| Category | Unit | Winning items | Median | Range | Receipts |
|---|
| asphalt pavement | TON | 6 | $581.50 | $400.00 to $700.00 | Bids- 2026-06-16 · NCDOT · C204970 · $700.00 per TON · qty 1220.0 · bid tab
- 2026-05-19 · NCDOT · C205199 · $630.00 per TON · qty 1862.0 · bid tab
- 2025-07-15 · NCDOT · C205073 · $563.00 per TON · qty 1730.0 · bid tab
- 2025-06-17 · NCDOT · C205109 · $400.00 per TON · qty 1916.0 · bid tab
- 2024-09-17 · NCDOT · C204914 · $600.00 per TON · qty 280.0 · bid tab
- 2024-06-18 · NCDOT · C204964 · $425.00 per TON · qty 1690.0 · bid tab
|
| curb gutter | LF | 2 | $35.00 | $30.00 to $40.00 | Bids- 2025-07-15 · NCDOT · C205073 · $40.00 per LF · qty 1210.0 · bid tab
- 2025-07-15 · NCDOT · C205073 · $30.00 per LF · qty 7600.0 · bid tab
|
| excavation embankment | CY | 7 | $22.60 | $9.00 to $50.00 | Bids- 2026-06-16 · NCDOT · C204970 · $9.00 per CY · qty 11300.0 · bid tab
- 2026-06-16 · NCDOT · C204970 · $18.00 per CY · qty 59100.0 · bid tab
- 2026-05-19 · NCDOT · C205199 · $31.30 per CY · qty 2036.0 · bid tab
- 2025-07-15 · NCDOT · C205073 · $50.00 per CY · qty 28000.0 · bid tab
- 2025-07-15 · NCDOT · C205073 · $32.00 per CY · qty 14000.0 · bid tab
- 2025-06-17 · NCDOT · C205109 · $22.00 per CY · qty 3171.0 · bid tab
- 2024-06-18 · NCDOT · C204964 · $22.60 per CY · qty 1651.0 · bid tab
|
| fire hydrant | EA | 1 | $9,800.00 | $9,800.00 to $9,800.00 | Bids- 2025-07-15 · NCDOT · C205073 · $9,800.00 per EA · qty 3.0 · bid tab
|
| fire hydrant | LF | 1 | $80.00 | $80.00 to $80.00 | Bids- 2025-07-15 · NCDOT · C205073 · $80.00 per LF · qty 64.0 · bid tab
|
| flexible base | TON | 4 | $96.00 | $59.80 to $128.00 | Bids- 2026-06-16 · NCDOT · C204970 · $128.00 per TON · qty 33.0 · bid tab
- 2026-05-19 · NCDOT · C205199 · $87.00 per TON · qty 696.0 · bid tab
- 2025-07-15 · NCDOT · C205073 · $105.00 per TON · qty 46.0 · bid tab
- 2024-09-17 · NCDOT · C204914 · $59.80 per TON · qty 35.0 · bid tab
|
| inlet headwall | EA | 3 | $1,345.00 | $1,250.00 to $17,250.00 | Bids- 2026-06-16 · NCDOT · C204970 · $1,250.00 per EA · qty 2.0 · bid tab
- 2025-07-15 · NCDOT · C205073 · $1,345.00 per EA · qty 59.0 · bid tab
- 2024-09-17 · NCDOT · C204914 · $17,250.00 per EA · qty 2.0 · bid tab
|
| lime cement stabilization | SY | 4 | $3.65 | $1.40 to $5.00 | Bids- 2026-06-16 · NCDOT · C204970 · $1.40 per SY · qty 800.0 · bid tab
- 2025-07-15 · NCDOT · C205073 · $5.00 per SY · qty 2000.0 · bid tab
- 2025-07-15 · NCDOT · C205073 · $5.00 per SY · qty 2565.0 · bid tab
- 2024-09-17 · NCDOT · C204914 · $2.30 per SY · qty 800.0 · bid tab
|
| lime cement stabilization | TON | 3 | $90.00 | $74.00 to $90.00 | Bids- 2026-06-16 · NCDOT · C204970 · $74.00 per TON · qty 250.0 · bid tab
- 2025-07-15 · NCDOT · C205073 · $90.00 per TON · qty 1675.0 · bid tab
- 2025-07-15 · NCDOT · C205073 · $90.00 per TON · qty 500.0 · bid tab
|
| manhole | EA | 7 | $1,000.00 | $520.00 to $2,200.00 | Bids- 2026-06-16 · NCDOT · C204970 · $520.00 per EA · qty 8.0 · bid tab
- 2026-05-19 · NCDOT · C205199 · $1,000.00 per EA · qty 4.0 · bid tab
- 2025-07-15 · NCDOT · C205073 · $820.00 per EA · qty 61.0 · bid tab
- 2025-07-15 · NCDOT · C205073 · $1,800.00 per EA · qty 6.0 · bid tab
- 2025-07-15 · NCDOT · C205073 · $2,200.00 per EA · qty 8.0 · bid tab
- 2025-06-17 · NCDOT · C205109 · $800.00 per EA · qty 3.0 · bid tab
