Site-work prices, Caldwell County, NC

Winning-bid unit prices from public bid tabs, last 36 months, from Hubstake. Median and range across all winning line items; each bid links to the agency's own bid tab. Unit prices are per the unit printed on the tab; thickness, class and spec can differ within a category, so use the range, not just the median.

CategoryUnitWinning itemsMedianRangeReceipts
asphalt pavementTON3$960.00$740.00 to $1,065.00
Bids
  • 2026-09-15 · NCDOT · C204947 · $1,065.00 per TON · qty 2285.0 · bid tab
  • 2025-10-21 · NCDOT · C204840 · $960.00 per TON · qty 1410.0 · bid tab
  • 2024-05-28 · NCDOT · C204844 · $740.00 per TON · qty 430.0 · bid tab
curb gutterLF9$56.00$30.00 to $105.00
Bids
  • 2026-09-15 · NCDOT · C204947 · $51.50 per LF · qty 6100.0 · bid tab
  • 2026-09-15 · NCDOT · C204947 · $60.75 per LF · qty 2600.0 · bid tab
  • 2026-09-15 · NCDOT · C204947 · $58.00 per LF · qty 330.0 · bid tab
  • 2025-10-21 · NCDOT · C204840 · $105.00 per LF · qty 72.0 · bid tab
  • 2025-10-21 · NCDOT · C204840 · $30.00 per LF · qty 2830.0 · bid tab
  • 2025-10-21 · NCDOT · C204840 · $56.00 per LF · qty 370.0 · bid tab
  • 2024-05-28 · NCDOT · C204844 · $44.00 per LF · qty 8220.0 · bid tab
  • 2024-05-28 · NCDOT · C204844 · $46.00 per LF · qty 370.0 · bid tab
  • 2024-05-28 · NCDOT · C204844 · $58.00 per LF · qty 185.0 · bid tab
fire hydrantEA2$8,184.50$6,500.00 to $9,869.00
Bids
  • 2026-09-15 · NCDOT · C204947 · $9,869.00 per EA · qty 8.0 · bid tab
  • 2025-10-21 · NCDOT · C204840 · $6,500.00 per EA · qty 2.0 · bid tab
fire hydrantLF3$120.00$76.00 to $153.00
Bids
  • 2026-09-15 · NCDOT · C204947 · $153.00 per LF · qty 159.0 · bid tab
  • 2025-10-21 · NCDOT · C204840 · $76.00 per LF · qty 32.0 · bid tab
  • 2024-05-28 · NCDOT · C204844 · $120.00 per LF · qty 40.0 · bid tab
flexible baseTON2$67.75$59.00 to $76.50
Bids
  • 2025-10-21 · NCDOT · C204840 · $76.50 per TON · qty 145.0 · bid tab
  • 2024-05-28 · NCDOT · C204844 · $59.00 per TON · qty 1000.0 · bid tab
inlet headwallEA3$2,105.00$2,100.00 to $2,108.00
Bids
  • 2026-09-15 · NCDOT · C204947 · $2,105.00 per EA · qty 10.0 · bid tab
  • 2025-10-21 · NCDOT · C204840 · $2,108.00 per EA · qty 11.0 · bid tab
  • 2024-05-28 · NCDOT · C204844 · $2,100.00 per EA · qty 1.0 · bid tab
lime cement stabilizationSY6$4.00$3.30 to $6.80
Bids
  • 2026-09-15 · NCDOT · C204947 · $3.80 per SY · qty 3000.0 · bid tab
  • 2026-09-15 · NCDOT · C204947 · $5.70 per SY · qty 900.0 · bid tab
  • 2025-10-21 · NCDOT · C204840 · $3.30 per SY · qty 5005.0 · bid tab
  • 2025-10-21 · NCDOT · C204840 · $4.00 per SY · qty 1680.0 · bid tab
