Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON7$550.00$405.00 to $640.00
Bids
  • 2026-01-20 · NCDOT · C205161 · $545.00 per TON · qty 3755.0 · bid tab
  • 2025-05-20 · NCDOT · C205032 · $610.00 per TON · qty 3705.0 · bid tab
  • 2025-03-18 · NCDOT · C204933 · $550.00 per TON · qty 1335.0 · bid tab
  • 2024-12-17 · NCDOT · C205005 · $550.00 per TON · qty 2993.0 · bid tab
  • 2024-12-17 · NCDOT · C205008 · $405.00 per TON · qty 648.0 · bid tab
  • 2024-04-16 · NCDOT · C204922 · $640.00 per TON · qty 310.0 · bid tab
  • 2024-01-16 · NCDOT · C204903 · $560.00 per TON · qty 2797.0 · bid tab
curb gutterLF7$24.75$17.75 to $37.60
Bids
  • 2025-05-20 · NCDOT · C205032 · $17.75 per LF · qty 25600.0 · bid tab
  • 2025-05-20 · NCDOT · C205032 · $25.00 per LF · qty 17800.0 · bid tab
  • 2025-05-20 · NCDOT · C205032 · $37.60 per LF · qty 270.0 · bid tab
  • 2025-03-18 · NCDOT · C204933 · $17.75 per LF · qty 14300.0 · bid tab
  • 2025-03-18 · NCDOT · C204933 · $29.15 per LF · qty 3800.0 · bid tab
  • 2024-04-16 · NCDOT · C204922 · $19.95 per LF · qty 2150.0 · bid tab
  • 2024-04-16 · NCDOT · C204922 · $24.75 per LF · qty 4970.0 · bid tab
excavation embankmentCY5$13.80$5.20 to $58.00
Bids
  • 2026-01-20 · NCDOT · C205161 · $58.00 per CY · qty 265.0 · bid tab
  • 2025-05-20 · NCDOT · C205032 · $18.00 per CY · qty 4900.0 · bid tab
  • 2025-05-20 · NCDOT · C205032 · $5.20 per CY · qty 457000.0 · bid tab
  • 2025-03-18 · NCDOT · C204933 · $6.50 per CY · qty 112000.0 · bid tab
  • 2025-03-18 · NCDOT · C204933 · $13.80 per CY · qty 110000.0 · bid tab
fire hydrantEA3$8,000.00$7,225.00 to $9,140.00
Bids
  • 2025-05-20 · NCDOT · C205032 · $7,225.00 per EA · qty 16.0 · bid tab
  • 2025-03-18 · NCDOT · C204933 · $9,140.00 per EA · qty 2.0 · bid tab
  • 2024-04-16 · NCDOT · C204922 · $8,000.00 per EA · qty 3.0 · bid tab
fire hydrantLF3$102.00$90.00 to $120.00
Bids
  • 2025-05-20 · NCDOT · C205032 · $90.00 per LF · qty 237.0 · bid tab
  • 2025-03-18 · NCDOT · C204933 · $102.00 per LF · qty 27.0 · bid tab
  • 2024-04-16 · NCDOT · C204922 · $120.00 per LF · qty 49.0 · bid tab
flexible baseTON3$34.90$34.00 to $35.00
Bids
  • 2025-05-20 · NCDOT · C205032 · $35.00 per TON · qty 13600.0 · bid tab
  • 2025-03-18 · NCDOT · C204933 · $34.90 per TON · qty 6900.0 · bid tab
  • 2024-04-16 · NCDOT · C204922 · $34.00 per TON · qty 1080.0 · bid tab
inlet headwallEA3$1,500.00$1,000.00 to $2,000.00
Bids
  • 2025-05-20 · NCDOT · C205032 · $1,500.00 per EA · qty 25.0 · bid tab
  • 2025-03-18 · NCDOT · C204933 · $1,000.00 per EA · qty 17.0 · bid tab
  • 2024-04-16 · NCDOT · C204922 · $2,000.00 per EA · qty 2.0 · bid tab
lime cement stabilizationSY8$3.65$3.00 to $5.50
