140.00 per LF · qty 56.0 · bid tab
storm pipe 42-inchLF1$287.00$287.00 to $287.00
Bids
  • 2025-07-15 · NCDOT · C204421 · $287.00 per LF · qty 528.0 · bid tab
storm pipe 54-inchLF1$486.00$486.00 to $486.00
Bids
  • 2025-07-15 · NCDOT · C204421 · $486.00 per LF · qty 668.0 · bid tab
storm pipe 66-inchLF1$640.00$640.00 to $640.00
Bids
  • 2025-07-15 · NCDOT · C204421 · $640.00 per LF · qty 204.0 · bid tab
water main 10-inchLF1$92.00$92.00 to $92.00
Bids
  • 2025-07-15 · NCDOT · C204421 · $92.00 per LF · qty 2659.0 · bid tab
water main 6-inchLF1$140.00$140.00 to $140.00
Bids
  • 2025-07-15 · NCDOT · C204421 · $140.00 per LF · qty 305.0 · bid tab
water main 8-inchLF1$83.00$83.00 to $83.00
Bids
  • 2025-07-15 · NCDOT · C204421 · $83.00 per LF · qty 2592.0 · bid tab
water serviceLF2$66.00$65.00 to $67.00
Bids
  • 2025-07-15 · NCDOT · C204421 · $67.00 per LF · qty 51.0 · bid tab
  • 2025-07-15 · NCDOT · C204421 · $65.00 per LF · qty 103.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.