  • 2024-05-28 · NCDOT · C204844 · $6.80 per SY · qty 2100.0 · bid tab
  • 2024-05-28 · NCDOT · C204844 · $4.00 per SY · qty 600.0 · bid tab
lime cement stabilizationTON3$62.50$58.00 to $70.00
Bids
  • 2026-09-15 · NCDOT · C204947 · $62.50 per TON · qty 600.0 · bid tab
  • 2025-10-21 · NCDOT · C204840 · $70.00 per TON · qty 1120.0 · bid tab
  • 2024-05-28 · NCDOT · C204844 · $58.00 per TON · qty 1400.0 · bid tab
manholeEA12$1,927.50$187.00 to $20,800.00
Bids
  • 2026-09-15 · NCDOT · C204947 · $7,357.00 per EA · qty 21.0 · bid tab
  • 2026-09-15 · NCDOT · C204947 · $1,910.00 per EA · qty 8.0 · bid tab
  • 2026-09-15 · NCDOT · C204947 · $187.00 per EA · qty 1.0 · bid tab
  • 2026-09-15 · NCDOT · C204947 · $1,011.00 per EA · qty 52.0 · bid tab
  • 2025-10-21 · NCDOT · C204840 · $1,035.00 per EA · qty 27.0 · bid tab
  • 2025-10-21 · NCDOT · C204840 · $1,945.00 per EA · qty 4.0 · bid tab
  • 2025-10-21 · NCDOT · C204840 · $3,365.00 per EA · qty 5.0 · bid tab
  • 2025-10-21 · NCDOT · C204840 · $1,880.00 per EA · qty 5.0 · bid tab
  • 2024-05-28 · NCDOT · C204844 · $7,800.00 per EA · qty 21.0 · bid tab
  • 2024-05-28 · NCDOT · C204844 · $980.00 per EA · qty 8.0 · bid tab
(10 most recent of 12 shown; all in the Hubstake feed)
sewer main 8-inchLF3$163.00$73.00 to $300.00
Bids
  • 2026-09-15 · NCDOT · C204947 · $163.00 per LF · qty 3880.0 · bid tab
  • 2025-10-21 · NCDOT · C204840 · $73.00 per LF · qty 753.0 · bid tab
  • 2024-05-28 · NCDOT · C204844 · $300.00 per LF · qty 3282.0 · bid tab
sewer serviceLF1$110.00$110.00 to $110.00
Bids
  • 2024-05-28 · NCDOT · C204844 · $110.00 per LF · qty 453.0 · bid tab
sidewalkEA2$4,216.50$3,500.00 to $4,933.00
Bids
  • 2026-09-15 · NCDOT · C204947 · $4,933.00 per EA · qty 26.0 · bid tab
  • 2024-05-28 · NCDOT · C204844 · $3,500.00 per EA · qty 26.0 · bid tab
sidewalkSY3$95.00$70.00 to $98.00
Bids
  • 2026-09-15 · NCDOT · C204947 · $98.00 per SY · qty 1310.0 · bid tab
  • 2024-05-28 · NCDOT · C204844 · $95.00 per SY · qty 1000.0 · bid tab
  • 2024-05-28 · NCDOT · C204844 · $70.00 per SY · qty 2940.0 · bid tab
storm pipe 15-inchLF3$100.00$83.00 to $179.00
Bids
  • 2026-09-15 · NCDOT · C204947 · $179.00 per LF · qty 2816.0 · bid tab
  • 2025-10-21 · NCDOT · C204840 · $83.00 per LF · qty 1508.0 · bid tab
  • 2024-05-28 · NCDOT · C204844 · $100.00 per LF · qty 3432.0 · bid tab
storm pipe 18-inchLF4$125.00$95.00 to $189.00
Bids
  • 2026-09-15 · NCDOT · C204947 · $189.00 per LF · qty 1596.0 · bid tab
  • 2025-10-21 · NCDOT · C204840 · $95.00 per LF · qty 348.0 · bid tab
