| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 2 | $655.00 | $645.00 to $665.00 | Bids- 2026-01-20 · NCDOT · C205117 · $665.00 per TON · qty 1050.0 · bid tab
- 2024-12-17 · NCDOT · C204384 · $645.00 per TON · qty 185.0 · bid tab
|
| curb gutter | LF | 5 | $41.98 | $30.25 to $81.36 | Bids- 2026-01-20 · NCDOT · C205117 · $35.08 per LF · qty 640.0 · bid tab
- 2026-01-20 · NCDOT · C205117 · $81.36 per LF · qty 50.0 · bid tab
- 2026-01-20 · NCDOT · C205117 · $41.98 per LF · qty 7650.0 · bid tab
- 2026-01-20 · NCDOT · C205117 · $43.70 per LF · qty 3170.0 · bid tab
- 2024-12-17 · NCDOT · C204384 · $30.25 per LF · qty 1860.0 · bid tab
|
| excavation embankment | CY | 3 | $16.96 | $13.40 to $28.51 | Bids- 2026-01-20 · NCDOT · C205117 · $13.40 per CY · qty 38200.0 · bid tab
- 2026-01-20 · NCDOT · C205117 · $28.51 per CY · qty 5200.0 · bid tab
- 2024-12-17 · NCDOT · C204384 · $16.96 per CY · qty 21300.0 · bid tab
|
| fire hydrant | EA | 1 | $12,172.75 | $12,172.75 to $12,172.75 | Bids- 2026-01-20 · NCDOT · C205117 · $12,172.75 per EA · qty 5.0 · bid tab
|
| fire hydrant | LF | 1 | $230.00 | $230.00 to $230.00 | Bids- 2026-01-20 · NCDOT · C205117 · $230.00 per LF · qty 63.0 · bid tab
|
| flexible base | TON | 1 | $52.00 | $52.00 to $52.00 | Bids- 2026-01-20 · NCDOT · C205117 · $52.00 per TON · qty 5045.0 · bid tab
|
| inlet headwall | EA | 1 | $4,688.34 | $4,688.34 to $4,688.34 | Bids- 2026-01-20 · NCDOT · C205117 · $4,688.34 per EA · qty 29.0 · bid tab
|
| lime cement stabilization | SY | 5 | $4.00 | $3.00 to $4.03 | Bids- 2026-01-20 · NCDOT · C205117 · $4.03 per SY · qty 7810.0 · bid tab
- 2026-01-20 · NCDOT · C205117 · $4.00 per SY · qty 1500.0 · bid tab
- 2026-01-20 · NCDOT · C205117 · $4.00 per SY · qty 2719.0 · bid tab
- 2024-12-17 · NCDOT · C204384 · $4.00 per SY · qty 300.0 · bid tab
- 2024-12-17 · NCDOT · C204384 · $3.00 per SY · qty 900.0 · bid tab
|
| lime cement stabilization | TON | 4 | $55.00 | $50.00 to $358.40 | Bids- 2026-01-20 · NCDOT · C205117 · $55.00 per TON · qty 415.0 · bid tab
- 2026-01-20 · NCDOT · C205117 · $358.40 per TON · qty 100.0 · bid tab
- 2026-01-20 · NCDOT · C205117 · $55.00 per TON · qty 350.0 · bid tab
- 2024-12-17 · NCDOT · C204384 · $50.00 per TON · qty 200.0 · bid tab
|
| manhole | EA | 4 | $1,868.75 | $1,092.50 to $10,062.50 | Bids- 2026-01-20 · NCDOT · C205117 · $1,437.50 per EA · qty 2.0 · bid tab
- 2026-01-20 · NCDOT · C205117 · $2,300.00 per EA · qty 5.0 · bid tab
- 2026-01-20 · NCDOT · C205117 · $10,062.50 per EA · qty 4.0 · bid tab
- 2026-01-20 · NCDOT · C205117 · $1,092.50 per EA · qty 9.0 · bid tab