- 2024-06-18 · NCDOT · C204964 · $2,000.00 per EA · qty 1.0 · bid tab
|
| sidewalk | EA | 1 | $2,350.00 | $2,350.00 to $2,350.00 | Bids- 2025-07-15 · NCDOT · C205073 · $2,350.00 per EA · qty 3.0 · bid tab
|
| sidewalk | SY | 2 | $71.50 | $55.00 to $88.00 | Bids- 2025-07-15 · NCDOT · C205073 · $88.00 per SY · qty 100.0 · bid tab
- 2025-07-15 · NCDOT · C205073 · $55.00 per SY · qty 450.0 · bid tab
|
| storm pipe 15-inch | LF | 2 | $98.53 | $97.00 to $100.05 | Bids- 2025-07-15 · NCDOT · C205073 · $97.00 per LF · qty 3416.0 · bid tab
- 2024-09-17 · NCDOT · C204914 · $100.05 per LF · qty 112.0 · bid tab
|
| storm pipe 18-inch | LF | 4 | $128.45 | $115.00 to $217.00 | Bids- 2026-06-16 · NCDOT · C204970 · $135.00 per LF · qty 332.0 · bid tab
- 2026-06-16 · NCDOT · C204970 · $217.00 per LF · qty 12.0 · bid tab
- 2025-07-15 · NCDOT · C205073 · $115.00 per LF · qty 2092.0 · bid tab
- 2024-09-17 · NCDOT · C204914 · $121.90 per LF · qty 104.0 · bid tab
|
| storm pipe 24-inch | LF | 2 | $143.50 | $132.00 to $155.00 | Bids- 2026-06-16 · NCDOT · C204970 · $132.00 per LF · qty 284.0 · bid tab
- 2025-07-15 · NCDOT · C205073 · $155.00 per LF · qty 636.0 · bid tab
|
| storm pipe 30-inch | LF | 2 | $187.50 | $175.00 to $200.00 | Bids- 2026-06-16 · NCDOT · C204970 · $175.00 per LF · qty 128.0 · bid tab
- 2025-07-15 · NCDOT · C205073 · $200.00 per LF · qty 372.0 · bid tab
|
| storm pipe 36-inch | LF | 1 | $265.00 | $265.00 to $265.00 | Bids- 2025-07-15 · NCDOT · C205073 · $265.00 per LF · qty 336.0 · bid tab
|
| storm pipe 42-inch | LF | 2 | $306.50 | $288.00 to $325.00 | Bids- 2026-06-16 · NCDOT · C204970 · $288.00 per LF · qty 76.0 · bid tab
- 2025-07-15 · NCDOT · C205073 · $325.00 per LF · qty 84.0 · bid tab
|
| storm pipe 48-inch | LF | 2 | $367.50 | $350.00 to $385.00 | Bids- 2026-06-16 · NCDOT · C204970 · $350.00 per LF · qty 100.0 · bid tab
- 2025-07-15 · NCDOT · C205073 · $385.00 per LF · qty 124.0 · bid tab
|
| storm pipe 54-inch | LF | 1 | $447.00 | $447.00 to $447.00 | Bids- 2026-06-16 · NCDOT · C204970 · $447.00 per LF · qty 128.0 · bid tab
|
| storm pipe 66-inch | LF | 1 | $713.00 | $713.00 to $713.00 | Bids- 2026-06-16 · NCDOT · C204970 · $713.00 per LF · qty 64.0 · bid tab
|
| storm pipe 73-inch | LF | 1 | $771.00 | $771.00 to $771.00 | Bids- 2026-06-16 · NCDOT · C204970 · $771.00 per LF · qty 64.0 · bid tab
|
| storm pipe 84-inch | LF | 1 | $920.00 | $920.00 to $920.00 | Bids- 2024-09-17 · NCDOT · C204914 · $920.00 per LF · qty 59.0 · bid tab
|
| water main 12-inch | LF | 1 | $250.00 | $250.00 to $250.00 | Bids- 2025-07-15 · NCDOT · C205073 · $250.00 per LF · qty 475.0 · bid tab
|
| water main 24-inch | LF | 1 | $500.00 | $500.00 to $500.00 | Bids- 2025-07-15 · NCDOT · C205073 · $500.00 per LF · qty 170.0 · bid tab
|
| water main 30-inch | LF | 1 | $680.00 | $680.00 to $680.00 | Bids- 2025-07-15 · NCDOT · C205073 · $680.00 per LF · qty 539.0 · bid tab
|
| water main 6-inch | LF | 1 | $300.00 | $300.00 to $300.00 | Bids- 2025-07-15 · NCDOT · C205073 · $300.00 per LF · qty 69.0 · bid tab
|
| water main 8-inch | LF | 1 | $150.00 | $150.00 to $150.00 | Bids- 2025-07-15 · NCDOT · C205073 · $150.00 per LF · qty 468.0 · bid tab
|
| water service | LF | 1 | $40.00 | $40.00 to $40.00 | Bids- 2025-07-15 · NCDOT · C205073 · $40.00 per LF · qty 497.0 · bid tab
|