| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 5 | $700.00 | $578.00 to $850.00 | Bids- 2026-08-18 · NCDOT · C205195 · $850.00 per TON · qty 1145.0 · bid tab
- 2026-02-17 · NCDOT · C205171 · $625.00 per TON · qty 1488.0 · bid tab
- 2025-05-20 · NCDOT · C205043 · $750.00 per TON · qty 425.0 · bid tab
- 2025-02-18 · NCDOT · C205048 · $700.00 per TON · qty 1734.0 · bid tab
- 2024-02-20 · NCDOT · C204919 · $578.00 per TON · qty 1815.0 · bid tab
|
| curb gutter | LF | 3 | $47.00 | $44.00 to $50.30 | Bids- 2026-08-18 · NCDOT · C205195 · $44.00 per LF · qty 3470.0 · bid tab
- 2025-05-20 · NCDOT · C205043 · $50.30 per LF · qty 3400.0 · bid tab
- 2025-05-20 · NCDOT · C205043 · $47.00 per LF · qty 750.0 · bid tab
|
| excavation embankment | CY | 1 | $12.00 | $12.00 to $12.00 | Bids- 2026-08-18 · NCDOT · C205195 · $12.00 per CY · qty 47200.0 · bid tab
|
| flexible base | TON | 1 | $60.00 | $60.00 to $60.00 | Bids- 2026-08-18 · NCDOT · C205195 · $60.00 per TON · qty 1901.0 · bid tab
|
| inlet headwall | EA | 2 | $1,600.00 | $1,500.00 to $1,700.00 | Bids- 2026-08-18 · NCDOT · C205195 · $1,500.00 per EA · qty 6.0 · bid tab
- 2025-05-20 · NCDOT · C205043 · $1,700.00 per EA · qty 12.0 · bid tab
|
| lime cement stabilization | SY | 3 | $5.00 | $5.00 to $5.50 | Bids- 2026-08-18 · NCDOT · C205195 · $5.00 per SY · qty 100.0 · bid tab
- 2026-08-18 · NCDOT · C205195 · $5.00 per SY · qty 2800.0 · bid tab
- 2025-05-20 · NCDOT · C205043 · $5.50 per SY · qty 1300.0 · bid tab
|
| lime cement stabilization | TON | 4 | $75.00 | $55.00 to $100.00 | Bids- 2026-08-18 · NCDOT · C205195 · $55.00 per TON · qty 250.0 · bid tab
- 2026-08-18 · NCDOT · C205195 · $55.00 per TON · qty 1200.0 · bid tab
- 2025-05-20 · NCDOT · C205043 · $100.00 per TON · qty 50.0 · bid tab
- 2025-05-20 · NCDOT · C205043 · $95.00 per TON · qty 600.0 · bid tab
|
| manhole | EA | 13 | $1,450.00 | $400.00 to $10,300.00 | Bids- 2026-08-18 · NCDOT · C205195 · $1,994.06 per EA · qty 6.0 · bid tab
- 2026-08-18 · NCDOT · C205195 · $2,848.65 per EA · qty 3.0 · bid tab
- 2026-02-17 · NCDOT · C205171 · $1,475.00 per EA · qty 186.0 · bid tab
- 2026-02-17 · NCDOT · C205171 · $450.00 per EA · qty 1.0 · bid tab
- 2026-02-17 · NCDOT · C205171 · $1,600.00 per EA · qty 8.0 · bid tab
- 2025-05-20 · NCDOT · C205043 · $825.00 per EA · qty 2.0 · bid tab
- 2025-05-20 · NCDOT · C205043 · $475.00 per EA · qty 18.0 · bid tab
- 2025-05-20 · NCDOT · C205043 · $10,300.00 per EA · qty 11.0 · bid tab
- 2025-02-18 · NCDOT · C205048 · $500.00 per EA · qty 2.0 · bid tab
- 2025-02-18 · NCDOT · C205048 · $1,450.00 per EA · qty 26.0 · bid tab