Bids
  • 2025-05-20 · NCDOT · C205032 · $3.20 per SY · qty 15130.0 · bid tab
  • 2025-05-20 · NCDOT · C205032 · $3.80 per SY · qty 56500.0 · bid tab
  • 2025-05-20 · NCDOT · C205032 · $5.50 per SY · qty 12025.0 · bid tab
  • 2025-03-18 · NCDOT · C204933 · $5.29 per SY · qty 21000.0 · bid tab
  • 2025-03-18 · NCDOT · C204933 · $3.10 per SY · qty 4150.0 · bid tab
  • 2025-03-18 · NCDOT · C204933 · $3.50 per SY · qty 10350.0 · bid tab
  • 2024-04-16 · NCDOT · C204922 · $5.00 per SY · qty 400.0 · bid tab
  • 2024-04-16 · NCDOT · C204922 · $3.00 per SY · qty 5730.0 · bid tab
lime cement stabilizationTON7$41.00$28.00 to $350.00
Bids
  • 2025-05-20 · NCDOT · C205032 · $30.00 per TON · qty 500.0 · bid tab
  • 2025-05-20 · NCDOT · C205032 · $28.00 per TON · qty 7810.0 · bid tab
  • 2025-05-20 · NCDOT · C205032 · $350.00 per TON · qty 700.0 · bid tab
  • 2025-03-18 · NCDOT · C204933 · $308.00 per TON · qty 260.0 · bid tab
  • 2025-03-18 · NCDOT · C204933 · $41.00 per TON · qty 1150.0 · bid tab
  • 2025-03-18 · NCDOT · C204933 · $45.00 per TON · qty 300.0 · bid tab
  • 2024-04-16 · NCDOT · C204922 · $28.00 per TON · qty 2580.0 · bid tab
manholeEA6$1,250.00$800.00 to $8,900.00
Bids
  • 2026-01-20 · NCDOT · C205161 · $1,250.00 per EA · qty 6.0 · bid tab
  • 2025-05-20 · NCDOT · C205032 · $800.00 per EA · qty 15.0 · bid tab
  • 2025-05-20 · NCDOT · C205032 · $1,250.00 per EA · qty 8.0 · bid tab
  • 2025-03-18 · NCDOT · C204933 · $825.00 per EA · qty 23.0 · bid tab
  • 2025-03-18 · NCDOT · C204933 · $1,300.00 per EA · qty 11.0 · bid tab
  • 2024-04-16 · NCDOT · C204922 · $8,900.00 per EA · qty 10.0 · bid tab
sewer main 15-inchLF1$125.00$125.00 to $125.00
Bids
  • 2024-04-16 · NCDOT · C204922 · $125.00 per LF · qty 1321.0 · bid tab
sewer main 16-inchLF1$200.00$200.00 to $200.00
Bids
  • 2024-04-16 · NCDOT · C204922 · $200.00 per LF · qty 80.0 · bid tab
sidewalkEA3$2,650.00$2,650.00 to $2,985.00
Bids
  • 2025-05-20 · NCDOT · C205032 · $2,650.00 per EA · qty 120.0 · bid tab
  • 2025-03-18 · NCDOT · C204933 · $2,650.00 per EA · qty 13.0 · bid tab
  • 2024-04-16 · NCDOT · C204922 · $2,985.00 per EA · qty 12.0 · bid tab
sidewalkSY3$87.00$84.60 to $125.00
Bids
  • 2026-01-20 · NCDOT · C205161 · $87.00 per SY · qty 275.0 · bid tab
  • 2025-05-20 · NCDOT · C205032 · $84.60 per SY · qty 370.0 · bid tab
  • 2024-12-17 · NCDOT · C205005 · $125.00 per SY · qty 200.0 · bid tab
storm pipe 15-inchLF4$78.25$56.40 to $84.20
Bids
  • 2025-05-20 · NCDOT · C205032 · $76.50 per LF · qty 8184.0 · bid tab
  • 2025-03-18 · NCDOT · C204933 · $56.40 per LF · qty 6232.0 · bid tab
  • 2025-03-18 · NCDOT · C204933 · $84.20 per LF · qty 268.0 · bid tab