  • 2024-05-28 · NCDOT · C204844 · $140.00 per LF · qty 32.0 · bid tab
  • 2024-05-28 · NCDOT · C204844 · $110.00 per LF · qty 1268.0 · bid tab
storm pipe 24-inchLF3$180.00$124.00 to $249.00
Bids
  • 2026-09-15 · NCDOT · C204947 · $249.00 per LF · qty 1144.0 · bid tab
  • 2025-10-21 · NCDOT · C204840 · $124.00 per LF · qty 852.0 · bid tab
  • 2024-05-28 · NCDOT · C204844 · $180.00 per LF · qty 268.0 · bid tab
storm pipe 30-inchLF2$204.50$202.00 to $207.00
Bids
  • 2026-09-15 · NCDOT · C204947 · $202.00 per LF · qty 116.0 · bid tab
  • 2025-10-21 · NCDOT · C204840 · $207.00 per LF · qty 344.0 · bid tab
storm pipe 42-inchLF1$330.00$330.00 to $330.00
Bids
  • 2026-09-15 · NCDOT · C204947 · $330.00 per LF · qty 40.0 · bid tab
storm pipe 66-inchLF1$958.00$958.00 to $958.00
Bids
  • 2026-09-15 · NCDOT · C204947 · $958.00 per LF · qty 52.0 · bid tab
water main 10-inchLF2$101.75$43.50 to $160.00
Bids
  • 2026-09-15 · NCDOT · C204947 · $43.50 per LF · qty 425.0 · bid tab
  • 2024-05-28 · NCDOT · C204844 · $160.00 per LF · qty 910.0 · bid tab
water main 12-inchLF3$161.00$130.50 to $170.00
Bids
  • 2026-09-15 · NCDOT · C204947 · $161.00 per LF · qty 3042.0 · bid tab
  • 2025-10-21 · NCDOT · C204840 · $130.50 per LF · qty 2970.0 · bid tab
  • 2024-05-28 · NCDOT · C204844 · $170.00 per LF · qty 2674.0 · bid tab
water main 16-inchLF2$115.25$88.50 to $142.00
Bids
  • 2026-09-15 · NCDOT · C204947 · $88.50 per LF · qty 574.0 · bid tab
  • 2025-10-21 · NCDOT · C204840 · $142.00 per LF · qty 140.0 · bid tab
water main 4-inchLF1$45.00$45.00 to $45.00
Bids
  • 2025-10-21 · NCDOT · C204840 · $45.00 per LF · qty 219.0 · bid tab
water main 6-inchLF3$73.50$58.00 to $120.00
Bids
  • 2026-09-15 · NCDOT · C204947 · $73.50 per LF · qty 640.0 · bid tab
  • 2025-10-21 · NCDOT · C204840 · $58.00 per LF · qty 24.0 · bid tab
  • 2024-05-28 · NCDOT · C204844 · $120.00 per LF · qty 177.0 · bid tab
water main 8-inchLF3$96.00$73.75 to $140.00
Bids
  • 2026-09-15 · NCDOT · C204947 · $96.00 per LF · qty 3346.0 · bid tab
  • 2025-10-21 · NCDOT · C204840 · $73.75 per LF · qty 1465.0 · bid tab
  • 2024-05-28 · NCDOT · C204844 · $140.00 per LF · qty 1101.0 · bid tab
water serviceLF4$104.75$82.00 to $166.00
Bids
  • 2026-09-15 · NCDOT · C204947 · $88.50 per LF · qty 620.0 · bid tab
  • 2026-09-15 · NCDOT · C204947 · $166.00 per LF · qty 11.0 · bid tab
  • 2025-10-21 · NCDOT · C204840 · $121.00 per LF · qty 33.0 · bid tab
  • 2024-05-28 · NCDOT · C204844 · $82.00 per LF · qty 1050.0 · bid tab

Source file sitework_prices.csv, sha256 60519bdd47f6. Engineer's estimates are excluded. Not a quote.