(10 most recent of 13 shown; all in the Hubstake feed) |
| sewer main 8-inch | LF | 1 | $225.00 | $225.00 to $225.00 | Bids- 2025-05-20 · NCDOT · C205043 · $225.00 per LF · qty 1575.0 · bid tab
|
| sidewalk | EA | 3 | $3,000.00 | $1,500.00 to $6,000.00 | Bids- 2026-08-18 · NCDOT · C205195 · $3,000.00 per EA · qty 20.0 · bid tab
- 2025-05-20 · NCDOT · C205043 · $6,000.00 per EA · qty 24.0 · bid tab
- 2024-02-20 · NCDOT · C204919 · $1,500.00 per EA · qty 2.0 · bid tab
|
| sidewalk | SY | 3 | $106.00 | $90.00 to $125.00 | Bids- 2026-08-18 · NCDOT · C205195 · $90.00 per SY · qty 900.0 · bid tab
- 2025-05-20 · NCDOT · C205043 · $106.00 per SY · qty 1470.0 · bid tab
- 2025-05-20 · NCDOT · C205043 · $125.00 per SY · qty 240.0 · bid tab
|
| storm pipe 15-inch | LF | 3 | $90.00 | $70.00 to $190.00 | Bids- 2026-08-18 · NCDOT · C205195 · $70.00 per LF · qty 1080.0 · bid tab
- 2026-08-18 · NCDOT · C205195 · $90.00 per LF · qty 552.0 · bid tab
- 2025-05-20 · NCDOT · C205043 · $190.00 per LF · qty 1832.0 · bid tab
|
| storm pipe 18-inch | LF | 3 | $95.00 | $85.00 to $200.00 | Bids- 2026-08-18 · NCDOT · C205195 · $95.00 per LF · qty 556.0 · bid tab
- 2026-08-18 · NCDOT · C205195 · $85.00 per LF · qty 96.0 · bid tab
- 2025-05-20 · NCDOT · C205043 · $200.00 per LF · qty 308.0 · bid tab
|
| storm pipe 24-inch | LF | 3 | $120.00 | $100.00 to $300.00 | Bids- 2026-08-18 · NCDOT · C205195 · $100.00 per LF · qty 340.0 · bid tab
- 2026-08-18 · NCDOT · C205195 · $120.00 per LF · qty 824.0 · bid tab
- 2025-05-20 · NCDOT · C205043 · $300.00 per LF · qty 184.0 · bid tab
|
| storm pipe 30-inch | LF | 2 | $145.00 | $140.00 to $150.00 | Bids- 2026-08-18 · NCDOT · C205195 · $150.00 per LF · qty 64.0 · bid tab
- 2026-08-18 · NCDOT · C205195 · $140.00 per LF · qty 84.0 · bid tab
|
| storm pipe 48-inch | LF | 1 | $295.00 | $295.00 to $295.00 | Bids- 2026-08-18 · NCDOT · C205195 · $295.00 per LF · qty 120.0 · bid tab
|
| water main 10-inch | LF | 1 | $300.00 | $300.00 to $300.00 | Bids- 2025-05-20 · NCDOT · C205043 · $300.00 per LF · qty 450.0 · bid tab
|
| water main 12-inch | LF | 1 | $350.00 | $350.00 to $350.00 | Bids- 2025-05-20 · NCDOT · C205043 · $350.00 per LF · qty 1462.0 · bid tab
|
| water main 16-inch | LF | 1 | $500.00 | $500.00 to $500.00 | Bids- 2025-05-20 · NCDOT · C205043 · $500.00 per LF · qty 397.0 · bid tab
|
| water main 6-inch | LF | 1 | $250.00 | $250.00 to $250.00 | Bids- 2025-05-20 · NCDOT · C205043 · $250.00 per LF · qty 394.0 · bid tab
|
| water service | LF | 1 | $105.00 | $105.00 to $105.00 | Bids- 2025-05-20 · NCDOT · C205043 · $105.00 per LF · qty 120.0 · bid tab
|