| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 4 | $671.00 | $625.00 to $760.00 | Bids- 2026-01-20 · NCDOT · C205132 · $625.00 per TON · qty 145.0 · bid tab
- 2025-11-18 · NCDOT · C205147 · $669.00 per TON · qty 2062.0 · bid tab
- 2025-03-18 · NCDOT · C204938 · $760.00 per TON · qty 170.0 · bid tab
- 2024-12-17 · NCDOT · C205004 · $673.00 per TON · qty 1950.0 · bid tab
|
| excavation embankment | CY | 1 | $12.00 | $12.00 to $12.00 | Bids- 2026-01-20 · NCDOT · C205132 · $12.00 per CY · qty 31000.0 · bid tab
|
| flexible base | TON | 2 | $65.55 | $48.60 to $82.50 | Bids- 2026-01-20 · NCDOT · C205132 · $48.60 per TON · qty 1518.0 · bid tab
- 2025-03-18 · NCDOT · C204938 · $82.50 per TON · qty 120.0 · bid tab
|
| lime cement stabilization | SY | 4 | $4.00 | $3.00 to $6.75 | Bids- 2026-01-20 · NCDOT · C205132 · $3.00 per SY · qty 200.0 · bid tab
- 2026-01-20 · NCDOT · C205132 · $3.00 per SY · qty 500.0 · bid tab
- 2025-03-18 · NCDOT · C204938 · $5.00 per SY · qty 400.0 · bid tab
- 2025-03-18 · NCDOT · C204938 · $6.75 per SY · qty 300.0 · bid tab
|
| lime cement stabilization | TON | 2 | $45.72 | $44.43 to $47.00 | Bids- 2026-01-20 · NCDOT · C205132 · $44.43 per TON · qty 200.0 · bid tab
- 2025-03-18 · NCDOT · C204938 · $47.00 per TON · qty 200.0 · bid tab
|
| manhole | EA | 6 | $3,650.00 | $1,100.00 to $5,700.00 | Bids- 2025-11-18 · NCDOT · C205147 · $3,800.00 per EA · qty 22.0 · bid tab
- 2025-11-18 · NCDOT · C205147 · $1,100.00 per EA · qty 3.0 · bid tab
- 2025-11-18 · NCDOT · C205147 · $5,700.00 per EA · qty 2.0 · bid tab
- 2024-12-17 · NCDOT · C205004 · $3,500.00 per EA · qty 18.0 · bid tab
- 2024-12-17 · NCDOT · C205004 · $1,500.00 per EA · qty 3.0 · bid tab
- 2024-12-17 · NCDOT · C205004 · $5,000.00 per EA · qty 3.0 · bid tab
|
| sidewalk | EA | 3 | $5,000.00 | $4,500.00 to $5,500.00 | Bids- 2025-11-18 · NCDOT · C205147 · $5,500.00 per EA · qty 14.0 · bid tab
- 2025-11-18 · NCDOT · C205147 · $4,500.00 per EA · qty 25.0 · bid tab
- 2024-12-17 · NCDOT · C205004 · $5,000.00 per EA · qty 17.0 · bid tab
|
| storm pipe 15-inch | LF | 2 | $95.84 | $75.00 to $116.68 | Bids- 2026-01-20 · NCDOT · C205132 · $75.00 per LF · qty 260.0 · bid tab
- 2025-03-18 · NCDOT · C204938 · $116.68 per LF · qty 76.0 · bid tab
|
| storm pipe 24-inch | LF | 2 | $195.19 | $125.00 to $265.37 | Bids- 2026-01-20 · NCDOT · C205132 · $125.00 per LF · qty 60.0 · bid tab
- 2025-03-18 · NCDOT · C204938 · $265.37 per LF · qty 224.0 · bid tab
|
| storm pipe 36-inch | LF | 2 | $273.31 | $256.75 to $289.88 | Bids- 2025-03-18 · NCDOT · C204938 · $256.75 per LF · qty 64.0 · bid tab
- 2025-03-18 · NCDOT · C204938 · $289.88 per LF · qty 108.0 · bid tab
|
| water main 12-inch | LF | 1 | $113.92 | $113.92 to $113.92 | Bids- 2025-03-18 · NCDOT · C204938 · $113.92 per LF · qty 1615.0 · bid tab
|