| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 1 | $450.00 | $450.00 to $450.00 | Bids- 2025-07-15 · NCDOT · C204421 · $450.00 per TON · qty 3575.0 · bid tab
|
| curb gutter | LF | 3 | $37.75 | $26.75 to $47.75 | Bids- 2025-07-15 · NCDOT · C204421 · $26.75 per LF · qty 6510.0 · bid tab
- 2025-07-15 · NCDOT · C204421 · $47.75 per LF · qty 610.0 · bid tab
- 2025-07-15 · NCDOT · C204421 · $37.75 per LF · qty 2040.0 · bid tab
|
| excavation embankment | CY | 1 | $1.00 | $1.00 to $1.00 | Bids- 2025-07-15 · NCDOT · C204421 · $1.00 per CY · qty 294210.0 · bid tab
|
| fire hydrant | EA | 1 | $6,565.00 | $6,565.00 to $6,565.00 | Bids- 2025-07-15 · NCDOT · C204421 · $6,565.00 per EA · qty 1.0 · bid tab
|
| fire hydrant | LF | 1 | $110.00 | $110.00 to $110.00 | Bids- 2025-07-15 · NCDOT · C204421 · $110.00 per LF · qty 92.0 · bid tab
|
| flexible base | TON | 1 | $56.00 | $56.00 to $56.00 | Bids- 2025-07-15 · NCDOT · C204421 · $56.00 per TON · qty 52300.0 · bid tab
|
| inlet headwall | EA | 1 | $1,645.00 | $1,645.00 to $1,645.00 | Bids- 2025-07-15 · NCDOT · C204421 · $1,645.00 per EA · qty 19.0 · bid tab
|
| lime cement stabilization | SY | 2 | $5.00 | $5.00 to $5.00 | Bids- 2025-07-15 · NCDOT · C204421 · $5.00 per SY · qty 1500.0 · bid tab
- 2025-07-15 · NCDOT · C204421 · $5.00 per SY · qty 45900.0 · bid tab
|
| lime cement stabilization | TON | 1 | $55.00 | $55.00 to $55.00 | Bids- 2025-07-15 · NCDOT · C204421 · $55.00 per TON · qty 950.0 · bid tab
|
| manhole | EA | 5 | $1,900.00 | $770.00 to $9,100.00 | Bids- 2025-07-15 · NCDOT · C204421 · $1,900.00 per EA · qty 3.0 · bid tab
- 2025-07-15 · NCDOT · C204421 · $1,500.00 per EA · qty 36.0 · bid tab
- 2025-07-15 · NCDOT · C204421 · $770.00 per EA · qty 12.0 · bid tab
- 2025-07-15 · NCDOT · C204421 · $3,200.00 per EA · qty 1.0 · bid tab
- 2025-07-15 · NCDOT · C204421 · $9,100.00 per EA · qty 5.0 · bid tab
|
| sewer main 8-inch | LF | 1 | $147.00 | $147.00 to $147.00 | Bids- 2025-07-15 · NCDOT · C204421 · $147.00 per LF · qty 1164.0 · bid tab
|
| sidewalk | EA | 1 | $2,500.00 | $2,500.00 to $2,500.00 | Bids- 2025-07-15 · NCDOT · C204421 · $2,500.00 per EA · qty 2.0 · bid tab
|
| sidewalk | SY | 2 | $111.50 | $82.50 to $140.50 | Bids- 2025-07-15 · NCDOT · C204421 · $82.50 per SY · qty 180.0 · bid tab
- 2025-07-15 · NCDOT · C204421 · $140.50 per SY · qty 70.0 · bid tab
|
| storm pipe 15-inch | LF | 2 | $93.00 | $90.00 to $96.00 | Bids- 2025-07-15 · NCDOT · C204421 · $96.00 per LF · qty 1044.0 · bid tab
- 2025-07-15 · NCDOT · C204421 · $90.00 per LF · qty 1128.0 · bid tab
|
| storm pipe 18-inch | LF | 2 | $105.00 | $100.00 to $110.00 | Bids- 2025-07-15 · NCDOT · C204421 · $100.00 per LF · qty 1916.0 · bid tab
- 2025-07-15 · NCDOT · C204421 · $110.00 per LF · qty 1296.0 · bid tab
|
| storm pipe 24-inch | LF | 2 | $132.50 | $125.00 to $140.00 | Bids- 2025-07-15 · NCDOT · C204421 · $140.00 per LF · qty 132.0 · bid tab
- 2025-07-15 · NCDOT · C204421 · $125.00 per LF · qty 152.0 · bid tab
|
| storm pipe 30-inch | LF | 2 | $172.50 | $160.00 to $185.00 | Bids- 2025-07-15 · NCDOT · C204421 · $185.00 per LF · qty 200.0 · bid tab
- 2025-07-15 · NCDOT · C204421 · $160.00 per LF · qty 244.0 · bid tab
|
| storm pipe 36-inch | LF | 2 | $292.50 | $140.00 to $445.00 | Bids- 2025-07-15 · NCDOT · C204421 · $445.00 per LF · qty 12.0 · bid tab
- 2025-07-15 · NCDOT · C204421 · $140.00 per LF · qty 56.0 · bid tab
|
| storm pipe 42-inch | LF | 1 | $287.00 | $287.00 to $287.00 | Bids- 2025-07-15 · NCDOT · C204421 · $287.00 per LF · qty 528.0 · bid tab
|
| storm pipe 54-inch | LF | 1 | $486.00 | $486.00 to $486.00 | Bids- 2025-07-15 · NCDOT · C204421 · $486.00 per LF · qty 668.0 · bid tab
|
| storm pipe 66-inch | LF | 1 | $640.00 | $640.00 to $640.00 | Bids- 2025-07-15 · NCDOT · C204421 · $640.00 per LF · qty 204.0 · bid tab
|
| water main 10-inch | LF | 1 | $92.00 | $92.00 to $92.00 | Bids- 2025-07-15 · NCDOT · C204421 · $92.00 per LF · qty 2659.0 · bid tab
|
| water main 6-inch | LF | 1 | $140.00 | $140.00 to $140.00 | Bids- 2025-07-15 · NCDOT · C204421 · $140.00 per LF · qty 305.0 · bid tab
|
| water main 8-inch | LF | 1 | $83.00 | $83.00 to $83.00 | Bids- 2025-07-15 · NCDOT · C204421 · $83.00 per LF · qty 2592.0 · bid tab
|
| water service | LF | 2 | $66.00 | $65.00 to $67.00 | Bids- 2025-07-15 · NCDOT · C204421 · $67.00 per LF · qty 51.0 · bid tab
- 2025-07-15 · NCDOT · C204421 · $65.00 per LF · qty 103.0 · bid tab
|