|
| sewer main 8-inch | LF | 1 | $270.25 | $270.25 to $270.25 | Bids- 2026-01-20 · NCDOT · C205117 · $270.25 per LF · qty 477.0 · bid tab
|
| sidewalk | EA | 2 | $2,992.50 | $2,420.00 to $3,565.00 | Bids- 2026-01-20 · NCDOT · C205117 · $3,565.00 per EA · qty 20.0 · bid tab
- 2024-12-17 · NCDOT · C204384 · $2,420.00 per EA · qty 4.0 · bid tab
|
| sidewalk | SY | 3 | $83.38 | $66.55 to $170.78 | Bids- 2026-01-20 · NCDOT · C205117 · $170.78 per SY · qty 140.0 · bid tab
- 2026-01-20 · NCDOT · C205117 · $83.38 per SY · qty 5310.0 · bid tab
- 2024-12-17 · NCDOT · C204384 · $66.55 per SY · qty 970.0 · bid tab
|
| storm pipe 12-inch | LF | 1 | $140.00 | $140.00 to $140.00 | Bids- 2026-01-20 · NCDOT · C205117 · $140.00 per LF · qty 264.0 · bid tab
|
| storm pipe 15-inch | LF | 3 | $140.00 | $135.00 to $185.00 | Bids- 2026-01-20 · NCDOT · C205117 · $140.00 per LF · qty 752.0 · bid tab
- 2026-01-20 · NCDOT · C205117 · $135.00 per LF · qty 3656.0 · bid tab
- 2024-12-17 · NCDOT · C204384 · $185.00 per LF · qty 496.0 · bid tab
|
| storm pipe 18-inch | LF | 3 | $165.00 | $155.00 to $235.00 | Bids- 2026-01-20 · NCDOT · C205117 · $155.00 per LF · qty 1646.0 · bid tab
- 2026-01-20 · NCDOT · C205117 · $165.00 per LF · qty 240.0 · bid tab
- 2024-12-17 · NCDOT · C204384 · $235.00 per LF · qty 288.0 · bid tab
|
| storm pipe 24-inch | LF | 2 | $220.00 | $185.00 to $255.00 | Bids- 2026-01-20 · NCDOT · C205117 · $255.00 per LF · qty 104.0 · bid tab
- 2026-01-20 · NCDOT · C205117 · $185.00 per LF · qty 612.0 · bid tab
|
| storm pipe 30-inch | LF | 2 | $282.50 | $240.00 to $325.00 | Bids- 2026-01-20 · NCDOT · C205117 · $240.00 per LF · qty 468.0 · bid tab
- 2026-01-20 · NCDOT · C205117 · $325.00 per LF · qty 40.0 · bid tab
|
| storm pipe 36-inch | LF | 1 | $395.00 | $395.00 to $395.00 | Bids- 2026-01-20 · NCDOT · C205117 · $395.00 per LF · qty 240.0 · bid tab
|
| storm pipe 48-inch | LF | 1 | $500.00 | $500.00 to $500.00 | Bids- 2026-01-20 · NCDOT · C205117 · $500.00 per LF · qty 140.0 · bid tab
|
| water main 12-inch | LF | 1 | $258.75 | $258.75 to $258.75 | Bids- 2026-01-20 · NCDOT · C205117 · $258.75 per LF · qty 1792.0 · bid tab
|
| water main 16-inch | LF | 1 | $373.75 | $373.75 to $373.75 | Bids- 2026-01-20 · NCDOT · C205117 · $373.75 per LF · qty 441.0 · bid tab
|
| water main 6-inch | LF | 1 | $143.75 | $143.75 to $143.75 | Bids- 2026-01-20 · NCDOT · C205117 · $143.75 per LF · qty 105.0 · bid tab
|
| water service | LF | 1 | $143.75 | $143.75 to $143.75 | Bids- 2026-01-20 · NCDOT · C205117 · $143.75 per LF · qty 144.0 · bid tab
|