  • 2024-04-16 · NCDOT · C204922 · $80.00 per LF · qty 2188.0 · bid tab
storm pipe 18-inchLF4$82.80$67.90 to $95.00
Bids
  • 2025-05-20 · NCDOT · C205032 · $88.00 per LF · qty 11372.0 · bid tab
  • 2025-03-18 · NCDOT · C204933 · $77.60 per LF · qty 892.0 · bid tab
  • 2025-03-18 · NCDOT · C204933 · $67.90 per LF · qty 2296.0 · bid tab
  • 2024-04-16 · NCDOT · C204922 · $95.00 per LF · qty 396.0 · bid tab
storm pipe 24-inchLF4$125.00$95.60 to $150.00
Bids
  • 2025-05-20 · NCDOT · C205032 · $122.00 per LF · qty 3744.0 · bid tab
  • 2025-03-18 · NCDOT · C204933 · $95.60 per LF · qty 304.0 · bid tab
  • 2024-04-16 · NCDOT · C204922 · $128.00 per LF · qty 116.0 · bid tab
  • 2024-04-16 · NCDOT · C204922 · $150.00 per LF · qty 160.0 · bid tab
storm pipe 30-inchLF3$164.00$133.00 to $180.00
Bids
  • 2025-05-20 · NCDOT · C205032 · $164.00 per LF · qty 1436.0 · bid tab
  • 2025-03-18 · NCDOT · C204933 · $133.00 per LF · qty 248.0 · bid tab
  • 2024-04-16 · NCDOT · C204922 · $180.00 per LF · qty 192.0 · bid tab
storm pipe 36-inchLF2$194.05$174.10 to $214.00
Bids
  • 2025-05-20 · NCDOT · C205032 · $214.00 per LF · qty 264.0 · bid tab
  • 2025-03-18 · NCDOT · C204933 · $174.10 per LF · qty 372.0 · bid tab
storm pipe 42-inchLF1$290.00$290.00 to $290.00
Bids
  • 2025-05-20 · NCDOT · C205032 · $290.00 per LF · qty 112.0 · bid tab
storm pipe 48-inchLF1$300.00$300.00 to $300.00
Bids
  • 2025-05-20 · NCDOT · C205032 · $300.00 per LF · qty 428.0 · bid tab
storm pipe 54-inchLF1$338.00$338.00 to $338.00
Bids
  • 2025-03-18 · NCDOT · C204933 · $338.00 per LF · qty 120.0 · bid tab
water main 10-inchLF1$360.00$360.00 to $360.00
Bids
  • 2024-04-16 · NCDOT · C204922 · $360.00 per LF · qty 91.0 · bid tab
water main 12-inchLF3$116.00$109.00 to $150.00
Bids
  • 2025-05-20 · NCDOT · C205032 · $109.00 per LF · qty 9512.0 · bid tab
  • 2025-03-18 · NCDOT · C204933 · $116.00 per LF · qty 986.0 · bid tab
  • 2024-04-16 · NCDOT · C204922 · $150.00 per LF · qty 1469.0 · bid tab
water main 16-inchLF2$177.00$94.00 to $260.00
Bids
  • 2025-05-20 · NCDOT · C205032 · $94.00 per LF · qty 588.0 · bid tab
  • 2024-04-16 · NCDOT · C204922 · $260.00 per LF · qty 594.0 · bid tab
water main 6-inchLF2$227.50$100.00 to $355.00
Bids
  • 2025-05-20 · NCDOT · C205032 · $355.00 per LF · qty 32.0 · bid tab
  • 2024-04-16 · NCDOT · C204922 · $100.00 per LF · qty 1267.0 · bid tab
water main 8-inchLF1$165.00$165.00 to $165.00
Bids
  • 2025-05-20 · NCDOT · C205032 · $165.00 per LF · qty 400.0 · bid tab
water serviceLF1$70.00$70.00 to $70.00
Bids
  • 2025-05-20 · NCDOT · C205032 · $70.00 per LF · qty 92.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.