Site-work prices, Cherokee County, NC

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON1$890.00$890.00 to $890.00
Bids
  • 2023-12-19 · NCDOT · C204887 · $890.00 per TON · qty 4530.0 · bid tab
curb gutterLF2$48.88$45.50 to $52.25
Bids
  • 2023-12-19 · NCDOT · C204887 · $52.25 per LF · qty 2550.0 · bid tab
  • 2023-12-19 · NCDOT · C204887 · $45.50 per LF · qty 1220.0 · bid tab
excavation embankmentCY2$18.88$10.70 to $27.05
Bids
  • 2023-12-19 · NCDOT · C204887 · $10.70 per CY · qty 1197000.0 · bid tab
  • 2023-12-19 · NCDOT · C204887 · $27.05 per CY · qty 1400.0 · bid tab
fire hydrantEA1$11,100.00$11,100.00 to $11,100.00
Bids
  • 2023-12-19 · NCDOT · C204887 · $11,100.00 per EA · qty 3.0 · bid tab
fire hydrantLF1$193.00$193.00 to $193.00
Bids
  • 2023-12-19 · NCDOT · C204887 · $193.00 per LF · qty 39.0 · bid tab
flexible baseTON1$45.50$45.50 to $45.50
Bids
  • 2023-12-19 · NCDOT · C204887 · $45.50 per TON · qty 16920.0 · bid tab
inlet headwallEA1$2,160.00$2,160.00 to $2,160.00
Bids
  • 2023-12-19 · NCDOT · C204887 · $2,160.00 per EA · qty 5.0 · bid tab
lime cement stabilizationSY1$1.60$1.60 to $1.60
Bids
  • 2023-12-19 · NCDOT · C204887 · $1.60 per SY · qty 10112.0 · bid tab
lime cement stabilizationTON1$36.50$36.50 to $36.50
Bids
  • 2023-12-19 · NCDOT · C204887 · $36.50 per TON · qty 2000.0 · bid tab
manholeEA5$1,580.00$1,070.00 to $7,960.00
Bids
  • 2023-12-19 · NCDOT · C204887 · $7,960.00 per EA · qty 13.0 · bid tab
  • 2023-12-19 · NCDOT · C204887 · $1,580.00 per EA · qty 1.0 · bid tab
  • 2023-12-19 · NCDOT · C204887 · $1,410.00 per EA · qty 2.0 · bid tab
  • 2023-12-19 · NCDOT · C204887 · $2,310.00 per EA · qty 1.0 · bid tab
  • 2023-12-19 · NCDOT · C204887 · $1,070.00 per EA · qty 7.0 · bid tab
sewer main 8-inchLF1$284.00$284.00 to $284.00
Bids
  • 2023-12-19 · NCDOT · C204887 · $284.00 per LF · qty 1558.0 · bid tab
sewer serviceLF1$120.00$120.00 to $120.00
Bids
  • 2023-12-19 · NCDOT · C204887 · $120.00 per LF · qty 182.0 · bid tab
sidewalkSY1$131.00$131.00 to $131.00
Bids
  • 2023-12-19 · NCDOT · C204887 · $131.00 per SY · qty 300.0 · bid tab
storm pipe 15-inchLF2$94.12$92.25 to $96.00
Bids
  • 2023-12-19 · NCDOT · C204887 · $92.25 per LF · qty 2908.0 · bid tab
  • 2023-12-19 · NCDOT · C204887 · $96.00 per LF · qty 408.0 · bid tab
storm pipe 18-inchLF2$103.00$100.00 to $106.00
Bids
  • 2023-12-19 · NCDOT · C204887 · $100.00 per LF · qty 2220.0 · bid tab
  • 2023-12-19 · NCDOT · C204887 · $106.00 per LF · qty 108.0 · bid tab
storm pipe 24-inchLF1$123.00$123.00 to $123.00
Bids
  • 2023-12-19 · NCDOT · C204887 · $123.00 per LF · qty 1872.0 · bid tab
storm pipe 30-inchLF2$179.50$170.00 to $189.00
Bids
  • 2023-12-19 · NCDOT · C204887 · $170.00 per LF · qty 624.0 · bid tab
  • 2023-12-19 · NCDOT · C204887 · $189.00 per LF · qty 64.0 · bid tab
storm pipe 36-inchLF2$221.50$209.00 to $234.00
Bids
  • 2023-12-19 · NCDOT · C204887 · $209.00 per LF · qty 276.0 · bid tab
  • 2023-12-19 · NCDOT · C204887 · $234.00 per LF · qty 700.0 · bid tab
storm pipe 42-inchLF1$249.00$249.00 to $249.00
Bids
  • 2023-12-19 · NCDOT · C204887 · $249.00 per LF · qty 532.0 · bid tab
storm pipe 48-inchLF2$397.00$373.00 to $421.00
Bids
  • 2023-12-19 · NCDOT · C204887 · $373.00 per LF · qty 776.0 · bid tab
  • 2023-12-19 · NCDOT · C204887 · $421.00 per LF · qty 60.0 · bid tab
storm pipe 54-inchLF1$540.00$540.00 to $540.00
Bids
  • 2023-12-19 · NCDOT · C204887 · $540.00 per LF · qty 184.0 · bid tab
storm pipe 60-inchLF1$620.00$620.00 to $620.00
Bids
  • 2023-12-19 · NCDOT · C204887 · $620.00 per LF · qty 272.0 · bid tab
storm pipe 66-inchLF2$905.00$850.00 to $960.00
Bids
  • 2023-12-19 · NCDOT · C204887 · $960.00 per LF · qty 56.0 · bid tab
  • 2023-12-19 · NCDOT · C204887 · $850.00 per LF · qty 504.0 · bid tab
storm pipe 72-inchLF1$940.00$940.00 to $940.00
Bids
  • 2023-12-19 · NCDOT · C204887 · $940.00 per LF · qty 208.0 · bid tab
water main 10-inchLF1$193.00$193.00 to $193.00
Bids
  • 2023-12-19 · NCDOT · C204887 · $193.00 per LF · qty 1444.0 · bid tab
water main 12-inchLF1$193.00$193.00 to $193.00
Bids
  • 2023-12-19 · NCDOT · C204887 · $193.00 per LF · qty 105.0 · bid tab
water main 6-inchLF1$193.00$193.00 to $193.00
Bids
  • 2023-12-19 · NCDOT · C204887 · $193.00 per LF · qty 25.0 · bid tab
water serviceLF1$216.00$216.00 to $216.00
Bids
  • 2023-12-19 · NCDOT · C204887 · $216.00 per LF · qty 30.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.